Levelling crane workload in multi-yard rail-road container terminals
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ejor.2020.12.063
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Boysen, Nils & Emde, Simon & Fliedner, Malte, 2012. "Determining crane areas for balancing workload among interfering and noninterfering cranes," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 79437, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
- Kress, Dominik & Meiswinkel, Sebastian & Pesch, Erwin, 2015. "The Partitioning Min–Max Weighted Matching Problem," European Journal of Operational Research, Elsevier, vol. 247(3), pages 745-754.
- Andrew Lim & Brian Rodrigues & Zhou Xu, 2007. "A m‐parallel crane scheduling problem with a non‐crossing constraint," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(2), pages 115-127, March.
- Peng Guo & Wenming Cheng & Yi Wang & Nils Boysen, 2018. "Gantry crane scheduling in intermodal rail-road container terminals," International Journal of Production Research, Taylor & Francis Journals, vol. 56(16), pages 5419-5436, August.
- Konrad Stephan & Nils Boysen, 2017. "Crane scheduling in railway yards: an analysis of computational complexity," Journal of Scheduling, Springer, vol. 20(5), pages 507-526, October.
- Nils Boysen & Simon Emde & Malte Fliedner, 2012. "Determining crane areas for balancing workload among interfering and noninterfering cranes," Naval Research Logistics (NRL), John Wiley & Sons, vol. 59(8), pages 656-662, December.
- Boysen, Nils & Fliedner, Malte & Kellner, Michael, 2010. "Determining fixed crane areas in rail-rail transshipment yards," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 46(6), pages 1005-1016, November.
- Bontekoning, Y. M. & Macharis, C. & Trip, J. J., 2004. "Is a new applied transportation research field emerging?--A review of intermodal rail-truck freight transport literature," Transportation Research Part A: Policy and Practice, Elsevier, vol. 38(1), pages 1-34, January.
- Boysen, Nils & Fliedner, Malte, 2010. "Determining crane areas in intermodal transshipment yards: The yard partition problem," European Journal of Operational Research, Elsevier, vol. 204(2), pages 336-342, July.
- Ng, W. C., 2005. "Crane scheduling in container yards with inter-crane interference," European Journal of Operational Research, Elsevier, vol. 164(1), pages 64-78, July.
- Nils Boysen & Florian Jaehn & Erwin Pesch, 2011. "Scheduling Freight Trains in Rail-Rail Transshipment Yards," Transportation Science, INFORMS, vol. 45(2), pages 199-211, May.
- Mateusz Cichenski & Florian Jaehn & Grzegorz Pawlak & Erwin Pesch & Gaurav Singh & Jacek Blazewicz, 2017. "An integrated model for the transshipment yard scheduling problem," Journal of Scheduling, Springer, vol. 20(1), pages 57-65, February.
- Nils Boysen & Malte Fliedner & Florian Jaehn & Erwin Pesch, 2013. "A Survey on Container Processing in Railway Yards," Transportation Science, INFORMS, vol. 47(3), pages 312-329, August.
- Nils Boysen & Joachim Scholl & Konrad Stephan, 2017. "When road trains supply freight trains: scheduling the container loading process by gantry crane between multi-trailer trucks and freight trains," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 137-164, January.
- Jian Gang Jin & Der-Horng Lee & Jin Xin Cao, 2016. "Storage Yard Management in Maritime Container Terminals," Transportation Science, INFORMS, vol. 50(4), pages 1300-1313, November.
- Boysen, Nils & Briskorn, Dirk & Meisel, Frank, 2017. "A generalized classification scheme for crane scheduling with interference," European Journal of Operational Research, Elsevier, vol. 258(1), pages 343-357.
- Y Zhu & A Lim, 2006. "Crane scheduling with non-crossing constraint," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(12), pages 1464-1471, December.
- Alena Otto & Xiyu Li & Erwin Pesch, 2017. "Two-Way Bounded Dynamic Programming Approach for Operations Planning in Transshipment Yards," Transportation Science, INFORMS, vol. 51(1), pages 325-342, February.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Zhongbin Zhao & Xifu Wang & Suxin Cheng & Wei Liu & Lijun Jiang, 2022. "A New Synchronous Handling Technology of Double Stack Container Trains in Sea-Rail Intermodal Terminals," Sustainability, MDPI, vol. 14(18), pages 1-18, September.
- Basallo-Triana, Mario José & Bravo-Bastidas, Juan José & Vidal-Holguín, Carlos Julio, 2022. "A rail-road transshipment yard picture," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 159(C).
- Roy, Debjit & van Ommeren, Jan-Kees & de Koster, René & Gharehgozli, Amir, 2022. "Modeling landside container terminal queues: Exact analysis and approximations," Transportation Research Part B: Methodological, Elsevier, vol. 162(C), pages 73-102.
- Hosseini, Amir & Otto, Alena & Pesch, Erwin, 2024. "Scheduling in manufacturing with transportation: Classification and solution techniques," European Journal of Operational Research, Elsevier, vol. 315(3), pages 821-843.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Basallo-Triana, Mario José & Bravo-Bastidas, Juan José & Vidal-Holguín, Carlos Julio, 2022. "A rail-road transshipment yard picture," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 159(C).
- Gang Ren & Xiaohan Wang & Jiaxin Cai & Shujuan Guo, 2021. "Allocation and Scheduling of Handling Resources in the Railway Container Terminal Based on Crossing Crane Area," Sustainability, MDPI, vol. 13(3), pages 1-24, January.
- Gharehgozli, Amir & Yu, Yugang & de Koster, René & Du, Shaofu, 2019. "Sequencing storage and retrieval requests in a container block with multiple open locations," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 125(C), pages 261-284.
- Konrad Stephan & Nils Boysen, 2017. "Crane scheduling in railway yards: an analysis of computational complexity," Journal of Scheduling, Springer, vol. 20(5), pages 507-526, October.
- Boysen, Nils & Briskorn, Dirk & Meisel, Frank, 2017. "A generalized classification scheme for crane scheduling with interference," European Journal of Operational Research, Elsevier, vol. 258(1), pages 343-357.
- Nils Boysen & Malte Fliedner & Florian Jaehn & Erwin Pesch, 2013. "A Survey on Container Processing in Railway Yards," Transportation Science, INFORMS, vol. 47(3), pages 312-329, August.
- Damla Kizilay & Deniz Türsel Eliiyi, 2021. "A comprehensive review of quay crane scheduling, yard operations and integrations thereof in container terminals," Flexible Services and Manufacturing Journal, Springer, vol. 33(1), pages 1-42, March.
- Stefan Fedtke & Nils Boysen, 2017. "Gantry crane and shuttle car scheduling in modern rail–rail transshipment yards," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(2), pages 473-503, March.
- Alena Otto & Xiyu Li & Erwin Pesch, 2017. "Two-Way Bounded Dynamic Programming Approach for Operations Planning in Transshipment Yards," Transportation Science, INFORMS, vol. 51(1), pages 325-342, February.
- Kuzmicz, Katarzyna Anna & Pesch, Erwin, 2019. "Approaches to empty container repositioning problems in the context of Eurasian intermodal transportation," Omega, Elsevier, vol. 85(C), pages 194-213.
- Dirk Briskorn & Florian Jaehn & Andreas Wiehl, 2019. "A generator for test instances of scheduling problems concerning cranes in transshipment terminals," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(1), pages 45-69, March.
- Kaidabettu, Chiraag Dinesh & Lange, Ann-Kathrin & Jahn, Carlos, 2021. "Gantry crane scheduling and storage techniques in rail-road terminals," Chapters from the Proceedings of the Hamburg International Conference of Logistics (HICL), in: Jahn, Carlos & Kersten, Wolfgang & Ringle, Christian M. (ed.), Adapting to the Future: Maritime and City Logistics in the Context of Digitalization and Sustainability. Proceedings of the Hamburg International Conf, volume 32, pages 457-492, Hamburg University of Technology (TUHH), Institute of Business Logistics and General Management.
- Boysen, Nils & Fliedner, Malte & Jaehn, Florian & Pesch, Erwin, 2012. "Shunting yard operations: Theoretical aspects and applications," European Journal of Operational Research, Elsevier, vol. 220(1), pages 1-14.
- Lennart Zey & Dirk Briskorn & Nils Boysen, 2022. "Twin-crane scheduling during seaside workload peaks with a dedicated handshake area," Journal of Scheduling, Springer, vol. 25(1), pages 3-34, February.
- Martin Tschöke & Nils Boysen, 2018. "Container supply with multi-trailer trucks: parking strategies to speed up the gantry crane-based loading of freight trains in rail yards," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 40(2), pages 319-339, March.
- Amir Gharehgozli & Debjit Roy & Suruchika Saini & Jan-Kees Ommeren, 2023. "Loading and unloading trains at the landside of container terminals," Maritime Economics & Logistics, Palgrave Macmillan;International Association of Maritime Economists (IAME), vol. 25(3), pages 549-575, September.
- Ambrosino, Daniela & Siri, Silvia, 2015. "Comparison of solution approaches for the train load planning problem in seaport terminals," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 79(C), pages 65-82.
- Simon Emde, 2017. "Optimally scheduling interfering and non‐interfering cranes," Naval Research Logistics (NRL), John Wiley & Sons, vol. 64(6), pages 476-489, September.
- Qin, Tianbao & Du, Yuquan & Chen, Jiang Hang & Sha, Mei, 2020. "Combining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vessel," European Journal of Operational Research, Elsevier, vol. 285(3), pages 884-901.
- Maksim Barketau & Erwin Pesch & Yakov Shafransky, 2016. "Scheduling dedicated jobs with variative processing times," Journal of Combinatorial Optimization, Springer, vol. 31(2), pages 774-785, February.
More about this item
Keywords
Rail-road container terminal; Scheduling; Complexity analysis; Simulated annealing;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:293:y:2021:i:3:p:941-954. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.