Fifty years of scheduling: a survey of milestones
Author
Abstract
Suggested Citation
DOI: 10.1057/jors.2009.2
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Jianzhong Du & Joseph Y.-T. Leung, 1990. "Minimizing Total Tardiness on One Machine is NP-Hard," Mathematics of Operations Research, INFORMS, vol. 15(3), pages 483-495, August.
- A. Federgruen & H. Groenevelt, 1986. "Preemptive Scheduling of Uniform Machines by Ordinary Network Flow Techniques," Management Science, INFORMS, vol. 32(3), pages 341-349, March.
- Clyde L. Monma & Chris N. Potts, 1989. "On the Complexity of Scheduling with Batch Setup Times," Operations Research, INFORMS, vol. 37(5), pages 798-804, October.
- Zhi-Long Chen & Nicholas G. Hall, 2007. "Supply Chain Scheduling: Conflict and Cooperation in Assembly Systems," Operations Research, INFORMS, vol. 55(6), pages 1072-1089, December.
- Fred Glover, 1989. "Tabu Search---Part I," INFORMS Journal on Computing, INFORMS, vol. 1(3), pages 190-206, August.
- Hoogeveen, J. A. & van de Velde, S. L., 1991. "Scheduling around a small common due date," European Journal of Operational Research, Elsevier, vol. 55(2), pages 237-242, November.
- L. Gelders & P. R. Kleindorfer, 1974. "Coordinating Aggregate and Detailed Scheduling Decisions in the One-Machine Job Shop: Part I. Theory," Operations Research, INFORMS, vol. 22(1), pages 46-60, February.
- E. L. Lawler & J. M. Moore, 1969. "A Functional Equation and its Application to Resource Allocation and Sequencing Problems," Management Science, INFORMS, vol. 16(1), pages 77-84, September.
- Teofilo Gonzalez & Sartaj Sahni, 1978. "Flowshop and Jobshop Schedules: Complexity and Approximation," Operations Research, INFORMS, vol. 26(1), pages 36-52, February.
- C.R. Reeves, 1999. "Landscapes, operators and heuristic search," Annals of Operations Research, Springer, vol. 86(0), pages 473-490, January.
- Éric D. Taillard, 1994. "Parallel Taboo Search Techniques for the Job Shop Scheduling Problem," INFORMS Journal on Computing, INFORMS, vol. 6(2), pages 108-117, May.
- Dorit S. Hochbaum & Dan Landy, 1997. "Scheduling Semiconductor Burn-In Operations to Minimize Total Flowtime," Operations Research, INFORMS, vol. 45(6), pages 874-885, December.
- Clyde L. Monma & Jeffrey B. Sidney, 1979. "Sequencing with Series-Parallel Precedence Constraints," Mathematics of Operations Research, INFORMS, vol. 4(3), pages 215-224, August.
- Chris N. Potts & Luk N. Van Wassenhove, 1985. "A Branch and Bound Algorithm for the Total Weighted Tardiness Problem," Operations Research, INFORMS, vol. 33(2), pages 363-377, April.
- Linus Schrage, 1970. "Solving Resource-Constrained Network Problems by Implicit Enumeration—Nonpreemptive Case," Operations Research, INFORMS, vol. 18(2), pages 263-278, April.
- J. Carlier & E. Pinson, 1989. "An Algorithm for Solving the Job-Shop Problem," Management Science, INFORMS, vol. 35(2), pages 164-176, February.
- Rohde, K.I.M., 2005. "A reason for sophisticated investors not to seize arbitrage opportunities in markets without frictions," Research Memorandum 054, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
- Sheldon B. Akers & Joyce Friedman, 1955. "A Non-Numerical Approach to Production Scheduling Problems," Operations Research, INFORMS, vol. 3(4), pages 429-442, November.
- Carlier, Jacques, 1982. "The one-machine sequencing problem," European Journal of Operational Research, Elsevier, vol. 11(1), pages 42-47, September.
- J E Beasley & J Sonander & P Havelock, 2001. "Scheduling aircraft landings at London Heathrow using a population heuristic," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 52(5), pages 483-493, May.
- Eugeniusz Nowicki & Czeslaw Smutnicki, 1996. "A Fast Taboo Search Algorithm for the Job Shop Problem," Management Science, INFORMS, vol. 42(6), pages 797-813, June.
- Potts, C. N. & Van Wassenhove, L. N., 1983. "An algorithm for single machine sequencing with deadlines to minimize total weighted completion time," European Journal of Operational Research, Elsevier, vol. 12(4), pages 379-387, April.
- H. A. J. Crauwels & C. N. Potts & L. N. Van Wassenhove, 1998. "Local Search Heuristics for the Single Machine Total Weighted Tardiness Scheduling Problem," INFORMS Journal on Computing, INFORMS, vol. 10(3), pages 341-350, August.
- Edward J. Anderson & Chris N. Potts, 2004. "Online Scheduling of a Single Machine to Minimize Total Weighted Completion Time," Mathematics of Operations Research, INFORMS, vol. 29(3), pages 686-697, August.
- Richard K. Congram & Chris N. Potts & Steef L. van de Velde, 2002. "An Iterated Dynasearch Algorithm for the Single-Machine Total Weighted Tardiness Scheduling Problem," INFORMS Journal on Computing, INFORMS, vol. 14(1), pages 52-67, February.
- Zhi-Long Chen & Warren B. Powell, 1999. "Solving Parallel Machine Scheduling Problems by Column Generation," INFORMS Journal on Computing, INFORMS, vol. 11(1), pages 78-94, February.
- D. P. Williamson & L. A. Hall & J. A. Hoogeveen & C. A. J. Hurkens & J. K. Lenstra & S. V. Sevast'janov & D. B. Shmoys, 1997. "Short Shop Schedules," Operations Research, INFORMS, vol. 45(2), pages 288-294, April.
- L. Gelders & P. R. Kleindorfer, 1975. "Coordinating Aggregate and Detailed Scheduling in the One-Machine Job Shop: II—Computation and Structure," Operations Research, INFORMS, vol. 23(2), pages 312-324, April.
- Lee, Chung-Yee & Lin, Chen-Sin, 2001. "Single-machine scheduling with maintenance and repair rate-modifying activities," European Journal of Operational Research, Elsevier, vol. 135(3), pages 493-513, December.
- J. K. Lenstra & A. H. G. Rinnooy Kan, 1978. "Complexity of Scheduling under Precedence Constraints," Operations Research, INFORMS, vol. 26(1), pages 22-35, February.
- Leslie A. Hall & Andreas S. Schulz & David B. Shmoys & Joel Wein, 1997. "Scheduling to Minimize Average Completion Time: Off-Line and On-Line Approximation Algorithms," Mathematics of Operations Research, INFORMS, vol. 22(3), pages 513-544, August.
- Hamilton Emmons, 1969. "One-Machine Sequencing to Minimize Certain Functions of Job Tardiness," Operations Research, INFORMS, vol. 17(4), pages 701-715, August.
- B. J. Lageweg & J. K. Lenstra & A. H. G. Rinnooy Kan, 1978. "A General Bounding Scheme for the Permutation Flow-Shop Problem," Operations Research, INFORMS, vol. 26(1), pages 53-67, February.
- G. A. Croes, 1958. "A Method for Solving Traveling-Salesman Problems," Operations Research, INFORMS, vol. 6(6), pages 791-812, December.
- Robert McNaughton, 1959. "Scheduling with Deadlines and Loss Functions," Management Science, INFORMS, vol. 6(1), pages 1-12, October.
- John M. Charlton & Carl C. Death, 1970. "A Method of Solution for General Machine-Scheduling Problems," Operations Research, INFORMS, vol. 18(4), pages 689-707, August.
- Robert H. Storer & S. David Wu & Renzo Vaccari, 1992. "New Search Spaces for Sequencing Problems with Application to Job Shop Scheduling," Management Science, INFORMS, vol. 38(10), pages 1495-1509, October.
- Widmer, Marino & Hertz, Alain, 1989. "A new heuristic method for the flow shop sequencing problem," European Journal of Operational Research, Elsevier, vol. 41(2), pages 186-193, July.
- Graham McMahon & Michael Florian, 1975. "On Scheduling with Ready Times and Due Dates to Minimize Maximum Lateness," Operations Research, INFORMS, vol. 23(3), pages 475-482, June.
- Nicholas G. Hall & Wieslaw Kubiak & Suresh P. Sethi, 1991. "Earliness–Tardiness Scheduling Problems, II: Deviation of Completion Times About a Restrictive Common Due Date," Operations Research, INFORMS, vol. 39(5), pages 847-856, October.
- Bo Chen & Celia A. Glass & Chris N. Potts & Vitaly A. Strusevich, 1996. "A New Heuristic for Three-Machine Flow Shop Scheduling," Operations Research, INFORMS, vol. 44(6), pages 891-898, December.
- Mikhail Y. Kovalyov & Wieslaw Kubiak, 1999. "A Fully Polynomial Approximation Scheme for the Weighted Earliness–Tardiness Problem," Operations Research, INFORMS, vol. 47(5), pages 757-761, October.
- Han Hoogeveen & Petra Schuurman & Gerhard J. Woeginger, 2001. "Non-Approximability Results for Scheduling Problems with Minsum Criteria," INFORMS Journal on Computing, INFORMS, vol. 13(2), pages 157-168, May.
- Taillard, E., 1990. "Some efficient heuristic methods for the flow shop sequencing problem," European Journal of Operational Research, Elsevier, vol. 47(1), pages 65-74, July.
- Harlan Crowder & Manfred W. Padberg, 1980. "Solving Large-Scale Symmetric Travelling Salesman Problems to Optimality," Management Science, INFORMS, vol. 26(5), pages 495-509, May.
- Edward Ignall & Linus Schrage, 1965. "Application of the Branch and Bound Technique to Some Flow-Shop Scheduling Problems," Operations Research, INFORMS, vol. 13(3), pages 400-412, June.
- J. A. Hoogeveen & H. Oosterhout & S. L. van de Velde, 1994. "New Lower and Upper Bounds for Scheduling Around a Small Common Due Date," Operations Research, INFORMS, vol. 42(1), pages 102-110, February.
- Schmidt, Gunter, 2000. "Scheduling with limited machine availability," European Journal of Operational Research, Elsevier, vol. 121(1), pages 1-15, February.
- M. A. Kubzin & V. A. Strusevich, 2006. "Planning Machine Maintenance in Two-Machine Shop Scheduling," Operations Research, INFORMS, vol. 54(4), pages 789-800, August.
- Osman, IH & Potts, CN, 1989. "Simulated annealing for permutation flow-shop scheduling," Omega, Elsevier, vol. 17(6), pages 551-557.
- Michael H. Rothkopf, 1966. "Scheduling Independent Tasks on Parallel Processors," Management Science, INFORMS, vol. 12(5), pages 437-447, January.
- Kenneth R. Baker & Gary D. Scudder, 1990. "Sequencing with Earliness and Tardiness Penalties: A Review," Operations Research, INFORMS, vol. 38(1), pages 22-36, February.
- Wlodzimierz Szwarc, 1973. "Optimal Elimination Methods in the m × n Flow-Shop Scheduling Problem," Operations Research, INFORMS, vol. 21(6), pages 1250-1259, December.
- C.A. Glass & C.N. Potts & V.A. Strusevich, 2001. "Scheduling Batches with Sequential Job Processing for Two-Machine Flow and Open Shops," INFORMS Journal on Computing, INFORMS, vol. 13(2), pages 120-137, May.
- Lee, C. -Y. & Leon, V. J., 2001. "Machine scheduling with a rate-modifying activity," European Journal of Operational Research, Elsevier, vol. 128(1), pages 119-128, January.
- Sergey Sevast'janov, 1995. "Vector Summation in Banach Space and Polynomial Algorithms for Flow Shops and Open Shops," Mathematics of Operations Research, INFORMS, vol. 20(1), pages 90-103, February.
- M. R. Garey & D. S. Johnson & Ravi Sethi, 1976. "The Complexity of Flowshop and Jobshop Scheduling," Mathematics of Operations Research, INFORMS, vol. 1(2), pages 117-129, May.
- Nicholas G. Hall & Marc E. Posner, 1991. "Earliness-Tardiness Scheduling Problems, I: Weighted Deviation of Completion Times About a Common Due Date," Operations Research, INFORMS, vol. 39(5), pages 836-846, October.
- Eugene L. Lawler, 1964. "On Scheduling Problems with Deferral Costs," Management Science, INFORMS, vol. 11(2), pages 280-288, November.
- G. B. McMahon & P. G. Burton, 1967. "Flow-Shop Scheduling with the Branch-and-Bound Method," Operations Research, INFORMS, vol. 15(3), pages 473-481, June.
- Potts, C. N., 1980. "An adaptive branching rule for the permutation flow-shop problem," European Journal of Operational Research, Elsevier, vol. 5(1), pages 19-25, July.
- Maurice Queyranne & Yaoguang Wang, 1991. "Single-Machine Scheduling Polyhedra with Precedence Constraints," Mathematics of Operations Research, INFORMS, vol. 16(1), pages 1-20, February.
- Jason A. D. Atkin & Edmund K. Burke & John S. Greenwood & Dale Reeson, 2007. "Hybrid Metaheuristics to Aid Runway Scheduling at London Heathrow Airport," Transportation Science, INFORMS, vol. 41(1), pages 90-106, February.
- Nowicki, Eugeniusz & Smutnicki, Czeslaw, 1996. "A fast tabu search algorithm for the permutation flow-shop problem," European Journal of Operational Research, Elsevier, vol. 91(1), pages 160-175, May.
- J. M. van den Akker & J. A. Hoogeveen & S. L. van de Velde, 1999. "Parallel Machine Scheduling by Column Generation," Operations Research, INFORMS, vol. 47(6), pages 862-872, December.
- Bo Chen & Vitaly A. Strusevich, 1993. "Approximation Algorithms for Three-Machine Open Shop Scheduling," INFORMS Journal on Computing, INFORMS, vol. 5(3), pages 321-326, August.
- A. H. G. Rinnooy Kan & B. J. Lageweg & J. K. Lenstra, 1975. "Minimizing Total Costs in One-Machine Scheduling," Operations Research, INFORMS, vol. 23(5), pages 908-927, October.
- Joseph Adams & Egon Balas & Daniel Zawack, 1988. "The Shifting Bottleneck Procedure for Job Shop Scheduling," Management Science, INFORMS, vol. 34(3), pages 391-401, March.
- Fred Glover, 1990. "Tabu Search—Part II," INFORMS Journal on Computing, INFORMS, vol. 2(1), pages 4-32, February.
- Potts, Chris N. & Kovalyov, Mikhail Y., 2000. "Scheduling with batching: A review," European Journal of Operational Research, Elsevier, vol. 120(2), pages 228-249, January.
- Joel Shwimer, 1972. "On the N-Job One-Machine, Sequence-Independent Scheduling Problem with Tardiness Penalties: A Branch-Bound Solution," Management Science, INFORMS, vol. 18(6), pages 301-313, February.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Blazewicz, Jacek & Domschke, Wolfgang & Pesch, Erwin, 1996. "The job shop scheduling problem: Conventional and new solution techniques," European Journal of Operational Research, Elsevier, vol. 93(1), pages 1-33, August.
- Jain, A. S. & Meeran, S., 1999. "Deterministic job-shop scheduling: Past, present and future," European Journal of Operational Research, Elsevier, vol. 113(2), pages 390-434, March.
- Da Col, Giacomo & Teppan, Erich C., 2022. "Industrial-size job shop scheduling with constraint programming," Operations Research Perspectives, Elsevier, vol. 9(C).
- Koulamas, Christos & Kyparisis, George J., 2023. "A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems," European Journal of Operational Research, Elsevier, vol. 305(3), pages 999-1017.
- J M Framinan & J N D Gupta & R Leisten, 2004. "A review and classification of heuristics for permutation flow-shop scheduling with makespan objective," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(12), pages 1243-1255, December.
- M Haouari & T Ladhari, 2003. "A branch-and-bound-based local search method for the flow shop problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(10), pages 1076-1084, October.
- Ahmadian, Mohammad Mahdi & Khatami, Mostafa & Salehipour, Amir & Cheng, T.C.E., 2021. "Four decades of research on the open-shop scheduling problem to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 295(2), pages 399-426.
- Hans Kellerer & Vitaly A. Strusevich, 2016. "Optimizing the half-product and related quadratic Boolean functions: approximation and scheduling applications," Annals of Operations Research, Springer, vol. 240(1), pages 39-94, May.
- Louis-Philippe Bigras & Michel Gamache & Gilles Savard, 2008. "Time-Indexed Formulations and the Total Weighted Tardiness Problem," INFORMS Journal on Computing, INFORMS, vol. 20(1), pages 133-142, February.
- Stanisław Gawiejnowicz, 2020. "A review of four decades of time-dependent scheduling: main results, new topics, and open problems," Journal of Scheduling, Springer, vol. 23(1), pages 3-47, February.
- Sündüz Dağ, 2013. "An Application On Flowshop Scheduling," Alphanumeric Journal, Bahadir Fatih Yildirim, vol. 1(1), pages 47-56, December.
- Z C Zhu & K M Ng & H L Ong, 2010. "A modified tabu search algorithm for cost-based job shop problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(4), pages 611-619, April.
- Dimitris Fouskakis & David Draper, 2002. "Stochastic Optimization: a Review," International Statistical Review, International Statistical Institute, vol. 70(3), pages 315-349, December.
- F. Guerriero, 2008. "Hybrid Rollout Approaches for the Job Shop Scheduling Problem," Journal of Optimization Theory and Applications, Springer, vol. 139(2), pages 419-438, November.
- Susana Fernandes & Helena Ramalhinho-Lourenço, 2007. "A simple optimised search heuristic for the job-shop scheduling problem," Economics Working Papers 1050, Department of Economics and Business, Universitat Pompeu Fabra.
- T. C. E. Cheng & Bo Peng & Zhipeng Lü, 2016. "A hybrid evolutionary algorithm to solve the job shop scheduling problem," Annals of Operations Research, Springer, vol. 242(2), pages 223-237, July.
- Olivier Ploton & Vincent T’kindt, 2023. "Moderate worst-case complexity bounds for the permutation flowshop scheduling problem using Inclusion–Exclusion," Journal of Scheduling, Springer, vol. 26(2), pages 137-145, April.
- Gordon, Valery & Proth, Jean-Marie & Chu, Chengbin, 2002. "A survey of the state-of-the-art of common due date assignment and scheduling research," European Journal of Operational Research, Elsevier, vol. 139(1), pages 1-25, May.
- Hoogeveen, Han, 2005. "Multicriteria scheduling," European Journal of Operational Research, Elsevier, vol. 167(3), pages 592-623, December.
- Ganesan, Viswanath Kumar & Sivakumar, Appa Iyer, 2006. "Scheduling in static jobshops for minimizing mean flowtime subject to minimum total deviation of job completion times," International Journal of Production Economics, Elsevier, vol. 103(2), pages 633-647, October.
More about this item
Keywords
scheduling; history; milestones;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:60:y:2009:i:1:d:10.1057_jors.2009.2. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.