IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v112y2008i2p934-954.html
   My bibliography  Save this article

Parametric and neural methods for cost estimation of process vessels

Author

Listed:
  • Caputo, Antonio C.
  • Pelagagge, Pacifico M.

Abstract

In this paper, a comparison is made between artificial neural networks and parametric functions for estimating the manufacturing cost of large-sized and complex-shaped pressure vessels in engineer-to-order manufacturing systems. In the case of large equipment built to customer's design, in fact, it is hard to estimate the production cost owing to the wide variability of vessel's size and configuration and the often scarce previous experience with similar units. However, when cost estimates are to be used for bidding purposes, a poor accuracy may have detrimental financial consequences. A cost overestimation bears the risk of making the firm uncompetitive and losing a customer, while underestimating the cost leads to winning a contract but incurring a financial loss. Furthermore, a precise knowledge of prospective resources utilization is critical for project management purposes when passing to the actual manufacture phase. The developed methods were tested with reference to a world leading manufacturer in 68 case studies with very encouraging results. In fact both techniques greatly outperformed the manual estimation methods currently adopted which suffered from an average estimation error of 26%, with maximum values of +81% and -60%. The parametric function method, instead, enabled a reduction of the average estimation error to about 12%, with extreme values within the ±33% range, while the neural network approach allowed to further reduce the average error to less than 9% with a +33% to -22% variability range. In this application, therefore, the neural network proved to be better suited than the parametric model, presumably owing to the better mapping capabilities. Such results are quite satisfactory considering the kind of production context, the scarcity of historical data and the severity of the considered application. In this paper, the procedure used to develop the two estimating methods is described and the obtained performances are evaluated in comparison with the manual method, also discussing the merits and limitations of the analysed approaches.

Suggested Citation

  • Caputo, Antonio C. & Pelagagge, Pacifico M., 2008. "Parametric and neural methods for cost estimation of process vessels," International Journal of Production Economics, Elsevier, vol. 112(2), pages 934-954, April.
  • Handle: RePEc:eee:proeco:v:112:y:2008:i:2:p:934-954
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(07)00282-4
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Kingsman, Brian & Hendry, Linda & Mercer, Alan & de Souza, Antonio, 1996. "Responding to customer enquiries in make-to-order companies Problems and solutions," International Journal of Production Economics, Elsevier, vol. 46(1), pages 219-231, December.
    2. Ong, N. S., 1995. "Manufacturing cost estimation for PCB assembly: An activity-based approach," International Journal of Production Economics, Elsevier, vol. 38(2-3), pages 159-172, March.
    3. Hill, Tim & Marquez, Leorey & O'Connor, Marcus & Remus, William, 1994. "Artificial neural network models for forecasting and decision making," International Journal of Forecasting, Elsevier, vol. 10(1), pages 5-15, June.
    4. Wierda, Leo S., 1988. "Product cost-estimation by the designer," Engineering Costs and Production Economics, Elsevier, vol. 13(3), pages 189-198, March.
    5. Shtub, Avraham & Zimerman, Yoav, 1993. "A neural-network-based approach for estimating the cost of assembly systems," International Journal of Production Economics, Elsevier, vol. 32(2), pages 189-207, September.
    6. Elgh, Fredrik & Cederfeldt, Mikael, 2007. "Concurrent cost estimation as a tool for enhanced producibility--System development and applicability for producibility studies," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 12-26, September.
    7. Fatemeh Zahedi, 1991. "An Introduction to Neural Networks and a Comparison with Artificial Intelligence and Expert Systems," Interfaces, INFORMS, vol. 21(2), pages 25-38, April.
    8. Cavalieri, Sergio & Maccarrone, Paolo & Pinto, Roberto, 2004. "Parametric vs. neural network models for the estimation of production costs: A case study in the automotive industry," International Journal of Production Economics, Elsevier, vol. 91(2), pages 165-177, September.
    9. Shtub, Avraham & Versano, Ronen, 1999. "Estimating the cost of steel pipe bending, a comparison between neural networks and regression analysis," International Journal of Production Economics, Elsevier, vol. 62(3), pages 201-207, September.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Chou, Jui-Sheng & Tai, Yian & Chang, Lian-Ji, 2010. "Predicting the development cost of TFT-LCD manufacturing equipment with artificial intelligence models," International Journal of Production Economics, Elsevier, vol. 128(1), pages 339-350, November.
    2. Johnson, Michael D. & Kirchain, Randolph E., 2009. "Quantifying the effects of product family decisions on material selection: A process-based costing approach," International Journal of Production Economics, Elsevier, vol. 120(2), pages 653-668, August.
    3. C.G. Sreenivasa & S.R. Devadasan & N.M. Sivaram & S. Karthi, 2012. "Resource optimisation through artificial neural network for handling supply chain constraints," International Journal of Logistics Economics and Globalisation, Inderscience Enterprises Ltd, vol. 4(1/2), pages 5-19.
    4. Becker, Till & Illigen, Christoph & McKelvey, Bill & Hülsmann, Michael & Windt, Katja, 2016. "Using an agent-based neural-network computational model to improve product routing in a logistics facility," International Journal of Production Economics, Elsevier, vol. 174(C), pages 156-167.
    5. Jui-Sheng Chou & Dinh-Nhat Truong & Chih-Fong Tsai, 2021. "Solving Regression Problems with Intelligent Machine Learner for Engineering Informatics," Mathematics, MDPI, vol. 9(6), pages 1-25, March.
    6. Moein Shamoushaki & Pouriya H. Niknam & Lorenzo Talluri & Giampaolo Manfrida & Daniele Fiaschi, 2021. "Development of Cost Correlations for the Economic Assessment of Power Plant Equipment," Energies, MDPI, vol. 14(9), pages 1-19, May.
    7. Bodendorf, Frank & Xie, Qiao & Merkl, Philipp & Franke, Jörg, 2022. "A multi-perspective approach to support collaborative cost management in supplier-buyer dyads," International Journal of Production Economics, Elsevier, vol. 245(C).
    8. Moein Shamoushaki & Giampaolo Manfrida & Lorenzo Talluri & Pouriya H. Niknam & Daniele Fiaschi, 2021. "Different Geothermal Power Cycle Configurations Cost Estimation Models," Sustainability, MDPI, vol. 13(20), pages 1-19, October.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Qian, Li & Ben-Arieh, David, 2008. "Parametric cost estimation based on activity-based costing: A case study for design and development of rotational parts," International Journal of Production Economics, Elsevier, vol. 113(2), pages 805-818, June.
    2. Wang, Qing, 2007. "Artificial neural networks as cost engineering methods in a collaborative manufacturing environment," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 53-64, September.
    3. Ciurana, J. & Quintana, G. & Garcia-Romeu, M.L., 2008. "Estimating the cost of vertical high-speed machining centres, a comparison between multiple regression analysis and the neural networks approach," International Journal of Production Economics, Elsevier, vol. 115(1), pages 171-178, September.
    4. Verlinden, B. & Duflou, J.R. & Collin, P. & Cattrysse, D., 2008. "Cost estimation for sheet metal parts using multiple regression and artificial neural networks: A case study," International Journal of Production Economics, Elsevier, vol. 111(2), pages 484-492, February.
    5. H'mida, Fehmi & Martin, Patrick & Vernadat, Francois, 2006. "Cost estimation in mechanical production: The Cost Entity approach applied to integrated product engineering," International Journal of Production Economics, Elsevier, vol. 103(1), pages 17-35, September.
    6. Quintana, Guillem & Ciurana, Joaquim, 2011. "Cost estimation support tool for vertical high speed machines based on product characteristics and productivity requirements," International Journal of Production Economics, Elsevier, vol. 134(1), pages 188-195, November.
    7. Schikora, Paul F. & Godfrey, Michael R., 2003. "Efficacy of end-user neural network and data mining software for predicting complex system performance," International Journal of Production Economics, Elsevier, vol. 84(3), pages 231-253, June.
    8. Prybutok, Victor R. & Yi, Junsub & Mitchell, David, 2000. "Comparison of neural network models with ARIMA and regression models for prediction of Houston's daily maximum ozone concentrations," European Journal of Operational Research, Elsevier, vol. 122(1), pages 31-40, April.
    9. Palocsay, Susan W. & Stevens, Scott P. & Brookshire, Robert G. & Sacco, William J. & Copes, Wayne S. & Buckman, Robert F. & Smith, J. Stanley, 1996. "Using neural networks for trauma outcome evaluation," European Journal of Operational Research, Elsevier, vol. 93(2), pages 369-386, September.
    10. Cakravastia, Andi & Toha, Isa S. & Nakamura, Nobuto, 2002. "A two-stage model for the design of supply chain networks," International Journal of Production Economics, Elsevier, vol. 80(3), pages 231-248, December.
    11. Fabio Magnacca & Riccardo Giannetti, 2024. "Management accounting and new product development: a systematic literature review and future research directions," Journal of Management & Governance, Springer;Accademia Italiana di Economia Aziendale (AIDEA), vol. 28(2), pages 651-685, June.
    12. C, Deep Prakash & Majumdar, Adrija, 2023. "Predicting sports fans’ engagement with culturally aligned social media content: A language expectancy perspective," Journal of Retailing and Consumer Services, Elsevier, vol. 75(C).
    13. Leung, Philip C.M. & Lee, Eric W.M., 2013. "Estimation of electrical power consumption in subway station design by intelligent approach," Applied Energy, Elsevier, vol. 101(C), pages 634-643.
    14. Deng, S. & Yeh, Tsung-Han, 2011. "Using least squares support vector machines for the airframe structures manufacturing cost estimation," International Journal of Production Economics, Elsevier, vol. 131(2), pages 701-708, June.
    15. Johnson, Michael D. & Kirchain, Randolph E., 2009. "Quantifying the effects of product family decisions on material selection: A process-based costing approach," International Journal of Production Economics, Elsevier, vol. 120(2), pages 653-668, August.
    16. Chatfield, Chris, 1995. "Positive or negative?," International Journal of Forecasting, Elsevier, vol. 11(4), pages 501-502, December.
    17. Oscar Claveria & Salvador Torra, 2013. "“Forecasting Business surveys indicators: neural networks vs. time series models”," AQR Working Papers 201312, University of Barcelona, Regional Quantitative Analysis Group, revised Nov 2013.
    18. Thomassey, Sebastien & Happiette, Michel & Castelain, Jean Marie, 2005. "A short and mean-term automatic forecasting system--application to textile logistics," European Journal of Operational Research, Elsevier, vol. 161(1), pages 275-284, February.
    19. Shtub, Avraham & Versano, Ronen, 1999. "Estimating the cost of steel pipe bending, a comparison between neural networks and regression analysis," International Journal of Production Economics, Elsevier, vol. 62(3), pages 201-207, September.
    20. Arshia Amiri & Ulf-G Gerdtham, 2012. "Granger Causality Between Exports, Imports and GDP in France: Evidance from Using Geostatistical Models," Economic Research Guardian, Mutascu Publishing, vol. 2(1), pages 43-59, May.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:112:y:2008:i:2:p:934-954. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.