IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v220y2012i1p1-14.html
   My bibliography  Save this article

Shunting yard operations: Theoretical aspects and applications

Author

Listed:
  • Boysen, Nils
  • Fliedner, Malte
  • Jaehn, Florian
  • Pesch, Erwin

Abstract

Almost ever since freight has been transported via rail, shunting yards (also called classification or marshaling yards) are operated in order to separate freight trains and reassemble new trains. The efficient use of shunting yards has a deep impact on the efficiency and reliability of rail freight services. Thus, much research on shunting yards has been published, starting from the 1950s. Lately, several publications mostly focusing on the sorting procedures have livened up research on shunting yards. This paper reviews the literature on the operational processes at shunting yards over the last 40years and discusses the operational challenges of freight transshipment. The approaches are classified according to different sorting strategies which allows an easy access to the models for both, researchers and practitioners. The paper concludes with an overview on future research challenges.

Suggested Citation

  • Boysen, Nils & Fliedner, Malte & Jaehn, Florian & Pesch, Erwin, 2012. "Shunting yard operations: Theoretical aspects and applications," European Journal of Operational Research, Elsevier, vol. 220(1), pages 1-14.
  • Handle: RePEc:eee:ejores:v:220:y:2012:i:1:p:1-14
    DOI: 10.1016/j.ejor.2012.01.043
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221712000811
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2012.01.043?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Ulrich Blasum & Michael R. Bussieck & Winfried Hochstättler & Christoph Moll & Hans-Helmut Scheel & Thomas Winter, 1999. "Scheduling trams in the morning," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 49(1), pages 137-148, March.
    2. José Ángel González & Eva Ponce & Carlos Mataix & Javier Carrasco, 2008. "The Automatic Generation of Transhipment Plans for a Train--Train Terminal: Application to the Spanish--French Border," Transportation Planning and Technology, Taylor & Francis Journals, vol. 31(5), pages 545-567, May.
    3. Richard Freling & Ramon M. Lentink & Leo G. Kroon & Dennis Huisman, 2005. "Shunting of Passenger Train Units in a Railway Station," Transportation Science, INFORMS, vol. 39(2), pages 261-272, May.
    4. Fischer, T. & Gehring, H., 2005. "Planning vehicle transhipment in a seaport automobile terminal using a multi-agent system," European Journal of Operational Research, Elsevier, vol. 166(3), pages 726-740, November.
    5. Mark A. Turnquist & Mark S. Daskin, 1982. "Queuing Models of Classification and Connection Delay in Railyards," Transportation Science, INFORMS, vol. 16(2), pages 207-230, May.
    6. Kraft, Edwin R., 2002. "Priority-Based Classification for Improving Connection Reliability in Railroad Yards - Part II: Dynamic Block to Track Assignment," Journal of the Transportation Research Forum, Transportation Research Forum, vol. 41(1).
    7. Boysen, Nils & Fliedner, Malte & Kellner, Michael, 2010. "Determining fixed crane areas in rail-rail transshipment yards," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 46(6), pages 1005-1016, November.
    8. Dejan Jovanović & Patrick T. Harker, 1991. "Tactical Scheduling of Rail Operations: The SCAN I System," Transportation Science, INFORMS, vol. 25(1), pages 46-64, February.
    9. Leo G. Kroon & Ramon M. Lentink & Alexander Schrijver, 2008. "Shunting of Passenger Train Units: An Integrated Approach," Transportation Science, INFORMS, vol. 42(4), pages 436-449, November.
    10. Bierwirth, Christian & Meisel, Frank, 2010. "A survey of berth allocation and quay crane scheduling problems in container terminals," European Journal of Operational Research, Elsevier, vol. 202(3), pages 615-627, May.
    11. Teodor Gabriel Crainic & Michael Florian & José-Eugenio Léal, 1990. "A Model for the Strategic Planning of National Freight Transportation by Rail," Transportation Science, INFORMS, vol. 24(1), pages 1-24, February.
    12. Nils Boysen & Florian Jaehn & Erwin Pesch, 2011. "Scheduling Freight Trains in Rail-Rail Transshipment Yards," Transportation Science, INFORMS, vol. 45(2), pages 199-211, May.
    13. Carl D. Martland, 1982. "PMAKE Analysis: Predicting Rail Yard Time Distributions Using Probabilistic Train Connection Standards," Transportation Science, INFORMS, vol. 16(4), pages 476-506, November.
    14. Teodor Crainic & Jacques-A. Ferland & Jean-Marc Rousseau, 1984. "A Tactical Planning Model for Rail Freight Transportation," Transportation Science, INFORMS, vol. 18(2), pages 165-184, May.
    15. Kraft, Edwin R., 2002. "Priority-Based Classification for Improving Connection Reliability in Railroad Yards - Part I: Integration With Car Scheduling," Journal of the Transportation Research Forum, Transportation Research Forum, vol. 41(1).
    16. Harry N. Newton & Cynthia Barnhart & Pamela H. Vance, 1998. "Constructing Railroad Blocking Plans to Minimize Handling Costs," Transportation Science, INFORMS, vol. 32(4), pages 330-345, November.
    17. E. R. Petersen, 1977. "Railyard Modeling: Part II. The Effect of Yard Facilities on Congestion," Transportation Science, INFORMS, vol. 11(1), pages 50-59, February.
    18. Ravindra K. Ahuja & Krishna C. Jha & Jian Liu, 2007. "Solving Real-Life Railroad Blocking Problems," Interfaces, INFORMS, vol. 37(5), pages 404-419, October.
    19. Kim, Kap Hwan & Park, Young-Man, 2004. "A crane scheduling method for port container terminals," European Journal of Operational Research, Elsevier, vol. 156(3), pages 752-768, August.
    20. Freling, R. & Lentink, R.M. & Kroon, L.G. & Huisman, D., 2002. "Shunting of Passenger Train Units in a Railway Station," ERIM Report Series Research in Management ERS-2002-74-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    21. Mattfeld, D. C. & Kopfer, H., 2003. "Terminal operations management in vehicle transshipment," Transportation Research Part A: Policy and Practice, Elsevier, vol. 37(5), pages 435-452, June.
    22. Erhan Kozan, 2006. "Optimum Capacity for Intermodal Container Terminals," Transportation Planning and Technology, Taylor & Francis Journals, vol. 29(6), pages 471-482, September.
    23. Kim, Kap Hwan & Park, Young Man & Ryu, Kwang-Ryul, 2000. "Deriving decision rules to locate export containers in container yards," European Journal of Operational Research, Elsevier, vol. 124(1), pages 89-101, July.
    24. E. R. Petersen, 1977. "Railyard Modeling: Part I. Prediction of Put-Through Time," Transportation Science, INFORMS, vol. 11(1), pages 37-49, February.
    25. Abacoumkin, Constantinos & Ballis, Athanasios, 2004. "Development of an expert system for the evaluation of conventional and innovative technologies in the intermodal transport area," European Journal of Operational Research, Elsevier, vol. 152(2), pages 410-419, January.
    26. Bontekoning, Y. M. & Macharis, C. & Trip, J. J., 2004. "Is a new applied transportation research field emerging?--A review of intermodal rail-truck freight transport literature," Transportation Research Part A: Policy and Practice, Elsevier, vol. 38(1), pages 1-34, January.
    27. Boysen, Nils & Fliedner, Malte, 2010. "Determining crane areas in intermodal transshipment yards: The yard partition problem," European Journal of Operational Research, Elsevier, vol. 204(2), pages 336-342, July.
    28. Thomas Winter & Uwe Zimmermann, 2000. "Real-time dispatch of trams in storage yards," Annals of Operations Research, Springer, vol. 96(1), pages 287-315, November.
    29. Macharis, C. & Bontekoning, Y. M., 2004. "Opportunities for OR in intermodal freight transport research: A review," European Journal of Operational Research, Elsevier, vol. 153(2), pages 400-416, March.
    30. Vis, Iris F.A., 2006. "Survey of research in the design and control of automated guided vehicle systems," European Journal of Operational Research, Elsevier, vol. 170(3), pages 677-709, May.
    31. He, Shiwei & Song, Rui & Chaudhry, Sohail S., 2000. "Fuzzy dispatching model and genetic algorithms for railyards operations," European Journal of Operational Research, Elsevier, vol. 124(2), pages 307-331, July.
    32. Yvonne Bontekoning & Hugo Priemus, 2004. "Breakthrough innovations in intermodal freight transport," Transportation Planning and Technology, Taylor & Francis Journals, vol. 27(5), pages 335-345, October.
    33. Jean-François Cordeau & Paolo Toth & Daniele Vigo, 1998. "A Survey of Optimization Models for Train Routing and Scheduling," Transportation Science, INFORMS, vol. 32(4), pages 380-404, November.
    34. Daganzo, Carlos F., 1987. "Dynamic blocking for railyards: Part II. Heterogeneous traffic," Transportation Research Part B: Methodological, Elsevier, vol. 21(1), pages 29-40, February.
    35. Vis, Iris F. A. & de Koster, Rene, 2003. "Transshipment of containers at a container terminal: An overview," European Journal of Operational Research, Elsevier, vol. 147(1), pages 1-16, May.
    36. Harald Rotter, 2004. "New operating concepts for intermodal transport: The mega hub in Hanover/Lehrte in Germany," Transportation Planning and Technology, Taylor & Francis Journals, vol. 27(5), pages 347-365, October.
    37. Daganzo, Carlos F., 1987. "Dynamic blocking for railyards: Part I. Homogeneous traffic," Transportation Research Part B: Methodological, Elsevier, vol. 21(1), pages 1-27, February.
    38. Carlos F. Daganzo, 1986. "Static Blocking at Railyards: Sorting Implications and Track Requirements," Transportation Science, INFORMS, vol. 20(3), pages 189-199, August.
    39. Kraft, Edwin R., 2000. "A Hump Sequencing Algorithm for Real Time Management of Train Connection Reliability," Journal of the Transportation Research Forum, Transportation Research Forum, vol. 39(4).
    40. Bodin, Lawrence D. & Golden, Bruce L. & Schuster, Allan D. & Romig, William, 1980. "A model for the blocking of trains," Transportation Research Part B: Methodological, Elsevier, vol. 14(1-2), pages 115-120.
    41. Assad, Arjang A., 1980. "Modelling of rail networks: Toward a routing/makeup model," Transportation Research Part B: Methodological, Elsevier, vol. 14(1-2), pages 101-114.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Kuzmicz, Katarzyna Anna & Pesch, Erwin, 2019. "Approaches to empty container repositioning problems in the context of Eurasian intermodal transportation," Omega, Elsevier, vol. 85(C), pages 194-213.
    2. Schwerdfeger, Stefan & Otto, Alena & Boysen, Nils, 2021. "Rail platooning: Scheduling trains along a rail corridor with rapid-shunting facilities," European Journal of Operational Research, Elsevier, vol. 294(2), pages 760-778.
    3. Nils Boysen & Simon Emde & Malte Fliedner, 2016. "The basic train makeup problem in shunting yards," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(1), pages 207-233, January.
    4. Markus Bohlin & Sara Gestrelius & Florian Dahms & Matúš Mihalák & Holger Flier, 2016. "Optimization Methods for Multistage Freight Train Formation," Transportation Science, INFORMS, vol. 50(3), pages 823-840, August.
    5. Mateusz Cichenski & Florian Jaehn & Grzegorz Pawlak & Erwin Pesch & Gaurav Singh & Jacek Blazewicz, 2017. "An integrated model for the transshipment yard scheduling problem," Journal of Scheduling, Springer, vol. 20(1), pages 57-65, February.
    6. Boysen, Nils & Emde, Simon, 2016. "The parallel stack loading problem to minimize blockages," European Journal of Operational Research, Elsevier, vol. 249(2), pages 618-627.
    7. Alena Otto & Erwin Pesch, 2019. "The train-to-yard assignment problem," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(2), pages 549-580, June.
    8. Roy, Debjit & van Ommeren, Jan-Kees & de Koster, René & Gharehgozli, Amir, 2022. "Modeling landside container terminal queues: Exact analysis and approximations," Transportation Research Part B: Methodological, Elsevier, vol. 162(C), pages 73-102.
    9. Boysen, Nils & Briskorn, Dirk & Fedtke, Stefan & Schmickerath, Marcel, 2019. "Automated sortation conveyors: A survey from an operational research perspective," European Journal of Operational Research, Elsevier, vol. 276(3), pages 796-815.
    10. Scheffler, Martin & Neufeld, Janis S. & Hölscher, Michael, 2020. "An MIP-based heuristic solution approach for the locomotive assignment problem focussing on (dis-)connecting processes," Transportation Research Part B: Methodological, Elsevier, vol. 139(C), pages 64-80.
    11. Jaehn, Florian & Rieder, Johannes & Wiehl, Andreas, 2015. "Single-stage shunting minimizing weighted departure times," Omega, Elsevier, vol. 52(C), pages 133-141.
    12. Florian Jaehn & Alena Otto & Kilian Seifried, 2018. "Shunting operations at flat yards: retrieving freight railcars from storage tracks," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 40(2), pages 367-393, March.
    13. Florin RUSCA & Mihaela POPA & Eugen ROSCA & Aura RUSCA & Mircea ROSCA & Oana DINU, 2019. "Assessing The Transit Capacity Of Port Shunting Yards Through Discrete Simulation," Transport Problems, Silesian University of Technology, Faculty of Transport, vol. 14(4), pages 101-112, December.
    14. Ruf, Moritz & Cordeau, Jean-François, 2021. "Adaptive large neighborhood search for integrated planning in railroad classification yards," Transportation Research Part B: Methodological, Elsevier, vol. 150(C), pages 26-51.
    15. David Boywitz & Nils Boysen & Dirk Briskorn, 2016. "Resequencing with parallel queues to minimize the maximum number of items in the overflow area," Naval Research Logistics (NRL), John Wiley & Sons, vol. 63(5), pages 401-415, August.
    16. Haahr, Jørgen & Lusby, Richard M., 2017. "Integrating rolling stock scheduling with train unit shunting," European Journal of Operational Research, Elsevier, vol. 259(2), pages 452-468.
    17. Chen, Chongshuang & Dollevoet, Twan & Zhao, Jun, 2018. "One-block train formation in large-scale railway networks: An exact model and a tree-based decomposition algorithm," Transportation Research Part B: Methodological, Elsevier, vol. 118(C), pages 1-30.
    18. Alena Otto & Erwin Pesch, 2017. "Operation of shunting yards: train-to-yard assignment problem," Journal of Business Economics, Springer, vol. 87(4), pages 465-486, May.
    19. Stefan Fedtke & Nils Boysen, 2017. "Gantry crane and shuttle car scheduling in modern rail–rail transshipment yards," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(2), pages 473-503, March.
    20. Chen, C. & Dollevoet, T.A.B. & Zhao, J., 2017. "One-block train formation in large-scale railway networks: An exact model and a tree-based decomposition algorithm," Econometric Institute Research Papers EI-2017-32, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    21. Wang, Dian & Zhao, Jun & Peng, Qiyuan, 2022. "Optimizing the loaded train combination problem at a heavy-haul marshalling station," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 162(C).
    22. Shi, Tie & Zhou, Xuesong, 2015. "A mixed integer programming model for optimizing multi-level operations process in railroad yards," Transportation Research Part B: Methodological, Elsevier, vol. 80(C), pages 19-39.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Nils Boysen & Malte Fliedner & Florian Jaehn & Erwin Pesch, 2013. "A Survey on Container Processing in Railway Yards," Transportation Science, INFORMS, vol. 47(3), pages 312-329, August.
    2. Ruf, Moritz & Cordeau, Jean-François, 2021. "Adaptive large neighborhood search for integrated planning in railroad classification yards," Transportation Research Part B: Methodological, Elsevier, vol. 150(C), pages 26-51.
    3. Lin, Bo-Liang & Wang, Zhi-Mei & Ji, Li-Jun & Tian, Ya-Ming & Zhou, Guo-Qing, 2012. "Optimizing the freight train connection service network of a large-scale rail system," Transportation Research Part B: Methodological, Elsevier, vol. 46(5), pages 649-667.
    4. Nils Boysen & Florian Jaehn & Erwin Pesch, 2011. "Scheduling Freight Trains in Rail-Rail Transshipment Yards," Transportation Science, INFORMS, vol. 45(2), pages 199-211, May.
    5. Shi, Tie & Zhou, Xuesong, 2015. "A mixed integer programming model for optimizing multi-level operations process in railroad yards," Transportation Research Part B: Methodological, Elsevier, vol. 80(C), pages 19-39.
    6. Chen, C. & Dollevoet, T.A.B. & Zhao, J., 2017. "One-block train formation in large-scale railway networks: An exact model and a tree-based decomposition algorithm," Econometric Institute Research Papers EI-2017-32, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    7. He, Shiwei & Song, Rui & Chaudhry, Sohail S., 2000. "Fuzzy dispatching model and genetic algorithms for railyards operations," European Journal of Operational Research, Elsevier, vol. 124(2), pages 307-331, July.
    8. Stefan Fedtke & Nils Boysen, 2017. "Gantry crane and shuttle car scheduling in modern rail–rail transshipment yards," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(2), pages 473-503, March.
    9. Khaled, Abdullah A. & Jin, Mingzhou & Clarke, David B. & Hoque, Mohammad A., 2015. "Train design and routing optimization for evaluating criticality of freight railroad infrastructures," Transportation Research Part B: Methodological, Elsevier, vol. 71(C), pages 71-84.
    10. Chen, Chongshuang & Dollevoet, Twan & Zhao, Jun, 2018. "One-block train formation in large-scale railway networks: An exact model and a tree-based decomposition algorithm," Transportation Research Part B: Methodological, Elsevier, vol. 118(C), pages 1-30.
    11. Schwerdfeger, Stefan & Otto, Alena & Boysen, Nils, 2021. "Rail platooning: Scheduling trains along a rail corridor with rapid-shunting facilities," European Journal of Operational Research, Elsevier, vol. 294(2), pages 760-778.
    12. Zhimei Wang & Avishai Ceder, 2017. "Efficient design of freight train operation with double-hump yards," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(12), pages 1600-1619, December.
    13. Lehnfeld, Jana & Knust, Sigrid, 2014. "Loading, unloading and premarshalling of stacks in storage areas: Survey and classification," European Journal of Operational Research, Elsevier, vol. 239(2), pages 297-312.
    14. Kroon, L.G. & Lentink, R.M. & Schrijver, A., 2006. "Shunting of Passenger Train Units: an Integrated Approach," ERIM Report Series Research in Management ERS-2006-068-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    15. Jin, Jian Gang & Zhao, Jun & Lee, Der-Horng, 2013. "A column generation based approach for the Train Network Design Optimization problem," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 50(C), pages 1-17.
    16. Boysen, Nils & Briskorn, Dirk & Meisel, Frank, 2017. "A generalized classification scheme for crane scheduling with interference," European Journal of Operational Research, Elsevier, vol. 258(1), pages 343-357.
    17. Gharehgozli, A.H. & Roy, D. & de Koster, M.B.M., 2014. "Sea Container Terminals," ERIM Report Series Research in Management ERS-2014-009-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    18. Boysen, Nils & Emde, Simon, 2016. "The parallel stack loading problem to minimize blockages," European Journal of Operational Research, Elsevier, vol. 249(2), pages 618-627.
    19. Boysen, Nils & Fliedner, Malte, 2010. "Determining crane areas in intermodal transshipment yards: The yard partition problem," European Journal of Operational Research, Elsevier, vol. 204(2), pages 336-342, July.
    20. Endong Zhu & Teodor Gabriel Crainic & Michel Gendreau, 2014. "Scheduled Service Network Design for Freight Rail Transportation," Operations Research, INFORMS, vol. 62(2), pages 383-400, April.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:220:y:2012:i:1:p:1-14. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.