Minimizing total earliness and tardiness in a nowait flow shop

Author

Listed:
  • Schaller, Jeffrey
  • Valente, Jorge M.S.

Abstract

This paper considers the problem of scheduling jobs in a no-wait flow shop with the objective of minimizing total earliness and tardiness. An exact branch-and-bound algorithm is developed for the problem. Several dispatching heuristics used previously for other environments and two new heuristics were tested under a variety of conditions. It was found that one of the new heuristics consistently performed well compared to the others. An insertion search improvement procedure with speed up methods based on the structure of the problem was proposed and was found to deliver much improved solutions in a reasonable amount of time.

Suggested Citation

  • Schaller, Jeffrey & Valente, Jorge M.S., 2020. "Minimizing total earliness and tardiness in a nowait flow shop," International Journal of Production Economics, Elsevier, vol. 224(C).
  • Handle: RePEc:eee:proeco:v:224:y:2020:i:c:s0925527319303688
    DOI: 10.1016/j.ijpe.2019.107542
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527319303688
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2019.107542?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Hoogeveen, Han, 2005. "Multicriteria scheduling," European Journal of Operational Research, Elsevier, vol. 167(3), pages 592-623, December.
    2. J. Steve Davis & John J. Kanet, 1993. "Single‐machine scheduling with early and tardy completion costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(1), pages 85-101, February.
    3. Wlodzimierz Szwarc, 1993. "Adjacent orderings in single‐machine scheduling with earliness and tardiness penalties," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(2), pages 229-243, March.
    4. Nicholas G. Hall & Chelliah Sriskandarajah, 1996. "A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process," Operations Research, INFORMS, vol. 44(3), pages 510-525, June.
    5. Yano, Candace Arai & Kim, Yeong-Dae, 1991. "Algorithms for a class of single-machine weighted tardiness and earliness problems," European Journal of Operational Research, Elsevier, vol. 52(2), pages 167-178, May.
    6. Raghu, T. S. & Rajendran, Chandrasekharan, 1993. "An efficient dynamic dispatching rule for scheduling in a job shop," International Journal of Production Economics, Elsevier, vol. 32(3), pages 301-313, November.
    7. N Madhushini & C Rajendran & Y Deepa, 2009. "Branch-and-bound algorithms for scheduling in permutation flowshops to minimize the sum of weighted flowtime/sum of weighted tardiness/sum of weighted flowtime and weighted tardiness/sum of weighted f," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(7), pages 991-1004, July.
    8. Kenneth R. Baker & Gary D. Scudder, 1990. "Sequencing with Earliness and Tardiness Penalties: A Review," Operations Research, INFORMS, vol. 38(1), pages 22-36, February.
    9. Xiong, Hegen & Fan, Huali & Jiang, Guozhang & Li, Gongfa, 2017. "A simulation-based study of dispatching rules in a dynamic job shop scheduling problem with batch release and extended technical precedence constraints," European Journal of Operational Research, Elsevier, vol. 257(1), pages 13-24.
    10. Yeong‐Dae Kim & Candace Arai Yano, 1994. "Minimizing mean tardiness and earliness in single‐machine scheduling problems with unequal due dates," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(7), pages 913-933, December.
    11. Ari P. J. Vepsalainen & Thomas E. Morton, 1987. "Priority Rules for Job Shops with Weighted Tardiness Costs," Management Science, INFORMS, vol. 33(8), pages 1035-1047, August.
    12. Moslehi, G. & Mirzaee, M. & Vasei, M. & Modarres, M. & Azaron, A., 2009. "Two-machine flow shop scheduling to minimize the sum of maximum earliness and tardiness," International Journal of Production Economics, Elsevier, vol. 122(2), pages 763-773, December.
    13. Jianya Ding & Shiji Song & Rui Zhang & Jatinder N.D. Gupta & Cheng Wu, 2015. "Accelerated methods for total tardiness minimisation in no-wait flowshops," International Journal of Production Research, Taylor & Francis Journals, vol. 53(4), pages 1002-1018, February.
    14. Peng Si Ow & Thomas E. Morton, 1989. "The Single Machine Early/Tardy Problem," Management Science, INFORMS, vol. 35(2), pages 177-191, February.
    15. Taillard, E., 1993. "Benchmarks for basic scheduling problems," European Journal of Operational Research, Elsevier, vol. 64(2), pages 278-285, January.
    16. S. S. Panwalkar & Wafik Iskander, 1977. "A Survey of Scheduling Rules," Operations Research, INFORMS, vol. 25(1), pages 45-61, February.
    17. John J. Kanet & V. Sridharan, 2000. "Scheduling with Inserted Idle Time: Problem Taxonomy and Literature Review," Operations Research, INFORMS, vol. 48(1), pages 99-110, February.
    18. Vinod, V. & Sridharan, R., 2011. "Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system," International Journal of Production Economics, Elsevier, vol. 129(1), pages 127-146, January.
    19. J Schaller & J M S Valente, 2013. "An evaluation of heuristics for scheduling a non-delay permutation flow shop with family setups to minimize total earliness and tardiness," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 64(6), pages 805-816, June.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. N Nekoiemehr & G Moslehi, 2011. "Minimizing the sum of maximum earliness and maximum tardiness in the single-machine scheduling problem with sequence-dependent setup time," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(7), pages 1403-1412, July.
    2. Jaw‐Yeh Chen & Sheng‐Fuu Lin, 2002. "Minimizing weighted earliness and tardiness penalties in single‐machine scheduling with idle time permitted," Naval Research Logistics (NRL), John Wiley & Sons, vol. 49(8), pages 760-780, December.
    3. Vincent T’kindt & Karima Bouibede-Hocine & Carl Esswein, 2007. "Counting and enumeration complexity with application to multicriteria scheduling," Annals of Operations Research, Springer, vol. 153(1), pages 215-234, September.
    4. J M S Valente, 2010. "Beam search heuristics for quadratic earliness and tardiness scheduling," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(4), pages 620-631, April.
    5. John J. Kanet & V. Sridharan, 2000. "Scheduling with Inserted Idle Time: Problem Taxonomy and Literature Review," Operations Research, INFORMS, vol. 48(1), pages 99-110, February.
    6. Baker, Kenneth R., 2014. "Minimizing earliness and tardiness costs in stochastic scheduling," European Journal of Operational Research, Elsevier, vol. 236(2), pages 445-452.
    7. Kate, H.A. ten & Wijngaard, J. & Zijm, W.H.M., 1995. "Minimizing weighted total earliness, total tardiness and setup costs," Research Report 95A37, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
    8. Ventura, Jose A. & Radhakrishnan, Sanjay, 2003. "Single machine scheduling with symmetric earliness and tardiness penalties," European Journal of Operational Research, Elsevier, vol. 144(3), pages 598-612, February.
    9. Bierwirth, C. & Kuhpfahl, J., 2017. "Extended GRASP for the job shop scheduling problem with total weighted tardiness objective," European Journal of Operational Research, Elsevier, vol. 261(3), pages 835-848.
    10. George Li, 1997. "Single machine earliness and tardiness scheduling," European Journal of Operational Research, Elsevier, vol. 96(3), pages 546-558, February.
    11. Jorge M. S. Valente, 2008. "Beam search heuristics for quadratic earliness and tardiness scheduling," FEP Working Papers 279, Universidade do Porto, Faculdade de Economia do Porto.
    12. Alvarez-Valdes, R. & Fuertes, A. & Tamarit, J. M. & Gimenez, G. & Ramos, R., 2005. "A heuristic to schedule flexible job-shop in a glass factory," European Journal of Operational Research, Elsevier, vol. 165(2), pages 525-534, September.
    13. James, R. J. W. & Buchanan, J. T., 1997. "A neighbourhood scheme with a compressed solution space for the early/tardy scheduling problem," European Journal of Operational Research, Elsevier, vol. 102(3), pages 513-527, November.
    14. Maria Raquel C. Costa & Jorge M. S. Valente & Jeffrey E. Schaller, 2020. "Efficient procedures for the weighted squared tardiness permutation flowshop scheduling problem," Flexible Services and Manufacturing Journal, Springer, vol. 32(3), pages 487-522, September.
    15. Jorge M. S. Valente & Maria R. A. Moreira & Alok Singh & Rui A. F. S. Alves, 2009. "Genetic algorithms for single machine scheduling with quadratic earliness and tardiness costs," FEP Working Papers 312, Universidade do Porto, Faculdade de Economia do Porto.
    16. Alidaee, Bahram & Li, Haitao & Wang, Haibo & Womer, Keith, 2021. "Integer programming formulations in sequencing with total earliness and tardiness penalties, arbitrary due dates, and no idle time: A concise review and extension," Omega, Elsevier, vol. 103(C).
    17. Wan, Guohua & Yen, Benjamin P. -C., 2002. "Tabu search for single machine scheduling with distinct due windows and weighted earliness/tardiness penalties," European Journal of Operational Research, Elsevier, vol. 142(2), pages 271-281, October.
    18. Jorge M. S. Valente & Maria R. A. Moreira, 2008. "Greedy randomized dispatching heuristics for the single machine scheduling problem with quadratic earliness and tardiness penalties," FEP Working Papers 286, Universidade do Porto, Faculdade de Economia do Porto.
    19. Esteve, B. & Aubijoux, C. & Chartier, A. & T'kindt, V., 2006. "A recovering beam search algorithm for the single machine Just-in-Time scheduling problem," European Journal of Operational Research, Elsevier, vol. 172(3), pages 798-813, August.
    20. Kasper, T.A. Arno & Land, Martin J. & Teunter, Ruud H., 2023. "Towards System State Dispatching in High‐Variety Manufacturing," Omega, Elsevier, vol. 114(C).

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:224:y:2020:i:c:s0925527319303688. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.