IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v126y2000i3p567-586.html
   My bibliography  Save this article

Analysis of reactive scheduling problems in a job shop environment

Author

Listed:
  • Sabuncuoglu, I.
  • Bayiz, M.

Abstract

No abstract is available for this item.

Suggested Citation

  • Sabuncuoglu, I. & Bayiz, M., 2000. "Analysis of reactive scheduling problems in a job shop environment," European Journal of Operational Research, Elsevier, vol. 126(3), pages 567-586, November.
  • Handle: RePEc:eee:ejores:v:126:y:2000:i:3:p:567-586
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(99)00311-2
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. James C. Bean & John R. Birge & John Mittenthal & Charles E. Noon, 1991. "Matchup Scheduling with Multiple Resources, Release Dates and Disruptions," Operations Research, INFORMS, vol. 39(3), pages 470-483, June.
    2. Sabuncuoglu, I. & Bayiz, M., 1999. "Job shop scheduling with beam search," European Journal of Operational Research, Elsevier, vol. 118(2), pages 390-412, October.
    3. C. A. Holloway & R. T. Nelson, 1974. "Job Shop Scheduling with Due Dates and Variable Processing Times," Management Science, INFORMS, vol. 20(9), pages 1264-1275, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Keivan Rahimi-Adli & Egidio Leo & Benedikt Beisheim & Sebastian Engell, 2021. "Optimisation of the Operation of an Industrial Power Plant under Steam Demand Uncertainty," Energies, MDPI, vol. 14(21), pages 1-28, November.
    2. Belinda Spratt & Erhan Kozan, 2021. "An integrated rolling horizon approach to increase operating theatre efficiency," Journal of Scheduling, Springer, vol. 24(1), pages 3-25, February.
    3. Lang, N.A. & Moonen, J.M. & Srour, F.J. & Zuidwijk, R.A., 2008. "Multi Agent Systems in Logistics: A Literature and State-of-the-art Review," ERIM Report Series Research in Management ERS-2008-043-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    4. Cauvin, A.C.A. & Ferrarini, A.F.A. & Tranvouez, E.T.E., 2009. "Disruption management in distributed enterprises: A multi-agent modelling and simulation of cooperative recovery behaviours," International Journal of Production Economics, Elsevier, vol. 122(1), pages 429-439, November.
    5. Jiewu Leng & Pingyu Jiang, 2019. "Dynamic scheduling in RFID-driven discrete manufacturing system by using multi-layer network metrics as heuristic information," Journal of Intelligent Manufacturing, Springer, vol. 30(3), pages 979-994, March.
    6. Petroni, Alberto & Rizzi, Antonio, 2002. "A fuzzy logic based methodology to rank shop floor dispatching rules," International Journal of Production Economics, Elsevier, vol. 76(1), pages 99-108, March.
    7. Ferreira, Cristiane & Figueira, Gonçalo & Amorim, Pedro, 2022. "Effective and interpretable dispatching rules for dynamic job shops via guided empirical learning," Omega, Elsevier, vol. 111(C).
    8. Yi, Xiajie & Goossens, Dries & Nobibon, Fabrice Talla, 2020. "Proactive and reactive strategies for football league timetabling," European Journal of Operational Research, Elsevier, vol. 282(2), pages 772-785.
    9. Sabuncuoglu, Ihsan & Gocgun, Yasin & Erel, Erdal, 2008. "Backtracking and exchange of information: Methods to enhance a beam search algorithm for assembly line scheduling," European Journal of Operational Research, Elsevier, vol. 186(3), pages 915-930, May.
    10. Jain, S. & Foley, W.J., 2016. "Dispatching strategies for managing uncertainties in automated manufacturing systems," European Journal of Operational Research, Elsevier, vol. 248(1), pages 328-341.
    11. Carlo Meloni & Marco Pranzo, 2020. "Expected shortfall for the makespan in activity networks under imperfect information," Flexible Services and Manufacturing Journal, Springer, vol. 32(3), pages 668-692, September.
    12. Chuang Wang & Pingyu Jiang, 2018. "Manifold learning based rescheduling decision mechanism for recessive disturbances in RFID-driven job shops," Journal of Intelligent Manufacturing, Springer, vol. 29(7), pages 1485-1500, October.
    13. Bruccoleri, Manfredi & Pasek, Zbigniew J. & Koren, Yoram, 2006. "Operation management in reconfigurable manufacturing systems: Reconfiguration for error handling," International Journal of Production Economics, Elsevier, vol. 100(1), pages 87-100, March.
    14. Bing Wang & Xingbao Han & Xianxia Zhang & Shaohua Zhang, 2015. "Predictive-reactive scheduling for single surgical suite subject to random emergency surgery," Journal of Combinatorial Optimization, Springer, vol. 30(4), pages 949-966, November.
    15. Aytug, Haldun & Lawley, Mark A. & McKay, Kenneth & Mohan, Shantha & Uzsoy, Reha, 2005. "Executing production schedules in the face of uncertainties: A review and some future directions," European Journal of Operational Research, Elsevier, vol. 161(1), pages 86-110, February.
    16. Novak, Antonin & Sucha, Premysl & Novotny, Matej & Stec, Richard & Hanzalek, Zdenek, 2022. "Scheduling jobs with normally distributed processing times on parallel machines," European Journal of Operational Research, Elsevier, vol. 297(2), pages 422-441.
    17. Herroelen, Willy & Leus, Roel, 2005. "Project scheduling under uncertainty: Survey and research potentials," European Journal of Operational Research, Elsevier, vol. 165(2), pages 289-306, September.
    18. Adil Baykasoğlu & Fatma S. Karaslan, 2017. "Solving comprehensive dynamic job shop scheduling problem by using a GRASP-based approach," International Journal of Production Research, Taylor & Francis Journals, vol. 55(11), pages 3308-3325, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Rego, César & Duarte, Renato, 2009. "A filter-and-fan approach to the job shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 194(3), pages 650-662, May.
    2. Herroelen, Willy & Leus, Roel, 2004. "The construction of stable project baseline schedules," European Journal of Operational Research, Elsevier, vol. 156(3), pages 550-565, August.
    3. Erenay, Fatih Safa & Sabuncuoglu, Ihsan & Toptal, Aysegül & Tiwari, Manoj Kumar, 2010. "New solution methods for single machine bicriteria scheduling problem: Minimization of average flowtime and number of tardy jobs," European Journal of Operational Research, Elsevier, vol. 201(1), pages 89-98, February.
    4. Liu, Ying & Dong, Haibo & Lohse, Niels & Petrovic, Sanja, 2016. "A multi-objective genetic algorithm for optimisation of energy consumption and shop floor production performance," International Journal of Production Economics, Elsevier, vol. 179(C), pages 259-272.
    5. F. Guerriero, 2008. "Hybrid Rollout Approaches for the Job Shop Scheduling Problem," Journal of Optimization Theory and Applications, Springer, vol. 139(2), pages 419-438, November.
    6. Gonzalo Mejía & Carlos Montoya, 2008. "A Petri Net based algorithm for minimizing total tardiness in flexible manufacturing systems," Annals of Operations Research, Springer, vol. 164(1), pages 63-78, November.
    7. Wenchang Luo & Rylan Chin & Alexander Cai & Guohui Lin & Bing Su & An Zhang, 2022. "A tardiness-augmented approximation scheme for rejection-allowed multiprocessor rescheduling," Journal of Combinatorial Optimization, Springer, vol. 44(1), pages 690-722, August.
    8. Ting, Ching-Jung & Wu, Kun-Chih, 2017. "Optimizing container relocation operations at container yards with beam search," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 103(C), pages 17-31.
    9. Jian Yang & Xiangtong Qi & Gang Yu, 2005. "Disruption management in production planning," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(5), pages 420-442, August.
    10. Suresh Chand & Vernon Ning Hsu & Suresh Sethi, 2002. "Forecast, Solution, and Rolling Horizons in Operations Management Problems: A Classified Bibliography," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 25-43, September.
    11. Yin, Yunqiang & Wang, Yan & Cheng, T.C.E. & Liu, Wenqi & Li, Jinhai, 2017. "Parallel-machine scheduling of deteriorating jobs with potential machine disruptions," Omega, Elsevier, vol. 69(C), pages 17-28.
    12. Novak, Antonin & Sucha, Premysl & Hanzalek, Zdenek, 2019. "Scheduling with uncertain processing times in mixed-criticality systems," European Journal of Operational Research, Elsevier, vol. 279(3), pages 687-703.
    13. Kasper, T.A. Arno & Land, Martin J. & Teunter, Ruud H., 2023. "Towards System State Dispatching in High‐Variety Manufacturing," Omega, Elsevier, vol. 114(C).
    14. Yin, Yunqiang & Cheng, T.C.E. & Wang, Du-Juan, 2016. "Rescheduling on identical parallel machines with machine disruptions to minimize total completion time," European Journal of Operational Research, Elsevier, vol. 252(3), pages 737-749.
    15. Liu, Zhixin & Lu, Liang & Qi, Xiangtong, 2018. "Cost allocation in rescheduling with machine unavailable period," European Journal of Operational Research, Elsevier, vol. 266(1), pages 16-28.
    16. Nicholas G. Hall & Chris N. Potts, 2004. "Rescheduling for New Orders," Operations Research, INFORMS, vol. 52(3), pages 440-453, June.
    17. Zhou, Xuesong & Zhong, Ming, 2005. "Bicriteria train scheduling for high-speed passenger railroad planning applications," European Journal of Operational Research, Elsevier, vol. 167(3), pages 752-771, December.
    18. Wang, Dujuan & Yin, Yunqiang & Cheng, T.C.E., 2018. "Parallel-machine rescheduling with job unavailability and rejection," Omega, Elsevier, vol. 81(C), pages 246-260.
    19. Stanisław Gawiejnowicz, 2020. "A review of four decades of time-dependent scheduling: main results, new topics, and open problems," Journal of Scheduling, Springer, vol. 23(1), pages 3-47, February.
    20. G. Cherif & E. Leclercq & D. Lefebvre, 2023. "Scheduling of a class of partial routing FMS in uncertain environments with beam search," Journal of Intelligent Manufacturing, Springer, vol. 34(2), pages 493-514, February.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:126:y:2000:i:3:p:567-586. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.