Investigating implementation issues for workload control (WLC): A comparative case study analysis
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Missbauer, H., 1997. "Order release and sequence-dependent setup times," International Journal of Production Economics, Elsevier, vol. 49(2), pages 131-143, April.
- Hendry, L. C. & Kingsman, B. G., 1989. "Production planning systems and their applicability to make-to-order companies," European Journal of Operational Research, Elsevier, vol. 40(1), pages 1-15, May.
- Stevenson, Mark & Hendry, Linda C., 2006. "Aggregate load-oriented workload control: A review and a re-classification of a key approach," International Journal of Production Economics, Elsevier, vol. 104(2), pages 676-693, December.
- Zapfel, Gunther & Missbauer, Hubert, 1993. "New concepts for production planning and control," European Journal of Operational Research, Elsevier, vol. 67(3), pages 297-320, June.
- Kingsman, Brian & Hendry, Linda & Mercer, Alan & de Souza, Antonio, 1996. "Responding to customer enquiries in make-to-order companies Problems and solutions," International Journal of Production Economics, Elsevier, vol. 46(1), pages 219-231, December.
- Land, Martin & Gaalman, Gerard, 1996. "Workload control concepts in job shops A critical assessment," International Journal of Production Economics, Elsevier, vol. 46(1), pages 535-548, December.
- Gorman, Michael F. & Brannon, James I., 2000. "Seasonality and the production-smoothing model," International Journal of Production Economics, Elsevier, vol. 65(2), pages 173-178, April.
- Hendry, L. C. & Elings, P. & Pegg, D., 1993. "Production planning for an artists studio -- A case study," European Journal of Operational Research, Elsevier, vol. 64(1), pages 12-20, January.
- Mandal, Purnendu & Gunasekaran, A., 2003. "Issues in implementing ERP: A case study," European Journal of Operational Research, Elsevier, vol. 146(2), pages 274-283, April.
- Kingsman, Brian & Worden, Lee & Hendry, Linda & Mercer, Alan & Wilson, Elaine, 1993. "Integrating marketing and production planning in make-to-order companies," International Journal of Production Economics, Elsevier, vol. 30(1), pages 53-66, July.
- Perona, Marco & Portioli, Alberto, 1998. "The impact of parameters setting in load oriented manufacturing control," International Journal of Production Economics, Elsevier, vol. 55(2), pages 133-142, July.
- Sabuncuoglu, I. & Karapinar, H. Y., 1999. "Analysis of order review/release problems in production systems," International Journal of Production Economics, Elsevier, vol. 62(3), pages 259-279, September.
- Oosterman, Bas & Land, Martin & Gaalman, Gerard, 2000. "The influence of shop characteristics on workload control," International Journal of Production Economics, Elsevier, vol. 68(1), pages 107-119, October.
- Motwani, Jaideep & Mirchandani, Dinesh & Madan, Manu & Gunasekaran, A., 2002. "Successful implementation of ERP projects: Evidence from two case studies," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 83-96, January.
- Henrich, Peter & Land, Martin & Gaalman, Gerard, 2006. "Grouping machines for effective workload control," International Journal of Production Economics, Elsevier, vol. 104(1), pages 125-142, November.
- Gelders, Ludo F. & Van Wassenhove, Luk N., 1981. "Production planning: a review," European Journal of Operational Research, Elsevier, vol. 7(2), pages 101-110, June.
- Yusuf, Yahaya & Gunasekaran, A. & Abthorpe, Mark S., 2004. "Enterprise information systems project implementation:: A case study of ERP in Rolls-Royce," International Journal of Production Economics, Elsevier, vol. 87(3), pages 251-266, February.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Missbauer, Hubert, 2009. "Models of the transient behaviour of production units to optimize the aggregate material flow," International Journal of Production Economics, Elsevier, vol. 118(2), pages 387-397, April.
- Thürer, Matthias & Land, Martin J. & Stevenson, Mark, 2014. "Card-based workload control for job shops: Improving COBACABANA," International Journal of Production Economics, Elsevier, vol. 147(PA), pages 180-188.
- Thürer, Matthias & Land, Martin J. & Stevenson, Mark & Fredendall, Lawrence D., 2016. "Card-based delivery date promising in high-variety manufacturing with order release control," International Journal of Production Economics, Elsevier, vol. 172(C), pages 19-30.
- Onay, Anita & Stampfer, Christina & Missbauer, Hubert, 2023. "A behavioral perspective on workload control concepts: The influence of order release on operators’ reaction behavior," International Journal of Production Economics, Elsevier, vol. 264(C).
- Federica Costa & Kaustav Kundu & Matteo Rossini & Alberto Portioli-Staudacher, 2023. "Comparative study of bottleneck-based release models and load-based ones in a hybrid MTO-MTS flow shop: an assessment by simulation," Operations Management Research, Springer, vol. 16(1), pages 33-48, March.
- Jianjun Liu & Martin J. Land & Jos A. C. Bokhorst & Qingxin Chen, 2023. "Improving coordination in assembly job shops: redesigning order release and dispatching," Flexible Services and Manufacturing Journal, Springer, vol. 35(3), pages 669-697, September.
- Stevenson, Mark & Huang, Yuan & Hendry, Linda C. & Soepenberg, Erik, 2011. "The theory and practice of workload control: A research agenda and implementation strategy," International Journal of Production Economics, Elsevier, vol. 131(2), pages 689-700, June.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Stevenson, Mark & Hendry, Linda C., 2006. "Aggregate load-oriented workload control: A review and a re-classification of a key approach," International Journal of Production Economics, Elsevier, vol. 104(2), pages 676-693, December.
- Stevenson, Mark & Huang, Yuan & Hendry, Linda C. & Soepenberg, Erik, 2011. "The theory and practice of workload control: A research agenda and implementation strategy," International Journal of Production Economics, Elsevier, vol. 131(2), pages 689-700, June.
- Henrich, Peter & Land, Martin & Gaalman, Gerard, 2006. "Grouping machines for effective workload control," International Journal of Production Economics, Elsevier, vol. 104(1), pages 125-142, November.
- Land, Martin J., 2009. "Cobacabana (control of balance by card-based navigation): A card-based system for job shop control," International Journal of Production Economics, Elsevier, vol. 117(1), pages 97-103, January.
- Matthias Thürer & Mark Stevenson, 2016. "Workload control in job shops with re-entrant flows: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 54(17), pages 5136-5150, September.
- Kingsman, Brian G., 2000. "Modelling input-output workload control for dynamic capacity planning in production planning systems," International Journal of Production Economics, Elsevier, vol. 68(1), pages 73-93, October.
- Land, Martin, 2006. "Parameters and sensitivity in workload control," International Journal of Production Economics, Elsevier, vol. 104(2), pages 625-638, December.
- Sagawa, Juliana Keiko & Oliveira, Allan Freitas & Mušič, Gašper & Land, Martin J. & Maluf, Arthur Sarro, 2023. "Smart workload input-output control of production systems: A proof of concept," European Journal of Operational Research, Elsevier, vol. 309(1), pages 286-305.
- Fernandes, Nuno O. & Thürer, Matthias & Silva, Cristóvão & Carmo-Silva, Sílvio, 2017. "Improving workload control order release: Incorporating a starvation avoidance trigger into continuous release," International Journal of Production Economics, Elsevier, vol. 194(C), pages 181-189.
- Thürer, Matthias & Stevenson, Mark & Land, Martin J., 2016. "On the integration of input and output control: Workload Control order release," International Journal of Production Economics, Elsevier, vol. 174(C), pages 43-53.
- Missbauer, Hubert, 2009. "Models of the transient behaviour of production units to optimize the aggregate material flow," International Journal of Production Economics, Elsevier, vol. 118(2), pages 387-397, April.
- Kaustav Kundu & Martin J. Land & Alberto Portioli-Staudacher & Jos A. C. Bokhorst, 2021. "Order review and release in make-to-order flow shops: analysis and design of new methods," Flexible Services and Manufacturing Journal, Springer, vol. 33(3), pages 750-782, September.
- Pürgstaller, Peter & Missbauer, Hubert, 2012. "Rule-based vs. optimisation-based order release in workload control: A simulation study of a MTO manufacturer," International Journal of Production Economics, Elsevier, vol. 140(2), pages 670-680.
- Corti, Donatella & Pozzetti, Alessandro & Zorzini, Marta, 2006. "A capacity-driven approach to establish reliable due dates in a MTO environment," International Journal of Production Economics, Elsevier, vol. 104(2), pages 536-554, December.
- repec:dgr:rugsom:02a72 is not listed on IDEAS
- Federica Costa & Alberto Portioli-Staudacher, 2021. "Labor flexibility integration in workload control in Industry 4.0 era," Operations Management Research, Springer, vol. 14(3), pages 420-433, December.
- Matthias Thürer & Mark Stevenson & Ting Qu, 2016. "Job sequencing and selection within workload control order release: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 54(4), pages 1061-1075, February.
- Thürer, Matthias & Stevenson, Mark & Qu, Ting & Godinho Filho, Moacir, 2014. "The design of simple subcontracting rules for make-to-order shops: An assessment by simulation," European Journal of Operational Research, Elsevier, vol. 239(3), pages 854-864.
- Mojtaba Ashja & Akram Hadizadeh Moghadam & Hamid Bidram, 2015. "Comparative study of large information systems’ CSFs during their life cycle," Information Systems Frontiers, Springer, vol. 17(3), pages 619-628, June.
- Stefan Haeussler & Philipp Neuner & Matthias Thürer, 2023. "Balancing earliness and tardiness within workload control order release: an assessment by simulation," Flexible Services and Manufacturing Journal, Springer, vol. 35(2), pages 487-508, June.
- Henrich, Peter & Land, Martin & Gaalman, Gerard, 2004. "Exploring applicability of the workload control concept," International Journal of Production Economics, Elsevier, vol. 90(2), pages 187-198, July.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:112:y:2008:i:1:p:452-469. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.