Towards System State Dispatching in High‐Variety Manufacturing
Author
Abstract
Suggested Citation
DOI: 10.1016/j.omega.2022.102726
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Ari P. J. Vepsalainen & Thomas E. Morton, 1987. "Priority Rules for Job Shops with Weighted Tardiness Costs," Management Science, INFORMS, vol. 33(8), pages 1035-1047, August.
- Bai, Danyu & Tang, Mengqian & Zhang, Zhi-Hai & Santibanez-Gonzalez, Ernesto DR, 2018. "Flow shop learning effect scheduling problem with release dates," Omega, Elsevier, vol. 78(C), pages 21-38.
- Nuno O. Fernandes & Matthias Thürer & Tatiana M. Pinho & Pedro Torres & Sílvio Carmo-Silva, 2020. "Workload control and optimised order release: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 58(10), pages 3180-3193, May.
- Land, Martin J. & Stevenson, Mark & Thürer, Matthias & Gaalman, Gerard J.C., 2015. "Job shop control: In search of the key to delivery improvements," International Journal of Production Economics, Elsevier, vol. 168(C), pages 257-266.
- Manuel Schneckenreither & Stefan Haeussler & Christoph Gerhold, 2021. "Order release planning with predictive lead times: a machine learning approach," International Journal of Production Research, Taylor & Francis Journals, vol. 59(11), pages 3285-3303, June.
- Land, Martin, 2006. "Parameters and sensitivity in workload control," International Journal of Production Economics, Elsevier, vol. 104(2), pages 625-638, December.
- Stefan Haeussler & Pia Netzer, 2020. "Comparison between rule- and optimization-based workload control concepts: a simulation optimization approach," International Journal of Production Research, Taylor & Francis Journals, vol. 58(12), pages 3724-3743, June.
- Ferreira, Cristiane & Figueira, Gonçalo & Amorim, Pedro, 2022. "Effective and interpretable dispatching rules for dynamic job shops via guided empirical learning," Omega, Elsevier, vol. 111(C).
- Chakravorty, Satya S., 2001. "An evaluation of the DBR control mechanism in a job shop environment," Omega, Elsevier, vol. 29(4), pages 335-342, August.
- Fernandes, Nuno O. & Thürer, Matthias & Silva, Cristóvão & Carmo-Silva, Sílvio, 2017. "Improving workload control order release: Incorporating a starvation avoidance trigger into continuous release," International Journal of Production Economics, Elsevier, vol. 194(C), pages 181-189.
- R. W. Conway & W. L. Maxwell, 1962. "Network Dispatching by the Shortest-Operation Discipline," Operations Research, INFORMS, vol. 10(1), pages 51-73, February.
- Land, Martin & Gaalman, Gerard, 1996. "Workload control concepts in job shops A critical assessment," International Journal of Production Economics, Elsevier, vol. 46(1), pages 535-548, December.
- S. S. Panwalkar & Wafik Iskander, 1977. "A Survey of Scheduling Rules," Operations Research, INFORMS, vol. 25(1), pages 45-61, February.
- Matthias Thürer & Mark Stevenson & Martin J. Land & Larry D. Fredendall, 2019. "On the combined effect of due date setting, order release, and output control: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 57(6), pages 1741-1755, March.
- Bertrand, J. W. M. & Muntslag, D. R., 1993. "Production control in engineer-to-order firms," International Journal of Production Economics, Elsevier, vol. 30(1), pages 3-22, July.
- Matthias Thürer & Nuno O. Fernandes & Mark Stevenson, 2020. "Material Flow Control in High‐Variety Make‐to‐Order Shops: Combining COBACABANA and POLCA," Production and Operations Management, Production and Operations Management Society, vol. 29(9), pages 2138-2152, September.
- Ramasesh, R, 1990. "Dynamic job shop scheduling: A survey of simulation research," Omega, Elsevier, vol. 18(1), pages 43-57.
- Soepenberg, G.D. & Land, M.J. & Gaalman, G.J.C., 2012. "Adapting workload control for job shops with high routing complexity," International Journal of Production Economics, Elsevier, vol. 140(2), pages 681-690.
- Sterna, Małgorzata, 2021. "Late and early work scheduling: A survey," Omega, Elsevier, vol. 104(C).
- C. A. Holloway & R. T. Nelson, 1974. "Job Shop Scheduling with Due Dates and Variable Processing Times," Management Science, INFORMS, vol. 20(9), pages 1264-1275, May.
- Thürer, Matthias & Stevenson, Mark, 2021. "Improving superfluous load avoidance release (SLAR): A new load-based SLAR mechanism," International Journal of Production Economics, Elsevier, vol. 231(C).
- Oosterman, Bas & Land, Martin & Gaalman, Gerard, 2000. "The influence of shop characteristics on workload control," International Journal of Production Economics, Elsevier, vol. 68(1), pages 107-119, October.
- C. A. Holloway & R. T. Nelson, 1974. "Job Shop Scheduling with Due Dates and Overtime Capability," Management Science, INFORMS, vol. 21(1), pages 68-78, September.
- Sabuncuoglu, I. & Comlekci, A., 2002. "Operation-based flowtime estimation in a dynamic job shop," Omega, Elsevier, vol. 30(6), pages 423-442, December.
- Kellerer, Hans & Rustogi, Kabir & Strusevich, Vitaly A., 2020. "A fast FPTAS for single machine scheduling problem of minimizing total weighted earliness and tardiness about a large common due date," Omega, Elsevier, vol. 90(C).
- Chen, Wenchong & Gong, Xuejian & Rahman, Humyun Fuad & Liu, Hongwei & Qi, Ershi, 2021. "Real-time order acceptance and scheduling for data-enabled permutation flow shops: Bilevel interactive optimization with nonlinear integer programming," Omega, Elsevier, vol. 105(C).
- Tava Lennon Olsen & Brian Tomlin, 2020. "Industry 4.0: Opportunities and Challenges for Operations Management," Manufacturing & Service Operations Management, INFORMS, vol. 22(1), pages 113-122, January.
- Raghu, T. S. & Rajendran, Chandrasekharan, 1993. "An efficient dynamic dispatching rule for scheduling in a job shop," International Journal of Production Economics, Elsevier, vol. 32(3), pages 301-313, November.
- Xifan Yao & Jiajun Zhou & Yingzi Lin & Yun Li & Hongnian Yu & Ying Liu, 2019. "Smart manufacturing based on cyber-physical systems and beyond," Journal of Intelligent Manufacturing, Springer, vol. 30(8), pages 2805-2817, December.
- Matthias Thürer & Martin J. Land & Mark Stevenson & Lawrence D. Fredendall & Moacir Godinho Filho, 2015. "Concerning Workload Control and Order Release: The Pre-Shop Pool Sequencing Decision," Production and Operations Management, Production and Operations Management Society, vol. 24(7), pages 1179-1192, July.
- Branke, Juergen & Pickardt, Christoph W., 2011. "Evolutionary search for difficult problem instances to support the design of job shop dispatching rules," European Journal of Operational Research, Elsevier, vol. 212(1), pages 22-32, July.
- Land, Martin J. & Gaalman, Gerard J. C., 1998. "The performance of workload control concepts in job shops: Improving the release method," International Journal of Production Economics, Elsevier, vol. 56(1), pages 347-364, September.
- Holthaus, Oliver & Rajendran, Chandrasekharan, 1997. "Efficient dispatching rules for scheduling in a job shop," International Journal of Production Economics, Elsevier, vol. 48(1), pages 87-105, January.
- Kingsman, B. G. & Tatsiopoulos, I. P. & Hendry, L. C., 1989. "A structural methodology for managing manufacturing lead times in make-to-order companies," European Journal of Operational Research, Elsevier, vol. 40(2), pages 196-209, May.
- Harrod, Steven & Kanet, John J., 2013. "Applying work flow control in make-to-order job shops," International Journal of Production Economics, Elsevier, vol. 143(2), pages 620-626.
- Matthias Thürer & Mark Stevenson & Cristovao Silva & Martin J. Land & Lawrence D. Fredendall & Steven A. Melnyk, 2014. "Lean Control for Make-to-Order Companies: Integrating Customer Enquiry Management and Order Release," Production and Operations Management, Production and Operations Management Society, vol. 23(3), pages 463-476, March.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Kasper, T.A. Arno & Land, Martin J. & Teunter, Ruud H., 2023. "Non-hierarchical work-in-progress control in manufacturing," International Journal of Production Economics, Elsevier, vol. 257(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Kasper, T.A. Arno & Land, Martin J. & Teunter, Ruud H., 2023. "Non-hierarchical work-in-progress control in manufacturing," International Journal of Production Economics, Elsevier, vol. 257(C).
- Davide Mezzogori & Giovanni Romagnoli & Francesco Zammori, 2021. "Defining accurate delivery dates in make to order job-shops managed by workload control," Flexible Services and Manufacturing Journal, Springer, vol. 33(4), pages 956-991, December.
- Matthias Thürer & Mark Stevenson, 2021. "Material handling and order release control in high-variety make-to-order shops: an assessment by simulation," Operations Management Research, Springer, vol. 14(3), pages 494-506, December.
- Stefan Haeussler & Philipp Neuner & Matthias Thürer, 2023. "Balancing earliness and tardiness within workload control order release: an assessment by simulation," Flexible Services and Manufacturing Journal, Springer, vol. 35(2), pages 487-508, June.
- Thürer, Matthias & Stevenson, Mark & Land, Martin J., 2016. "On the integration of input and output control: Workload Control order release," International Journal of Production Economics, Elsevier, vol. 174(C), pages 43-53.
- Matthias Thürer & Nuno O. Fernandes & Mark Stevenson, 2020. "Material Flow Control in High‐Variety Make‐to‐Order Shops: Combining COBACABANA and POLCA," Production and Operations Management, Production and Operations Management Society, vol. 29(9), pages 2138-2152, September.
- Thürer, Matthias & Stevenson, Mark & Silva, Cristovao & Qu, Ting, 2017. "Drum-buffer-rope and workload control in High-variety flow and job shops with bottlenecks: An assessment by simulation," International Journal of Production Economics, Elsevier, vol. 188(C), pages 116-127.
- Fernandes, Nuno O. & Thürer, Matthias & Silva, Cristóvão & Carmo-Silva, Sílvio, 2017. "Improving workload control order release: Incorporating a starvation avoidance trigger into continuous release," International Journal of Production Economics, Elsevier, vol. 194(C), pages 181-189.
- Kaustav Kundu & Martin J. Land & Alberto Portioli-Staudacher & Jos A. C. Bokhorst, 2021. "Order review and release in make-to-order flow shops: analysis and design of new methods," Flexible Services and Manufacturing Journal, Springer, vol. 33(3), pages 750-782, September.
- Ferreira, Cristiane & Figueira, Gonçalo & Amorim, Pedro, 2022. "Effective and interpretable dispatching rules for dynamic job shops via guided empirical learning," Omega, Elsevier, vol. 111(C).
- Land, Martin J. & Stevenson, Mark & Thürer, Matthias & Gaalman, Gerard J.C., 2015. "Job shop control: In search of the key to delivery improvements," International Journal of Production Economics, Elsevier, vol. 168(C), pages 257-266.
- Matthias Thürer & Mark Stevenson, 2016. "Workload control in job shops with re-entrant flows: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 54(17), pages 5136-5150, September.
- Sagawa, Juliana Keiko & Oliveira, Allan Freitas & Mušič, Gašper & Land, Martin J. & Maluf, Arthur Sarro, 2023. "Smart workload input-output control of production systems: A proof of concept," European Journal of Operational Research, Elsevier, vol. 309(1), pages 286-305.
- Jianjun Liu & Martin J. Land & Jos A. C. Bokhorst & Qingxin Chen, 2023. "Improving coordination in assembly job shops: redesigning order release and dispatching," Flexible Services and Manufacturing Journal, Springer, vol. 35(3), pages 669-697, September.
- Onay, Anita & Stampfer, Christina & Missbauer, Hubert, 2023. "A behavioral perspective on workload control concepts: The influence of order release on operators’ reaction behavior," International Journal of Production Economics, Elsevier, vol. 264(C).
- Thürer, Matthias & Stevenson, Mark, 2021. "Improving superfluous load avoidance release (SLAR): A new load-based SLAR mechanism," International Journal of Production Economics, Elsevier, vol. 231(C).
- Stevenson, Mark & Huang, Yuan & Hendry, Linda C. & Soepenberg, Erik, 2011. "The theory and practice of workload control: A research agenda and implementation strategy," International Journal of Production Economics, Elsevier, vol. 131(2), pages 689-700, June.
- Thürer, Matthias & Stevenson, Mark & Qu, Ting & Godinho Filho, Moacir, 2014. "The design of simple subcontracting rules for make-to-order shops: An assessment by simulation," European Journal of Operational Research, Elsevier, vol. 239(3), pages 854-864.
- Thürer, Matthias & Stevenson, Mark, 2018. "Bottleneck-oriented order release with shifting bottlenecks: An assessment by simulation," International Journal of Production Economics, Elsevier, vol. 197(C), pages 275-282.
- Land, Martin, 2006. "Parameters and sensitivity in workload control," International Journal of Production Economics, Elsevier, vol. 104(2), pages 625-638, December.
More about this item
Keywords
High-variety manufacturing; Make-To-Order; Dispatching; Industry 4.0; Simulation; System State;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jomega:v:114:y:2023:i:c:s0305048322001335. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/375/description#description .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.