Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis

Author

Listed:
  • Zorzini, M.
  • Corti, D.
  • Pozzetti, A.

Abstract

The current competitive context puts manufacturers under increasing pressure to provide products and services that meet the particular requirements of individual customers, calling for high flexibility in business processes. The complexity and the uncertainty of demand are particularly high in customized contexts, such as the make-to-order (MTO) and engineer-to-order (ETO) sectors, where the ability to deal with more and more differentiated requirements in terms of product features, delivery lead time and cost is crucial. In order to be competitive in such a context, due date (DD) quotation and capacity evaluation at the customer enquiry stage are of strategic importance, having a large impact on the company performance. Despite the large impact on company performance, the importance of DD setting and order acceptance processes and related decisions is often underestimated in practice and the issue is underexposed in the literature. As the applicability of most of the proposed models is limited and there are too few empirical studies describing the practices adopted for capacity and delivery lead-time management in industrial contexts, this study is aimed at developing an understanding of these practices based on a sample of 15 Italian capital goods manufacturers. An interpretative framework is proposed in order to identify the main contextual factors impacting company choices. A model that formalizes the decision process for setting DDs in the analyzed cases is then proposed, suggesting different procedures depending on the type of enquiry submission (DD set by companies or customers) and customer order (fast or slow).

Suggested Citation

  • Zorzini, M. & Corti, D. & Pozzetti, A., 2008. "Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis," International Journal of Production Economics, Elsevier, vol. 112(2), pages 919-933, April.
  • Handle: RePEc:eee:proeco:v:112:y:2008:i:2:p:919-933
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(07)00281-2
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. ten Kate, Hans A., 1994. "Towards a better understanding of order acceptance," International Journal of Production Economics, Elsevier, vol. 37(1), pages 139-152, November.
    2. Sridharan, Sri V., 1998. "Managing capacity in tightly constrained systems," International Journal of Production Economics, Elsevier, vol. 56(1), pages 601-610, September.
    3. Kingsman, Brian & Hendry, Linda & Mercer, Alan & de Souza, Antonio, 1996. "Responding to customer enquiries in make-to-order companies Problems and solutions," International Journal of Production Economics, Elsevier, vol. 46(1), pages 219-231, December.
    4. (Van) Enns, S. T., 1995. "An economic approach to job shop performance analysis," International Journal of Production Economics, Elsevier, vol. 38(2-3), pages 117-131, March.
    5. Easton, Fred F. & Moodie, Douglas R., 1999. "Pricing and lead time decisions for make-to-order firms with contingent orders," European Journal of Operational Research, Elsevier, vol. 116(2), pages 305-318, July.
    6. Kolisch, R., 2000. "Integration of assembly and fabrication for make-to-order production," International Journal of Production Economics, Elsevier, vol. 68(3), pages 287-306, December.
    7. Corti, Donatella & Pozzetti, Alessandro & Zorzini, Marta, 2006. "A capacity-driven approach to establish reliable due dates in a MTO environment," International Journal of Production Economics, Elsevier, vol. 104(2), pages 536-554, December.
    8. Kingsman, Brian G., 2000. "Modelling input-output workload control for dynamic capacity planning in production planning systems," International Journal of Production Economics, Elsevier, vol. 68(1), pages 73-93, October.
    9. Lawrence, Stephen R., 1994. "Negotiating due-dates between customers and producers," International Journal of Production Economics, Elsevier, vol. 37(1), pages 127-138, November.
    10. Barut, M. & Sridharan, V, 2004. "Design and evaluation of a dynamic capacity apportionment procedure," European Journal of Operational Research, Elsevier, vol. 155(1), pages 112-133, May.
    11. Song, D. P. & Hicks, C. & Earl, C. F., 2002. "Product due date assignment for complex assemblies," International Journal of Production Economics, Elsevier, vol. 76(3), pages 243-256, April.
    12. Bertrand, J. W. M. & Muntslag, D. R., 1993. "Production control in engineer-to-order firms," International Journal of Production Economics, Elsevier, vol. 30(1), pages 3-22, July.
    13. Kolisch, Rainer, 2000. "Integration of assembly and fabrication for make-to-order production," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 335, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    14. Konijnendijk, Paul A., 1994. "Coordinating marketing and manufacturing in ETO companies," International Journal of Production Economics, Elsevier, vol. 37(1), pages 19-26, November.
    15. Kingsman, Brian & Worden, Lee & Hendry, Linda & Mercer, Alan & Wilson, Elaine, 1993. "Integrating marketing and production planning in make-to-order companies," International Journal of Production Economics, Elsevier, vol. 30(1), pages 53-66, July.
    16. Cheng, T. C. E. & Gupta, M. C., 1989. "Survey of scheduling research involving due date determination decisions," European Journal of Operational Research, Elsevier, vol. 38(2), pages 156-166, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Cemal AKTÜRK & Sevinç GÜLSEÇEN, 2018. "Sipariş Teslim Tarihi Problemi İçin Çok Kriterli ve Çok Yöntemli Karar Destek Sistemi Önerisi," Istanbul Management Journal, Istanbul University Business School, vol. 29(84), pages 65-78, June.
    2. Alarcón, F. & Alemany, M.M.E. & Ortiz, A., 2009. "Conceptual framework for the characterization of the order promising process in a collaborative selling network context," International Journal of Production Economics, Elsevier, vol. 120(1), pages 100-114, July.
    3. Carvalho, Andréa Nunes & Oliveira, Fabricio & Scavarda, Luiz Felipe, 2016. "Tactical capacity planning in a real-world ETO industry case: A robust optimization approach," International Journal of Production Economics, Elsevier, vol. 180(C), pages 158-171.
    4. Ivo Blöchliger & Nicolas Zufferey, 2013. "Multi-coloring and job-scheduling with assignment and incompatibility costs," Annals of Operations Research, Springer, vol. 211(1), pages 83-101, December.
    5. Carvalho, Andréa Nunes & Oliveira, Fabricio & Scavarda, Luiz Felipe, 2015. "Tactical capacity planning in a real-world ETO industry case: An action research," International Journal of Production Economics, Elsevier, vol. 167(C), pages 187-203.
    6. Brachmann, Robert & Kolisch, Rainer, 2021. "The impact of flexibility on engineer-to-order production planning," International Journal of Production Economics, Elsevier, vol. 239(C).
    7. Slotnick, Susan A., 2011. "Optimal and heuristic lead-time quotation for an integrated steel mill with a minimum batch size," European Journal of Operational Research, Elsevier, vol. 210(3), pages 527-536, May.
    8. Og[breve]uz, Ceyda & Sibel Salman, F. & Bilgintürk YalçIn, Zehra, 2010. "Order acceptance and scheduling decisions in make-to-order systems," International Journal of Production Economics, Elsevier, vol. 125(1), pages 200-211, May.
    9. Chuang Wang & Pingyu Jiang, 2019. "Deep neural networks based order completion time prediction by using real-time job shop RFID data," Journal of Intelligent Manufacturing, Springer, vol. 30(3), pages 1303-1318, March.
    10. Kaustav Kundu & Martin J. Land & Alberto Portioli-Staudacher & Jos A. C. Bokhorst, 2021. "Order review and release in make-to-order flow shops: analysis and design of new methods," Flexible Services and Manufacturing Journal, Springer, vol. 33(3), pages 750-782, September.
    11. Simon Thevenin & Nicolas Zufferey & Marino Widmer, 2016. "Order acceptance and scheduling with earliness and tardiness penalties," Journal of Heuristics, Springer, vol. 22(6), pages 849-890, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Zorzini, Marta & Stevenson, Mark & Hendry, Linda C., 2012. "Customer Enquiry Management in global supply chains: A comparative multi-case study analysis," European Management Journal, Elsevier, vol. 30(2), pages 121-140.
    2. Corti, Donatella & Pozzetti, Alessandro & Zorzini, Marta, 2006. "A capacity-driven approach to establish reliable due dates in a MTO environment," International Journal of Production Economics, Elsevier, vol. 104(2), pages 536-554, December.
    3. Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
    4. Stevenson, Mark & Hendry, Linda C., 2006. "Aggregate load-oriented workload control: A review and a re-classification of a key approach," International Journal of Production Economics, Elsevier, vol. 104(2), pages 676-693, December.
    5. Stevenson, Mark & Huang, Yuan & Hendry, Linda C. & Soepenberg, Erik, 2011. "The theory and practice of workload control: A research agenda and implementation strategy," International Journal of Production Economics, Elsevier, vol. 131(2), pages 689-700, June.
    6. Sung, Chang Sup & Juhn, Jaeho, 2009. "Makespan minimization for a 2-stage assembly scheduling problem subject to component available time constraint," International Journal of Production Economics, Elsevier, vol. 119(2), pages 392-401, June.
    7. Surbhi Upadhyay & Suresh Kumar Garg & Rishu Sharma, 2023. "Analyzing the Factors for Implementing Make-to-Order Manufacturing System," Sustainability, MDPI, vol. 15(13), pages 1-22, June.
    8. Mile Katic & Renu Agarwal, 2018. "The Flexibility Paradox: Achieving Ambidexterity in High-Variety, Low-Volume Manufacturing," Global Journal of Flexible Systems Management, Springer;Global Institute of Flexible Systems Management, vol. 19(1), pages 69-86, March.
    9. McGovern, T. & Hicks, C., 2004. "Deregulation and restructuring of the global electricity supply industry and its impact upon power plant suppliers," International Journal of Production Economics, Elsevier, vol. 89(3), pages 321-337, June.
    10. Murat Erkoc & S. David Wu & Haresh Gurnani, 2008. "Delivery‐date and capacity management in a decentralized internal market," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(5), pages 390-405, August.
    11. Carvalho, Andréa Nunes & Oliveira, Fabricio & Scavarda, Luiz Felipe, 2015. "Tactical capacity planning in a real-world ETO industry case: An action research," International Journal of Production Economics, Elsevier, vol. 167(C), pages 187-203.
    12. Cakravastia, Andi & Toha, Isa S. & Nakamura, Nobuto, 2002. "A two-stage model for the design of supply chain networks," International Journal of Production Economics, Elsevier, vol. 80(3), pages 231-248, December.
    13. van Ooijen, H. P. G. & Bertrand, J. W. M., 2001. "Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 261-268, December.
    14. Liang Tang & Zhihong Jin & Xuwei Qin & Ke Jing, 2019. "Supply chain scheduling in a collaborative manufacturing mode: model construction and algorithm design," Annals of Operations Research, Springer, vol. 275(2), pages 685-714, April.
    15. Henrich, Peter & Land, Martin & Gaalman, Gerard, 2006. "Grouping machines for effective workload control," International Journal of Production Economics, Elsevier, vol. 104(1), pages 125-142, November.
    16. Zhi-Long Chen & Nicholas G. Hall, 2010. "The Coordination of Pricing and Scheduling Decisions," Manufacturing & Service Operations Management, INFORMS, vol. 12(1), pages 77-92, April.
    17. Tanja Mlinar & Philippe Chevalier, 2016. "Pooling heterogeneous products for manufacturing environments," 4OR, Springer, vol. 14(2), pages 173-200, June.
    18. Pamela C. Nolz, 2021. "Optimizing construction schedules and material deliveries in city logistics: a case study from the building industry," Flexible Services and Manufacturing Journal, Springer, vol. 33(3), pages 846-878, September.
    19. Azaron, Amir & Katagiri, Hideki & Kato, Kosuke & Sakawa, Masatoshi, 2006. "Modelling complex assemblies as a queueing network for lead time control," European Journal of Operational Research, Elsevier, vol. 174(1), pages 150-168, October.
    20. Li, Haitao & Womer, Keith, 2012. "Optimizing the supply chain configuration for make-to-order manufacturing," European Journal of Operational Research, Elsevier, vol. 221(1), pages 118-128.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:112:y:2008:i:2:p:919-933. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.