Shunting of Passenger Train Units in a Railway Station
Author
Abstract
Suggested Citation
DOI: 10.1287/trsc.1030.0076
Download full text from publisher
References listed on IDEAS
- Bunte, F.H.J. & Maks, J.A.H., 1997. "Contestability and sunk costs: an analysis of product R+D competition," Research Memorandum 015, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
- Giorgio Gallo & Federico Di Miele, 2001. "Dispatching Buses in Parking Depots," Transportation Science, INFORMS, vol. 35(3), pages 322-330, August.
- Kroon, Leo G. & Edwin Romeijn, H. & Zwaneveld, Peter J., 1997. "Routing trains through railway stations: complexity issues," European Journal of Operational Research, Elsevier, vol. 98(3), pages 485-498, May.
- Thomas Winter & Uwe Zimmermann, 2000. "Real-time dispatch of trams in storage yards," Annals of Operations Research, Springer, vol. 96(1), pages 287-315, November.
- He, Shiwei & Song, Rui & Chaudhry, Sohail S., 2000. "Fuzzy dispatching model and genetic algorithms for railyards operations," European Journal of Operational Research, Elsevier, vol. 124(2), pages 307-331, July.
- Jean-François Cordeau & Paolo Toth & Daniele Vigo, 1998. "A Survey of Optimization Models for Train Routing and Scheduling," Transportation Science, INFORMS, vol. 32(4), pages 380-404, November.
- Lingaya, Norbert & Cordeau, Jean-Françcois & Desaulniers, Guy & Desrosiers, Jacques & Soumis, Françcois, 2002. "Operational car assignment at VIA Rail Canada," Transportation Research Part B: Methodological, Elsevier, vol. 36(9), pages 755-778, November.
- Cynthia Barnhart & Ellis L. Johnson & George L. Nemhauser & Martin W. P. Savelsbergh & Pamela H. Vance, 1998. "Branch-and-Price: Column Generation for Solving Huge Integer Programs," Operations Research, INFORMS, vol. 46(3), pages 316-329, June.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Lehnfeld, Jana & Knust, Sigrid, 2014. "Loading, unloading and premarshalling of stacks in storage areas: Survey and classification," European Journal of Operational Research, Elsevier, vol. 239(2), pages 297-312.
- Nils Boysen & Florian Jaehn & Erwin Pesch, 2011. "Scheduling Freight Trains in Rail-Rail Transshipment Yards," Transportation Science, INFORMS, vol. 45(2), pages 199-211, May.
- Budai-Balke, G. & Maróti, G. & Dekker, R. & Huisman, D. & Kroon, L.G., 2007. "Re-scheduling in railways: the rolling stock balancing problem," Econometric Institute Research Papers EI 2007-21, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Hamdouni, Mohamed & Soumis, Francois & Desaulniers, Guy, 2007. "Parking buses in a depot with stochastic arrival times," European Journal of Operational Research, Elsevier, vol. 183(2), pages 502-515, December.
- Martin Josef Geiger & Sandra Huber & Sebastian Langton & Marius Leschik & Christian Lindorf & Ulrich Tüshaus, 2018. "Multi-attribute assignment of trains to departures in rolling stock management," Annals of Operations Research, Springer, vol. 271(2), pages 1131-1163, December.
- Mohamed Hamdouni & Guy Desaulniers & Odile Marcotte & François Soumis & Marianne van Putten, 2006. "Dispatching Buses in a Depot Using Block Patterns," Transportation Science, INFORMS, vol. 40(3), pages 364-377, August.
- Christian Artigues & Eric Bourreau & Vincent Jost & Safia Kedad-Sidhoum & François Ramond, 2018. "Trains do not vanish: the ROADEF/EURO challenge 2014," Annals of Operations Research, Springer, vol. 271(2), pages 1091-1105, December.
- Haahr, J.T. & Lusby, R.M. & Wagenaar, J.C., 2015. "A Comparison of Optimization Methods for Solving the Depot Matching and Parking Problem," ERIM Report Series Research in Management ERS-2015-013-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Boysen, Nils & Fliedner, Malte & Jaehn, Florian & Pesch, Erwin, 2012. "Shunting yard operations: Theoretical aspects and applications," European Journal of Operational Research, Elsevier, vol. 220(1), pages 1-14.
- David Boywitz & Nils Boysen & Dirk Briskorn, 2016. "Resequencing with parallel queues to minimize the maximum number of items in the overflow area," Naval Research Logistics (NRL), John Wiley & Sons, vol. 63(5), pages 401-415, August.
- Kroon, L.G. & Lentink, R.M. & Schrijver, A., 2006. "Shunting of Passenger Train Units: an Integrated Approach," ERIM Report Series Research in Management ERS-2006-068-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Haahr, Jørgen & Lusby, Richard M., 2017. "Integrating rolling stock scheduling with train unit shunting," European Journal of Operational Research, Elsevier, vol. 259(2), pages 452-468.
- Mirsad Buljubašić & Michel Vasquez & Haris Gavranović, 2018. "Two-phase heuristic for SNCF rolling stock problem," Annals of Operations Research, Springer, vol. 271(2), pages 1107-1129, December.
- Lin, Boliang & Shen, Yaoming & Wang, Zhongkai & Ni, Shaoquan & Zhao, Yinan, 2023. "An iterative improvement approach for high-speed train maintenance scheduling," Transportation Research Part B: Methodological, Elsevier, vol. 173(C), pages 292-312.
- Haahr, Jørgen Thorlund & Lusby, Richard M. & Wagenaar, Joris Camiel, 2017. "Optimization methods for the Train Unit Shunting Problem," European Journal of Operational Research, Elsevier, vol. 262(3), pages 981-995.
- Leo G. Kroon & Ramon M. Lentink & Alexander Schrijver, 2008. "Shunting of Passenger Train Units: An Integrated Approach," Transportation Science, INFORMS, vol. 42(4), pages 436-449, November.
- Boysen, Nils & Emde, Simon, 2016. "The parallel stack loading problem to minimize blockages," European Journal of Operational Research, Elsevier, vol. 249(2), pages 618-627.
- Jiaxi Wang & Manfred Gronalt & Yan Sun, 2017. "A two-stage approach to the depot shunting driver assignment problem with workload balance considerations," PLOS ONE, Public Library of Science, vol. 12(7), pages 1-23, July.
- Nils Boysen & Malte Fliedner & Florian Jaehn & Erwin Pesch, 2013. "A Survey on Container Processing in Railway Yards," Transportation Science, INFORMS, vol. 47(3), pages 312-329, August.
- Li Lei & Raymond S K Kwan & Zhiyuan Lin & Pedro J Copado-Mendez, 2022. "Resolution of coupling order and station level constraints in train unit scheduling," Public Transport, Springer, vol. 14(1), pages 27-61, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Lentink, R.M. & Fioole, P-J. & Kroon, L.G. & van 't Woudt, C., 2003. "Applying Operations Research techniques to planning of train shunting," ERIM Report Series Research in Management ERS-2003-094-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Dennis Huisman & Leo G. Kroon & Ramon M. Lentink & Michiel J. C. M. Vromans, 2005.
"Operations Research in passenger railway transportation,"
Statistica Neerlandica, Netherlands Society for Statistics and Operations Research, vol. 59(4), pages 467-497, November.
- Huisman, D. & Kroon, L.G. & Lentink, R.M. & Vromans, M.J.C.M., 2005. "Operations Research in Passenger Railway Transportation," ERIM Report Series Research in Management ERS-2005-023-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Huisman, D. & Kroon, L.G. & Lentink, R.M. & Vromans, M.J.C.M., 2005. "Operations research in passenger railway transportation," Econometric Institute Research Papers EI 2005-16, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Leo G. Kroon & Ramon M. Lentink & Alexander Schrijver, 2008. "Shunting of Passenger Train Units: An Integrated Approach," Transportation Science, INFORMS, vol. 42(4), pages 436-449, November.
- Kroon, L.G. & Lentink, R.M. & Schrijver, A., 2006. "Shunting of Passenger Train Units: an Integrated Approach," ERIM Report Series Research in Management ERS-2006-068-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Freling, R. & Lentink, R.M. & Kroon, L.G. & Huisman, D., 2002. "Shunting of Passenger Train Units in a Railway Station," ERIM Report Series Research in Management ERS-2002-74-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Cacchiani, Valentina & Furini, Fabio & Kidd, Martin Philip, 2016. "Approaches to a real-world Train Timetabling Problem in a railway node," Omega, Elsevier, vol. 58(C), pages 97-110.
- Flamini, Marta & Pacciarelli, Dario, 2008. "Real time management of a metro rail terminus," European Journal of Operational Research, Elsevier, vol. 189(3), pages 746-761, September.
- Nils Boysen & Florian Jaehn & Erwin Pesch, 2011. "Scheduling Freight Trains in Rail-Rail Transshipment Yards," Transportation Science, INFORMS, vol. 45(2), pages 199-211, May.
- Boysen, Nils & Fliedner, Malte & Jaehn, Florian & Pesch, Erwin, 2012. "Shunting yard operations: Theoretical aspects and applications," European Journal of Operational Research, Elsevier, vol. 220(1), pages 1-14.
- Zhang, Yongxiang & Peng, Qiyuan & Yao, Yu & Zhang, Xin & Zhou, Xuesong, 2019. "Solving cyclic train timetabling problem through model reformulation: Extended time-space network construct and Alternating Direction Method of Multipliers methods," Transportation Research Part B: Methodological, Elsevier, vol. 128(C), pages 344-379.
- Andrea D'Ariano & Francesco Corman & Dario Pacciarelli & Marco Pranzo, 2008. "Reordering and Local Rerouting Strategies to Manage Train Traffic in Real Time," Transportation Science, INFORMS, vol. 42(4), pages 405-419, November.
- Ruf, Moritz & Cordeau, Jean-François, 2021. "Adaptive large neighborhood search for integrated planning in railroad classification yards," Transportation Research Part B: Methodological, Elsevier, vol. 150(C), pages 26-51.
- Jardar Andersen & Marielle Christiansen & Teodor Gabriel Crainic & Roar Grønhaug, 2011. "Branch and Price for Service Network Design with Asset Management Constraints," Transportation Science, INFORMS, vol. 45(1), pages 33-49, February.
- Richard Lusby & Jesper Larsen & David Ryan & Matthias Ehrgott, 2011. "Routing Trains Through Railway Junctions: A New Set-Packing Approach," Transportation Science, INFORMS, vol. 45(2), pages 228-245, May.
- Hassini, Elkafi & Verma, Manish, 2016. "Disruption risk management in railroad networks: An optimization-based methodology and a case studyAuthor-Name: Azad, Nader," Transportation Research Part B: Methodological, Elsevier, vol. 85(C), pages 70-88.
- Zwaneveld, Peter J. & Kroon, Leo G. & van Hoesel, Stan P. M., 2001. "Routing trains through a railway station based on a node packing model," European Journal of Operational Research, Elsevier, vol. 128(1), pages 14-33, January.
- Lin, Zhiyuan & Kwan, Raymond S.K., 2016. "A branch-and-price approach for solving the train unit scheduling problem," Transportation Research Part B: Methodological, Elsevier, vol. 94(C), pages 97-120.
- Xueqiao Yu & Maoxiang Lang & Wenhui Zhang & Shiqi Li & Mingyue Zhang & Xiao Yu, 2019. "An Empirical Study on the Comprehensive Optimization Method of a Train Diagram of the China High Speed Railway Express," Sustainability, MDPI, vol. 11(7), pages 1-30, April.
- Burdett, R.L. & Kozan, E., 2010. "A disjunctive graph model and framework for constructing new train schedules," European Journal of Operational Research, Elsevier, vol. 200(1), pages 85-98, January.
- Alberto Caprara & Enrico Malaguti & Paolo Toth, 2011. "A Freight Service Design Problem for a Railway Corridor," Transportation Science, INFORMS, vol. 45(2), pages 147-162, May.
More about this item
Keywords
passenger railway transport; shunting; planning support; column generation;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ortrsc:v:39:y:2005:i:2:p:261-272. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.