Optimizing the half-product and related quadratic Boolean functions: approximation and scheduling applications
Author
Abstract
Suggested Citation
DOI: 10.1007/s10479-015-2018-y
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- E. L. Lawler & J. M. Moore, 1969. "A Functional Equation and its Application to Resource Allocation and Sequencing Problems," Management Science, INFORMS, vol. 16(1), pages 77-84, September.
- Prabuddha De & Jay B. Ghosh & Charles E. Wells, 1989. "Note---A Note on the Minimization of Mean Squared Deviation of Completion Times About a Common Due Date," Management Science, INFORMS, vol. 35(9), pages 1143-1147, September.
- Yang, Suh-Jenq & Yang, Dar-Li, 2010. "Minimizing the makespan on single-machine scheduling with aging effect and variable maintenance activities," Omega, Elsevier, vol. 38(6), pages 528-533, December.
- Janiak, Adam & Kovalyov, Mikhail Y. & Kubiak, Wieslaw & Werner, Frank, 2005. "Positive half-products and scheduling with controllable processing times," European Journal of Operational Research, Elsevier, vol. 165(2), pages 416-422, September.
- Nicholas G. Hall & Wieslaw Kubiak & Suresh P. Sethi, 1991. "Earliness–Tardiness Scheduling Problems, II: Deviation of Completion Times About a Restrictive Common Due Date," Operations Research, INFORMS, vol. 39(5), pages 847-856, October.
- Xu, Zhou, 2012. "A strongly polynomial FPTAS for the symmetric quadratic knapsack problem," European Journal of Operational Research, Elsevier, vol. 218(2), pages 377-381.
- Nicholas G. Hall & Marc E. Posner, 1991. "Earliness-Tardiness Scheduling Problems, I: Weighted Deviation of Completion Times About a Common Due Date," Operations Research, INFORMS, vol. 39(5), pages 836-846, October.
- Kubiak, Wieslaw & Cheng, Jinliang & Kovalyov, Mikhail Y., 2002. "Fast fully polynomial approximation schemes for minimizing completion time variance," European Journal of Operational Research, Elsevier, vol. 137(2), pages 303-309, March.
- T. Badics & E. Boros, 1998. "Minimization of Half-Products," Mathematics of Operations Research, INFORMS, vol. 23(3), pages 649-660, August.
- Gerhard J. Woeginger, 1999. "An Approximation Scheme for Minimizing Agreeably Weighted Variance on a Single Machine," INFORMS Journal on Computing, INFORMS, vol. 11(2), pages 211-216, May.
- Prabuddha De & Jay B. Ghosh & Charles E. Wells, 1992. "On the Minimization of Completion Time Variance with a Bicriteria Extension," Operations Research, INFORMS, vol. 40(6), pages 1148-1155, December.
- Stephan Foldes & Peter L. Hammer, 2005. "Submodularity, Supermodularity, and Higher-Order Monotonicities of Pseudo-Boolean Functions," Mathematics of Operations Research, INFORMS, vol. 30(2), pages 453-461, May.
- J. A. Hoogeveen & H. Oosterhout & S. L. van de Velde, 1994. "New Lower and Upper Bounds for Scheduling Around a Small Common Due Date," Operations Research, INFORMS, vol. 42(1), pages 102-110, February.
- Kuo, Wen-Hung & Yang, Dar-Li, 2006. "Minimizing the total completion time in a single-machine scheduling problem with a time-dependent learning effect," European Journal of Operational Research, Elsevier, vol. 174(2), pages 1184-1190, October.
- Cheng, Jinliang & Kubiak, Wieslaw, 2005. "A half-product based approximation scheme for agreeably weighted completion time variance," European Journal of Operational Research, Elsevier, vol. 162(1), pages 45-54, April.
- Kellerer, Hans & Strusevich, Vitaly, 2013. "Fast approximation schemes for Boolean programming and scheduling problems related to positive convex Half-Product," European Journal of Operational Research, Elsevier, vol. 228(1), pages 24-32.
- Cai, X., 1995. "Minimization of agreeably weighted variance in single machine systems," European Journal of Operational Research, Elsevier, vol. 85(3), pages 576-592, September.
- Guoqing Wang & Hongyi Sun & Chengbin Chu, 2005. "Preemptive Scheduling with Availability Constraints to Minimize Total Weighted Completion Times," Annals of Operations Research, Springer, vol. 133(1), pages 183-192, January.
- Allesandro Agnetis & Pitu B. Mirchandani & Dario Pacciarelli & Andrea Pacifici, 2004. "Scheduling Problems with Two Competing Agents," Operations Research, INFORMS, vol. 52(2), pages 229-242, April.
- J. M. W. Rhys, 1970. "A Selection Problem of Shared Fixed Costs and Network Flows," Management Science, INFORMS, vol. 17(3), pages 200-207, November.
- Mikhail Y. Kovalyov & Wieslaw Kubiak, 1999. "A Fully Polynomial Approximation Scheme for the Weighted Earliness–Tardiness Problem," Operations Research, INFORMS, vol. 47(5), pages 757-761, October.
- Uttarayan Bagchi & Robert S. Sullivan & Yih-Long Chang, 1987. "Minimizing Mean Squared Deviation of Completion Times About a Common Due Date," Management Science, INFORMS, vol. 33(7), pages 894-906, July.
- John J. Kanet, 1981. "Minimizing Variation of Flow Time in Single Machine Systems," Management Science, INFORMS, vol. 27(12), pages 1453-1459, December.
- Kellerer, Hans & Kubzin, Mikhail A. & Strusevich, Vitaly A., 2009. "Two simple constant ratio approximation algorithms for minimizing the total weighted completion time on a single machine with a fixed non-availability interval," European Journal of Operational Research, Elsevier, vol. 199(1), pages 111-116, November.
- Fisher, M.L. & Nemhauser, G.L. & Wolsey, L.A., 1978. "An analysis of approximations for maximizing submodular set functions," LIDAM Reprints CORE 341, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Fisher, M.L. & Nemhauser, G.L. & Wolsey, L.A., 1978. "An analysis of approximations for maximizing submodular set functions - 1," LIDAM Reprints CORE 334, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Hoogeveen, J. A. & van de Velde, S. L., 1991. "Scheduling around a small common due date," European Journal of Operational Research, Elsevier, vol. 55(2), pages 237-242, November.
- Kacem, Imed & Chu, Chengbin, 2008. "Worst-case analysis of the WSPT and MWSPT rules for single machine scheduling with one planned setup period," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1080-1089, June.
- Gerhard J. Woeginger, 2000. "When Does a Dynamic Programming Formulation Guarantee the Existence of a Fully Polynomial Time Approximation Scheme (FPTAS)?," INFORMS Journal on Computing, INFORMS, vol. 12(1), pages 57-74, February.
- Breit, Joachim, 2007. "Improved approximation for non-preemptive single machine flow-time scheduling with an availability constraint," European Journal of Operational Research, Elsevier, vol. 183(2), pages 516-524, December.
- M. A. Kubzin & V. A. Strusevich, 2006. "Planning Machine Maintenance in Two-Machine Shop Scheduling," Operations Research, INFORMS, vol. 54(4), pages 789-800, August.
- Alan G. Merten & Mervin E. Muller, 1972. "Variance Minimization in Single Machine Sequencing Problems," Management Science, INFORMS, vol. 18(9), pages 518-528, May.
- Sadfi, Cherif & Penz, Bernard & Rapine, Christophe & Blazewicz, Jacek & Formanowicz, Piotr, 2005. "An improved approximation algorithm for the single machine total completion time scheduling problem with availability constraints," European Journal of Operational Research, Elsevier, vol. 161(1), pages 3-10, February.
- Kabir Rustogi & Vitaly A Strusevich, 2015. "Single machine scheduling with time-dependent linear deterioration and rate-modifying maintenance," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 66(3), pages 500-515, March.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Kellerer, Hans & Rustogi, Kabir & Strusevich, Vitaly A., 2020. "A fast FPTAS for single machine scheduling problem of minimizing total weighted earliness and tardiness about a large common due date," Omega, Elsevier, vol. 90(C).
- Halman, Nir & Kellerer, Hans & Strusevich, Vitaly A., 2018. "Approximation schemes for non-separable non-linear boolean programming problems under nested knapsack constraints," European Journal of Operational Research, Elsevier, vol. 270(2), pages 435-447.
- Shi-Sheng Li & Ren-Xia Chen & Qi Feng & Cheng-Wen Jiao, 2019. "Parallel-machine scheduling with job-dependent cumulative deterioration effect and rejection," Journal of Combinatorial Optimization, Springer, vol. 38(3), pages 957-971, October.
- Baruch Mor & Dana Shapira, 2022. "Single machine scheduling with non-availability interval and optional job rejection," Journal of Combinatorial Optimization, Springer, vol. 44(1), pages 480-497, August.
- Kabir Rustogi & Vitaly A. Strusevich, 2017. "Single machine scheduling with a generalized job-dependent cumulative effect," Journal of Scheduling, Springer, vol. 20(6), pages 583-592, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Gordon, Valery & Proth, Jean-Marie & Chu, Chengbin, 2002. "A survey of the state-of-the-art of common due date assignment and scheduling research," European Journal of Operational Research, Elsevier, vol. 139(1), pages 1-25, May.
- Koulamas, Christos & Kyparisis, George J., 2023. "A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems," European Journal of Operational Research, Elsevier, vol. 305(3), pages 999-1017.
- Nessah, Rabia & Chu, Chengbin, 2010.
"A lower bound for weighted completion time variance,"
European Journal of Operational Research, Elsevier, vol. 207(3), pages 1221-1226, December.
- R. Nessah & C. Chu, 2010. "A lower bound for weighted completion time variance," Post-Print hal-00572982, HAL.
- C N Potts & V A Strusevich, 2009. "Fifty years of scheduling: a survey of milestones," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 41-68, May.
- Ng, C. T. & Cai, X. & Cheng, T. C. E., 1996. "A tight lower bound for the completion time variance problem," European Journal of Operational Research, Elsevier, vol. 92(1), pages 211-213, July.
- Cai, X., 1996. "V-shape property for job sequences that minimize the expected completion time variance," European Journal of Operational Research, Elsevier, vol. 91(1), pages 118-123, May.
- Srirangacharyulu, B. & Srinivasan, G., 2013. "An exact algorithm to minimize mean squared deviation of job completion times about a common due date," European Journal of Operational Research, Elsevier, vol. 231(3), pages 547-556.
- X. Cai & F. S. Tu, 1996. "Scheduling jobs with random processing times on a single machine subject to stochastic breakdowns to minimize early‐tardy penalties," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(8), pages 1127-1146, December.
- Cai, X. & Lum, V. Y. S. & Chan, J. M. T., 1997. "Scheduling about a common due date with kob-dependent asymmetric earliness and tardiness penalties," European Journal of Operational Research, Elsevier, vol. 98(1), pages 154-168, April.
- Cheng, Jinliang & Kubiak, Wieslaw, 2005. "A half-product based approximation scheme for agreeably weighted completion time variance," European Journal of Operational Research, Elsevier, vol. 162(1), pages 45-54, April.
- Koulamas, Christos & Kyparisis, George J., 2023. "Two-stage no-wait proportionate flow shop scheduling with minimal service time variation and optional job rejection," European Journal of Operational Research, Elsevier, vol. 305(2), pages 608-616.
- Kellerer, Hans & Rustogi, Kabir & Strusevich, Vitaly A., 2020. "A fast FPTAS for single machine scheduling problem of minimizing total weighted earliness and tardiness about a large common due date," Omega, Elsevier, vol. 90(C).
- Pereira, Jordi & Vásquez, Óscar C., 2017. "The single machine weighted mean squared deviation problem," European Journal of Operational Research, Elsevier, vol. 261(2), pages 515-529.
- Sridharan, V. & Zhou, Z., 1996. "A decision theory based scheduling procedure for single-machine weighted earliness and tardiness problems," European Journal of Operational Research, Elsevier, vol. 94(2), pages 292-301, October.
- Kubiak, Wieslaw & Cheng, Jinliang & Kovalyov, Mikhail Y., 2002. "Fast fully polynomial approximation schemes for minimizing completion time variance," European Journal of Operational Research, Elsevier, vol. 137(2), pages 303-309, March.
- Cai, X., 1995. "Minimization of agreeably weighted variance in single machine systems," European Journal of Operational Research, Elsevier, vol. 85(3), pages 576-592, September.
- Helmut A. Sedding, 2020. "Scheduling jobs with a V-shaped time-dependent processing time," Journal of Scheduling, Springer, vol. 23(6), pages 751-768, December.
- Halman, Nir & Kellerer, Hans & Strusevich, Vitaly A., 2018. "Approximation schemes for non-separable non-linear boolean programming problems under nested knapsack constraints," European Journal of Operational Research, Elsevier, vol. 270(2), pages 435-447.
- Weng, Xiaohua & Ventura, Jose A., 1996. "Scheduling about a given common due date to minimize mean squared deviation of completion times," European Journal of Operational Research, Elsevier, vol. 88(2), pages 328-335, January.
- Sergey Kovalev, 2015. "Maximizing total tardiness on a single machine in $$O(n^2)$$ O ( n 2 ) time via a reduction to half-product minimization," Annals of Operations Research, Springer, vol. 235(1), pages 815-819, December.
More about this item
Keywords
Quadratic knapsack; Half-product; Single machine scheduling; FPTAS;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:240:y:2016:i:1:d:10.1007_s10479-015-2018-y. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.