Capacity allocation in vertically integrated rail systems: A bargaining approach
Author
Abstract
Suggested Citation
DOI: 10.1016/j.trb.2017.12.001
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Rubinstein, Ariel, 1982.
"Perfect Equilibrium in a Bargaining Model,"
Econometrica, Econometric Society, vol. 50(1), pages 97-109, January.
- Ariel Rubinstein, 2010. "Perfect Equilibrium in a Bargaining Model," Levine's Working Paper Archive 661465000000000387, David K. Levine.
- Ariel Rubinstein, 2010. "Perfect Equilibrium in a Bargaining Model," Levine's Working Paper Archive 252, David K. Levine.
- Y-C Lai & M Dingler & S-Y Lin & K-C Liu, 2013. "Optimal track class assignment for a railroad network," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 64(12), pages 1800-1809, December.
- Brewer, Paul J. & Plott, Charles R., 1996.
"A binary conflict ascending price (BICAP) mechanism for the decentralized allocation of the right to use railroad tracks,"
International Journal of Industrial Organization, Elsevier, vol. 14(6), pages 857-886, October.
- Brewer, Paul J. & Plott, Charles R., "undated". "A Binary Conflict Ascending Price (BICAP) Mechanism for the Decentralized Allocation of the Right to Use Railroad Tracks," Working Papers 887, California Institute of Technology, Division of the Humanities and Social Sciences.
- Harrod, Steven, 2013. "Auction pricing of network access for North American railways," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 49(1), pages 176-189.
- Harker, Patrick T. & Hong, Sungwook, 1994. "Pricing of track time in railroad operations: An internal market approach," Transportation Research Part B: Methodological, Elsevier, vol. 28(3), pages 197-212, June.
- Steven Harrod, 2011. "Modeling Network Transition Constraints with Hypergraphs," Transportation Science, INFORMS, vol. 45(1), pages 81-97, February.
- Vansteenwegen, P. & Van Oudheusden, D., 2007. "Decreasing the passenger waiting time for an intercity rail network," Transportation Research Part B: Methodological, Elsevier, vol. 41(4), pages 478-492, May.
- Chris Hendrickson & George Kocur, 1981. "Schedule Delay and Departure Time Decisions in a Deterministic Model," Transportation Science, INFORMS, vol. 15(1), pages 62-77, February.
- Marc Gaudry & Emile Quinet, 2009. "Track wear-and-tear cost by traffic class: Functional form, zero output levels and marginal cost pricing recovery on the French rail network," Working Papers halshs-00574977, HAL.
- Phill Wheat & Andrew S. J. Smith, 2008. "Assessing the Marginal Infrastructure Maintenance Wear and Tear Costs for Britain's Railway Network," Journal of Transport Economics and Policy, University of Bath, vol. 42(2), pages 189-224, May.
- Andersson, Mats & Smith, Andrew & Wikberg, Åsa & Wheat, Phill, 2012. "Estimating the marginal cost of railway track renewals using corner solution models," Transportation Research Part A: Policy and Practice, Elsevier, vol. 46(6), pages 954-964.
- Talebian, Ahmadreza & Zou, Bo, 2015. "Integrated modeling of high performance passenger and freight train planning on shared-use corridors in the US," Transportation Research Part B: Methodological, Elsevier, vol. 82(C), pages 114-140.
- Kennan, John & Wilson, Robert, 1993.
"Bargaining with Private Information,"
Journal of Economic Literature, American Economic Association, vol. 31(1), pages 45-104, March.
- Kennan, J. & Wilson, R., 1991. "Bargaining with Private Information," Working Papers 90-01rev, University of Iowa, Department of Economics.
- Ivaldi, M & McCullough, G J, 2001.
"Density and Integration Effects on Class I U.S. Freight Railroads,"
Journal of Regulatory Economics, Springer, vol. 19(2), pages 161-182, March.
- Ivaldi, M. & McCullough, G., 1999. "Density and Integration Effects on Class I U.S. Freight Railroads," Papers 99.526, Toulouse - GREMAQ.
- Ivaldi, Marc & Mccullough, Gerard J., 1999. "Density and Integration Effects on Class I U.S. Freight Railroads," IDEI Working Papers 93, Institut d'Économie Industrielle (IDEI), Toulouse.
- Johansson, Per & Nilsson, Jan-Eric, 2004. "An economic analysis of track maintenance costs," Transport Policy, Elsevier, vol. 11(3), pages 277-286, July.
- Bugarinovic, Mirjana & Boskovic, Branislav, 2015. "A systems approach to access charges in unbundling railways," European Journal of Operational Research, Elsevier, vol. 240(3), pages 848-860.
- Markus Lang & Marc Laperrouza & Matthias Finger, 2013.
"Competition Effects in a Liberalized Railway Market,"
Journal of Industry, Competition and Trade, Springer, vol. 13(3), pages 375-398, September.
- Markus Lang & Marc Laperrouza & Matthias Finger, 2010. "Competition Effects in a Liberalized Railway Market," Working Papers 0131, University of Zurich, Institute for Strategy and Business Economics (ISU), revised Apr 2011.
- Kennedy, David, 1997. "Regulating access to the railway network," Utilities Policy, Elsevier, vol. 6(1), pages 57-65, March.
- David Gillen & David Levinson & Jean Michel Mathieu & Adib Kanafani, 1997.
"The full cost of high-speed rail: an engineering approach,"
The Annals of Regional Science, Springer;Western Regional Science Association, vol. 31(2), pages 189-215.
- David Levinson & Jean-Michel Mathieu & Adib Kanafani & David Gillen, 1997. "The Full Cost of High-Speed Rail: An Engineering Approach," Working Papers 199705, University of Minnesota: Nexus Research Group.
- Gibson, Stephen, 2003. "Allocation of capacity in the rail industry," Utilities Policy, Elsevier, vol. 11(1), pages 39-42, March.
- R. Borndörfer & M. Grötschel & S. Lukac & K. Mitusch & T. Schlechte & S. Schultz & A. Tanner, 2006. "An Auction Approach to Railway Slot Allocation," Competition and Regulation in Network Industries, Intersentia, vol. 7(2), pages 163-197, June.
- Nilsson, Jan-Eric, 1999. "Allocation of track capacity: Experimental evidence on the use of priority auctioning in the railway industry," International Journal of Industrial Organization, Elsevier, vol. 17(8), pages 1139-1162, November.
- John D. Bitzan, 2003. "Railroad Costs and Competition: The Implications of Introducing Competition to Railroad Networks," Journal of Transport Economics and Policy, University of Bath, vol. 37(2), pages 201-225, May.
- Andersson, Mats, 2011. "Marginal cost of railway infrastructure wear and tear for freight and passenger trains in Sweden," European Transport \ Trasporti Europei, ISTIEE, Institute for the Study of Transport within the European Economic Integration, issue 48, pages 3-23.
- Marc Gaudry & Emile Quinet, 2009. "Track wear-and-tear cost by traffic class: Functional form, zero output levels and marginal cost pricing recovery on the French rail network," PSE Working Papers halshs-00574977, HAL.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Stojadinović, Nikola & Bošković, Branislav & Trifunović, Dejan & Janković, Slađana, 2019. "Train path congestion management: Using hybrid auctions for decentralized railway capacity allocation," Transportation Research Part A: Policy and Practice, Elsevier, vol. 129(C), pages 123-139.
- Zheng, Shiyuan & Ge, Ying-En & Fu, Xiaowen & Jiang, Changmin, 2019. "Voluntary carbon offset and airline alliance," Transportation Research Part B: Methodological, Elsevier, vol. 123(C), pages 110-126.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Bugarinovic, Mirjana & Boskovic, Branislav, 2015. "A systems approach to access charges in unbundling railways," European Journal of Operational Research, Elsevier, vol. 240(3), pages 848-860.
- Odolinski, Kristofer & Wheat, Phill, 2018. "Dynamics in rail infrastructure provision: Maintenance and renewal costs in Sweden," Economics of Transportation, Elsevier, vol. 14(C), pages 21-30.
- Andersson, Mats & Björklund, Gunilla, 2012. "Marginal railway track renewal costs: a survival data approach," Working papers in Transport Economics 2012:29, CTS - Centre for Transport Studies Stockholm (KTH and VTI).
- Odolinski, Kristofer, 2016. "Estimating the impact of traffic on rail infrastructure maintenance costs: The importance of axle loads," Working papers in Transport Economics 2016:21, CTS - Centre for Transport Studies Stockholm (KTH and VTI), revised 14 Nov 2018.
- Odolinski, Kristofer & Boysen, Hans E., 2018. "Railway line capacity utilisation and its impact on maintenance costs," Working papers in Transport Economics 2018:10, CTS - Centre for Transport Studies Stockholm (KTH and VTI), revised 30 Oct 2018.
- Andersson, Mats & Björklund, Gunilla & Haraldsson, Mattias, 2016. "Marginal railway track renewal costs: A survival data approach," Transportation Research Part A: Policy and Practice, Elsevier, vol. 87(C), pages 68-77.
- Stojadinović, Nikola & Bošković, Branislav & Trifunović, Dejan & Janković, Slađana, 2019. "Train path congestion management: Using hybrid auctions for decentralized railway capacity allocation," Transportation Research Part A: Policy and Practice, Elsevier, vol. 129(C), pages 123-139.
- Marc Gaudry & Bernard Lapeyre & Emile Quinet, 2015. "Infrastructure maintenance, regeneration and service quality economics: A rail example," PSE Working Papers halshs-00559637, HAL.
- Martin Savelsbergh & Masoud Talebian, 2019. "Cost allocation under competition: a new rail access charging policy," EURO Journal on Transportation and Logistics, Springer;EURO - The Association of European Operational Research Societies, vol. 8(5), pages 511-534, December.
- Odolinski, Kristofer & Nilsson, Jan-Eric, 2017. "Estimating the marginal maintenance cost of rail infrastructure usage in Sweden; does more data make a difference?," Economics of Transportation, Elsevier, vol. 10(C), pages 8-17.
- Perennes, Patricia, 2014. "Use of combinatorial auctions in the railway industry: Can the “invisible hand” draw the railway timetable?," Transportation Research Part A: Policy and Practice, Elsevier, vol. 67(C), pages 175-187.
- Marc Gaudry & Emile Quinet, 2016. "Box-Cox transformations of terms nesting the Trans-Log: the example of rail infrastructure maintenance cost," PSE Working Papers halshs-01261980, HAL.
- Odolinski, Kristofer & Nilsson, Jan-Eric, 2016. "Estimating the marginal maintenance cost of rail infrastructure usage in Sweden; does more data make a difference?," Working papers in Transport Economics 2016:27, CTS - Centre for Transport Studies Stockholm (KTH and VTI), revised 13 May 2017.
- Odolinski, Kristofer & Nilsson, Jan-Eric & Yarmukhamedov, Sherzod & Haraldsson, Mattias, 2020. "The marginal cost of track renewals in the Swedish railway network: Using data to compare methods," Economics of Transportation, Elsevier, vol. 22(C).
- Nilsson, Jan-Eric, 2002. "Towards a welfare enhancing process to manage railway infrastructure access," Transportation Research Part A: Policy and Practice, Elsevier, vol. 36(5), pages 419-436, June.
- Kuo, April & Miller-Hooks, Elise, 2012. "Developing Responsive Rail Services through collaboration," Transportation Research Part B: Methodological, Elsevier, vol. 46(3), pages 424-439.
- Mauleon, Ana & Vannetelbosch, Vincent J., 2003.
"Market competition and strike activity,"
International Journal of Industrial Organization, Elsevier, vol. 21(5), pages 737-758, May.
- MAULEON , Ana & VANNETELBOSCH, Vincent J., 2003. "Market competition and strike activity," LIDAM Reprints CORE 1658, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Paul J. Brewer & Charles R. Plott, 2002. "A Decentralized, Smart Market Solution to a Class of Back-Haul Transportation Problems: Concept and Experimental Test Beds," Interfaces, INFORMS, vol. 32(5), pages 13-36, October.
- Marc Gaudry & Emile Quinet, 2015. "Correlation within SNCF administrative regions among track segment maintenance cost equation residuals of a country-wide model," Working Papers halshs-01112249, HAL.
- Merlo, Antonio & Ortalo-Magne, Francois, 2004.
"Bargaining over residential real estate: evidence from England,"
Journal of Urban Economics, Elsevier, vol. 56(2), pages 192-216, September.
- Francois Ortalo-Magne, 2001. "Bargaining over Residential Real Estate: Evidence form England," ERES eres2001_251, European Real Estate Society (ERES).
- Antonio M. Merlo & François Ortalo-Magné, 2002. "Bargaining over Residential Real Estate: Evidence from England," CESifo Working Paper Series 778, CESifo.
- François Ortalo-Magné & Antonio Merlo, 2002. "Bargaining over Residential Real Estate: Evidence from England," Wisconsin-Madison CULER working papers 02-02, University of Wisconsin Center for Urban Land Economic Research.
More about this item
Keywords
Rail line capacity allocation; Vertically integrated systems; Bargaining game; Train schedule; Payment; Complete and incomplete information;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:transb:v:107:y:2018:i:c:p:167-191. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/548/description#description .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.