IDEAS home Printed from https://ideas.repec.org/r/inm/oropre/v44y1996i3p510-525.html
   My bibliography  Save this item

A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Levorato, Mario & Figueiredo, Rosa & Frota, Yuri, 2022. "Exact solutions for the two-machine robust flow shop with budgeted uncertainty," European Journal of Operational Research, Elsevier, vol. 300(1), pages 46-57.
  2. Hichem Kamoun & Nicholas G. Hall & Chelliah Sriskandarajah, 1999. "Scheduling in Robotic Cells: Heuristics and Cell Design," Operations Research, INFORMS, vol. 47(6), pages 821-835, December.
  3. Federico Della Croce & Andrea Grosso & Fabio Salassa, 2021. "Minimizing total completion time in the two-machine no-idle no-wait flow shop problem," Journal of Heuristics, Springer, vol. 27(1), pages 159-173, April.
  4. Kalczynski, Pawel Jan & Kamburowski, Jerzy, 2007. "On no-wait and no-idle flow shops with makespan criterion," European Journal of Operational Research, Elsevier, vol. 178(3), pages 677-685, May.
  5. A. Gómez‐Corral, 2004. "Sojourn times in a two‐stage queueing network with blocking," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(8), pages 1068-1089, December.
  6. Liu, Shi Qiang & Kozan, Erhan, 2009. "Scheduling a flow shop with combined buffer conditions," International Journal of Production Economics, Elsevier, vol. 117(2), pages 371-380, February.
  7. Smutnicki, Czeslaw & Pempera, Jaroslaw & Bocewicz, Grzegorz & Banaszak, Zbigniew, 2022. "Cyclic flow-shop scheduling with no-wait constraints and missing operations," European Journal of Operational Research, Elsevier, vol. 302(1), pages 39-49.
  8. Sawik, Tadeusz, 2004. "Loading and scheduling of a flexible assembly system by mixed integer programming," European Journal of Operational Research, Elsevier, vol. 154(1), pages 1-19, April.
  9. Abdennour Azerine & Mourad Boudhar & Djamal Rebaine, 2022. "A two-machine no-wait flow shop problem with two competing agents," Journal of Combinatorial Optimization, Springer, vol. 43(1), pages 168-199, January.
  10. Polten, Lukas & Emde, Simon, 2021. "Scheduling automated guided vehicles in very narrow aisle warehouses," Omega, Elsevier, vol. 99(C).
  11. Corman, Francesco & D'Ariano, Andrea & Pacciarelli, Dario & Pranzo, Marco, 2010. "A tabu search algorithm for rerouting trains during rail operations," Transportation Research Part B: Methodological, Elsevier, vol. 44(1), pages 175-192, January.
  12. Xuemei Qi & Hongtao Wang & Haihong Zhu & Ji Zhang & Fulong Chen & Jie Yang, 2016. "Fast local neighborhood search algorithm for the no-wait flow shop scheduling with total flow time minimization," International Journal of Production Research, Taylor & Francis Journals, vol. 54(16), pages 4957-4972, August.
  13. Ricardo Pérez-Rodríguez, 2024. "A Radial Memetic Algorithm to Resolve the No-Wait Job-Shop Scheduling Problem," Mathematics, MDPI, vol. 12(21), pages 1-15, October.
  14. Xiangtong Qi & Jonathan F. Bard & Gang Yu, 2004. "Class Scheduling for Pilot Training," Operations Research, INFORMS, vol. 52(1), pages 148-162, February.
  15. S. S. Panwalkar & Christos Koulamas, 2019. "The evolution of schematic representations of flow shop scheduling problems," Journal of Scheduling, Springer, vol. 22(4), pages 379-391, August.
  16. Chien, Chen-Fu & Tseng, Fang-Pin & Chen, Chien-Hung, 2008. "An evolutionary approach to rehabilitation patient scheduling: A case study," European Journal of Operational Research, Elsevier, vol. 189(3), pages 1234-1253, September.
  17. Jeffrey B. Sidney & Chelliah Sriskandarajah, 1999. "A heuristic for the two‐machine no‐wait openshop scheduling problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(2), pages 129-145, March.
  18. Nikhil Bansal & Mohammad Mahdian & Maxim Sviridenko, 2005. "Minimizing Makespan in No-Wait Job Shops," Mathematics of Operations Research, INFORMS, vol. 30(4), pages 817-831, November.
  19. Vacharapoom Benjaoran & Nashwan Dawood & Brian Hobbs, 2005. "Flowshop scheduling model for bespoke precast concrete production planning," Construction Management and Economics, Taylor & Francis Journals, vol. 23(1), pages 93-105.
  20. Vernon Ning Hsu & Renato de Matta & Chung‐Yee Lee, 2003. "Scheduling patients in an ambulatory surgical center," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(3), pages 218-238, April.
  21. Guinet, Alain & Chaabane, Sondes, 2003. "Operating theatre planning," International Journal of Production Economics, Elsevier, vol. 85(1), pages 69-81, July.
  22. Mascis, Alessandro & Pacciarelli, Dario, 2002. "Job-shop scheduling with blocking and no-wait constraints," European Journal of Operational Research, Elsevier, vol. 143(3), pages 498-517, December.
  23. Che, Ada & Chu, Chengbin, 2009. "Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots," European Journal of Operational Research, Elsevier, vol. 199(1), pages 77-88, November.
  24. Allahverdi, Ali, 2016. "A survey of scheduling problems with no-wait in process," European Journal of Operational Research, Elsevier, vol. 255(3), pages 665-686.
  25. Groflin, Heinz & Klinkert, Andreas, 2007. "Feasible insertions in job shop scheduling, short cycles and stable sets," European Journal of Operational Research, Elsevier, vol. 177(2), pages 763-785, March.
  26. Schaller, Jeffrey & Valente, Jorge M.S., 2020. "Minimizing total earliness and tardiness in a nowait flow shop," International Journal of Production Economics, Elsevier, vol. 224(C).
  27. Rubén Ruiz & Ali Allahverdi, 2007. "Some effective heuristics for no-wait flowshops with setup times to minimize total completion time," Annals of Operations Research, Springer, vol. 156(1), pages 143-171, December.
  28. Bagchi, Tapan P. & Gupta, Jatinder N.D. & Sriskandarajah, Chelliah, 2006. "A review of TSP based approaches for flowshop scheduling," European Journal of Operational Research, Elsevier, vol. 169(3), pages 816-854, March.
  29. Soukhal, A. & Oulamara, A. & Martineau, P., 2005. "Complexity of flow shop scheduling problems with transportation constraints," European Journal of Operational Research, Elsevier, vol. 161(1), pages 32-41, February.
  30. S I Brown & R G McGarvey & J A Ventura, 2004. "Total flowtime and makespan for a no-wait m-machine flowshop with set-up times separated," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(6), pages 614-621, June.
  31. Pang, King-Wah, 2013. "A genetic algorithm based heuristic for two machine no-wait flowshop scheduling problems with class setup times that minimizes maximum lateness," International Journal of Production Economics, Elsevier, vol. 141(1), pages 127-136.
  32. Joaquín Bautista-Valhondo & Rocío Alfaro-Pozo, 2020. "Mixed integer linear programming models for Flow Shop Scheduling with a demand plan of job types," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 28(1), pages 5-23, March.
  33. Nowicki, Eugeniusz, 1999. "The permutation flow shop with buffers: A tabu search approach," European Journal of Operational Research, Elsevier, vol. 116(1), pages 205-219, July.
  34. Jung, Jung Woo & Lee, Young Hae, 2010. "Heuristic algorithms for production and transportation planning through synchronization of a serial supply chain," International Journal of Production Economics, Elsevier, vol. 124(2), pages 433-447, April.
  35. Fatemi-Anaraki, Soroush & Tavakkoli-Moghaddam, Reza & Foumani, Mehdi & Vahedi-Nouri, Behdin, 2023. "Scheduling of Multi-Robot Job Shop Systems in Dynamic Environments: Mixed-Integer Linear Programming and Constraint Programming Approaches," Omega, Elsevier, vol. 115(C).
  36. Ansis Ozolins, 2019. "Improved bounded dynamic programming algorithm for solving the blocking flow shop problem," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 27(1), pages 15-38, March.
  37. Allahverdi, Ali & Aydilek, Harun & Aydilek, Asiye, 2018. "No-wait flowshop scheduling problem with two criteria; total tardiness and makespan," European Journal of Operational Research, Elsevier, vol. 269(2), pages 590-601.
  38. Weiya Zhong & Yun Shi, 2018. "Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility," Journal of Combinatorial Optimization, Springer, vol. 35(1), pages 108-125, January.
  39. H. S. R. Martins & F. R. B. Cruz & A. R. Duarte & F. L. P. Oliveira, 2019. "Modeling and optimization of buffers and servers in finite queueing networks," OPSEARCH, Springer;Operational Research Society of India, vol. 56(1), pages 123-150, March.
  40. J.-C. Billaut & F. Della Croce & F. Salassa & V. T’kindt, 2019. "No-idle, no-wait: when shop scheduling meets dominoes, Eulerian paths and Hamiltonian paths," Journal of Scheduling, Springer, vol. 22(1), pages 59-68, February.
  41. Pan, Quan-Ke & Wang, Ling, 2012. "Effective heuristics for the blocking flowshop scheduling problem with makespan minimization," Omega, Elsevier, vol. 40(2), pages 218-229, April.
  42. Marcelo Seido Nagano & Adriano Seiko Komesu & Hugo Hissashi Miyata, 2019. "An evolutionary clustering search for the total tardiness blocking flow shop problem," Journal of Intelligent Manufacturing, Springer, vol. 30(4), pages 1843-1857, April.
  43. Huq, Faizul & Cutright, Kenneth & Martin, Clarence, 2004. "Employee scheduling and makespan minimization in a flow shop with multi-processor work stations: a case study," Omega, Elsevier, vol. 32(2), pages 121-129, April.
  44. Zhu, Jie & Li, Xiaoping & Wang, Qian, 2009. "Complete local search with limited memory algorithm for no-wait job shops to minimize makespan," European Journal of Operational Research, Elsevier, vol. 198(2), pages 378-386, October.
  45. Matthias Bultmann & Sigrid Knust & Stefan Waldherr, 2018. "Flow shop scheduling with flexible processing times," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 40(3), pages 809-829, July.
  46. Meloni, Carlo & Pranzo, Marco & Samà, Marcella, 2022. "Evaluation of VaR and CVaR for the makespan in interval valued blocking job shops," International Journal of Production Economics, Elsevier, vol. 247(C).
  47. L Tang & H Xuan, 2006. "Lagrangian relaxation algorithms for real-time hybrid flowshop scheduling with finite intermediate buffers," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(3), pages 316-324, March.
  48. Caraffa, Vince & Ianes, Stefano & P. Bagchi, Tapan & Sriskandarajah, Chelliah, 2001. "Minimizing makespan in a blocking flowshop using genetic algorithms," International Journal of Production Economics, Elsevier, vol. 70(2), pages 101-115, March.
  49. Pranzo, Marco, 2004. "Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times," European Journal of Operational Research, Elsevier, vol. 153(3), pages 581-592, March.
  50. Martinez, S. & Dauzere-Peres, S. & Gueret, C. & Mati, Y. & Sauer, N., 2006. "Complexity of flowshop scheduling problems with a new blocking constraint," European Journal of Operational Research, Elsevier, vol. 169(3), pages 855-864, March.
  51. Débora Ronconi, 2005. "A Branch-and-Bound Algorithm to Minimize the Makespan in a Flowshop with Blocking," Annals of Operations Research, Springer, vol. 138(1), pages 53-65, September.
  52. Marco Pranzo & Dario Pacciarelli, 2016. "An iterated greedy metaheuristic for the blocking job shop scheduling problem," Journal of Heuristics, Springer, vol. 22(4), pages 587-611, August.
  53. Ribas, Imma & Companys, Ramon & Tort-Martorell, Xavier, 2011. "An iterated greedy algorithm for the flowshop scheduling problem with blocking," Omega, Elsevier, vol. 39(3), pages 293-301, June.
  54. Abdelhakim AitZai & Brahim Benmedjdoub & Mourad Boudhar, 2016. "Branch-and-bound and PSO algorithms for no-wait job shop scheduling," Journal of Intelligent Manufacturing, Springer, vol. 27(3), pages 679-688, June.
  55. S. S. Panwalkar & Christos Koulamas, 2020. "Three-stage ordered flow shops with either synchronous flow, blocking or no-idle machines," Journal of Scheduling, Springer, vol. 23(1), pages 145-154, February.
  56. Raaymakers, W. H. M. & Hoogeveen, J. A., 2000. "Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing," European Journal of Operational Research, Elsevier, vol. 126(1), pages 131-151, October.
  57. Allahverdi, Ali & Aldowaisan, Tariq, 2004. "No-wait flowshops with bicriteria of makespan and maximum lateness," European Journal of Operational Research, Elsevier, vol. 152(1), pages 132-147, January.
  58. Christoph Schuster, 2006. "No-wait Job Shop Scheduling: Tabu Search and Complexity of Subproblems," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 63(3), pages 473-491, July.
  59. Kravchenko, Svetlana A., 1998. "A polynomial algorithm for a two-machine no-wait job-shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 106(1), pages 101-107, April.
  60. Aldowaisan, Tariq & Allahverdi, Ali, 2004. "New heuristics for m-machine no-wait flowshop to minimize total completion time," Omega, Elsevier, vol. 32(5), pages 345-352, October.
  61. Allahverdi, Ali & Gupta, Jatinder N. D. & Aldowaisan, Tariq, 1999. "A review of scheduling research involving setup considerations," Omega, Elsevier, vol. 27(2), pages 219-239, April.
  62. Jens Poppenborg & Sigrid Knust, 2016. "Modeling and optimizing the evacuation of hospitals based on the MRCPSP with resource transfers," EURO Journal on Computational Optimization, Springer;EURO - The Association of European Operational Research Societies, vol. 4(3), pages 349-380, September.
  63. A. Gómez-Corral & M. E. Martos, 2009. "Marked Markovian Arrivals in a Tandem G-Network with Blocking," Methodology and Computing in Applied Probability, Springer, vol. 11(4), pages 621-649, December.
  64. Mario Levorato & David Sotelo & Rosa Figueiredo & Yuri Frota, 2024. "Efficient solutions to the m-machine robust flow shop under budgeted uncertainty," Annals of Operations Research, Springer, vol. 338(1), pages 765-799, July.
  65. Ahmadian, Mohammad Mahdi & Khatami, Mostafa & Salehipour, Amir & Cheng, T.C.E., 2021. "Four decades of research on the open-shop scheduling problem to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 295(2), pages 399-426.
  66. Allahverdi, Ali & Aydilek, Harun, 2014. "Total completion time with makespan constraint in no-wait flowshops with setup times," European Journal of Operational Research, Elsevier, vol. 238(3), pages 724-734.
  67. Giaro, Krzysztof, 2001. "NP-hardness of compact scheduling in simplified open and flow shops," European Journal of Operational Research, Elsevier, vol. 130(1), pages 90-98, April.
  68. Mogali, Jayanth Krishna & Barbulescu, Laura & Smith, Stephen F., 2021. "Efficient primal heuristic updates for the blocking job shop problem," European Journal of Operational Research, Elsevier, vol. 295(1), pages 82-101.
  69. Fink, Andreas & Vo[ss], Stefan, 2003. "Solving the continuous flow-shop scheduling problem by metaheuristics," European Journal of Operational Research, Elsevier, vol. 151(2), pages 400-414, December.
  70. Ronconi, Debora P., 2004. "A note on constructive heuristics for the flowshop problem with blocking," International Journal of Production Economics, Elsevier, vol. 87(1), pages 39-48, January.
  71. Nicholas G. Hall & Gilbert Laporte & Esaignani Selvarajah & Chelliah Sriskandarajah, 2005. "Scheduling and lot streaming in two‐machine open shops with no‐wait in process," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(3), pages 261-275, April.
  72. Alvarez-Valdes, R. & Fuertes, A. & Tamarit, J. M. & Gimenez, G. & Ramos, R., 2005. "A heuristic to schedule flexible job-shop in a glass factory," European Journal of Operational Research, Elsevier, vol. 165(2), pages 525-534, September.
  73. Yuan, Jinjiang & Soukhal, Ameur & Chen, Youjun & Lu, Lingfa, 2007. "A note on the complexity of flow shop scheduling with transportation constraints," European Journal of Operational Research, Elsevier, vol. 178(3), pages 918-925, May.
  74. Marcin Mucha & Maxim Sviridenko, 2016. "No-Wait Flowshop Scheduling Is as Hard as Asymmetric Traveling Salesman Problem," Mathematics of Operations Research, INFORMS, vol. 41(1), pages 247-254, February.
  75. Naderi, B. & Zandieh, M., 2014. "Modeling and scheduling no-wait open shop problems," International Journal of Production Economics, Elsevier, vol. 158(C), pages 256-266.
  76. Samà, Marcella & D’Ariano, Andrea & D’Ariano, Paolo & Pacciarelli, Dario, 2017. "Scheduling models for optimal aircraft traffic control at busy airports: Tardiness, priorities, equity and violations considerations," Omega, Elsevier, vol. 67(C), pages 81-98.
  77. Carlier, Jacques & Haouari, Mohamed & Kharbeche, Mohamed & Moukrim, Aziz, 2010. "An optimization-based heuristic for the robotic cell problem," European Journal of Operational Research, Elsevier, vol. 202(3), pages 636-645, May.
  78. Lee, Wen-Chiung & Shiau, Yau-Ren & Chen, Shiuan-Kang & Wu, Chin-Chia, 2010. "A two-machine flowshop scheduling problem with deteriorating jobs and blocking," International Journal of Production Economics, Elsevier, vol. 124(1), pages 188-197, March.
  79. Neil Geismar, H. & Dawande, Milind & Sriskandarajah, Chelliah, 2005. "Approximation algorithms for k-unit cyclic solutions in robotic cells," European Journal of Operational Research, Elsevier, vol. 162(2), pages 291-309, April.
  80. Lin, Shih-Wei & Ying, Kuo-Ching, 2013. "Minimizing makespan in a blocking flowshop using a revised artificial immune system algorithm," Omega, Elsevier, vol. 41(2), pages 383-389.
  81. Donald Davendra & Ivan Zelinka & Magdalena Bialic-Davendra & Roman Senkerik & Roman Jasek, 2012. "Clustered enhanced differential evolution for the blocking flow shop scheduling problem," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 20(4), pages 679-717, December.
  82. Soukhal, A. & Martineau, P., 2005. "Resolution of a scheduling problem in a flowshop robotic cell," European Journal of Operational Research, Elsevier, vol. 161(1), pages 62-72, February.
  83. Stefansdottir, Bryndis & Grunow, Martin & Akkerman, Renzo, 2017. "Classifying and modeling setups and cleanings in lot sizing and scheduling," European Journal of Operational Research, Elsevier, vol. 261(3), pages 849-865.
  84. Shabtay, Dvir & Arviv, Kfir & Stern, Helman & Edan, Yael, 2014. "A combined robot selection and scheduling problem for flow-shops with no-wait restrictions," Omega, Elsevier, vol. 43(C), pages 96-107.
  85. I.N. Kamal Abadi & Nicholas G. Hall & Chelliah Sriskandarajah, 2000. "Minimizing Cycle Time in a Blocking Flowshop," Operations Research, INFORMS, vol. 48(1), pages 177-180, February.
  86. Zhi-Long Chen, 2010. "Integrated Production and Outbound Distribution Scheduling: Review and Extensions," Operations Research, INFORMS, vol. 58(1), pages 130-148, February.
  87. S.S. Panwalkar & Milton L. Smith & Christos Koulamas, 2013. "Review of the ordered and proportionate flow shop scheduling research," Naval Research Logistics (NRL), John Wiley & Sons, vol. 60(1), pages 46-55, February.
  88. Jayanth Krishna Mogali & Joris Kinable & Stephen F. Smith & Zachary B. Rubinstein, 2021. "Scheduling for multi-robot routing with blocking and enabling constraints," Journal of Scheduling, Springer, vol. 24(3), pages 291-318, June.
  89. Ronconi, Débora P. & Henriques, Luís R.S., 2009. "Some heuristic algorithms for total tardiness minimization in a flowshop with blocking," Omega, Elsevier, vol. 37(2), pages 272-281, April.
  90. Allahverdi, Ali, 1999. "Stochastically minimizing total flowtime in flowshops with no waiting space," European Journal of Operational Research, Elsevier, vol. 113(1), pages 101-112, February.
  91. Koulamas, Christos & Kyparisis, George J., 2023. "Two-stage no-wait proportionate flow shop scheduling with minimal service time variation and optional job rejection," European Journal of Operational Research, Elsevier, vol. 305(2), pages 608-616.
  92. Frank Benda & Roland Braune & Karl F. Doerner & Richard F. Hartl, 2019. "A machine learning approach for flow shop scheduling problems with alternative resources, sequence-dependent setup times, and blocking," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 871-893, December.
  93. Jebali, AIda & Hadj Alouane, Atidel B. & Ladet, Pierre, 2006. "Operating rooms scheduling," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 52-62, February.
  94. Lin, Shih-Wei & Ying, Kuo-Ching, 2016. "Optimization of makespan for no-wait flowshop scheduling problems using efficient matheuristics," Omega, Elsevier, vol. 64(C), pages 115-125.
  95. Grabowski, Jøzef & Pempera, Jaroslaw, 2007. "The permutation flow shop problem with blocking. A tabu search approach," Omega, Elsevier, vol. 35(3), pages 302-311, June.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.