New Search Spaces for Sequencing Problems with Application to Job Shop Scheduling
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Kolisch, Rainer, 1994. "Serial and parallel resource-constrained projekt scheduling methodes revisited: Theory and computation," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 344, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- A. Ozolins, 2020. "A new exact algorithm for no-wait job shop problem to minimize makespan," Operational Research, Springer, vol. 20(4), pages 2333-2363, December.
- Susana Fernandes & Helena Ramalhinho-Lourenço, 2007. "A simple optimised search heuristic for the job-shop scheduling problem," Economics Working Papers 1050, Department of Economics and Business, Universitat Pompeu Fabra.
- Guinet, Alain, 2000. "Efficiency of reductions of job-shop to flow-shop problems," European Journal of Operational Research, Elsevier, vol. 125(3), pages 469-485, September.
- Ransberger, Martin & Morgenstern, Ingo & Schneider, Johannes J., 2011. "Influence of rounding errors on the quality of heuristic optimization algorithms," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 390(13), pages 2571-2581.
- Kolisch, R. & Padman, R., 2001.
"An integrated survey of deterministic project scheduling,"
Omega, Elsevier, vol. 29(3), pages 249-272, June.
- Kolisch, Rainer & Padman, R., 2001. "An integrated survey of deterministic project scheduling," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 8114, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
- Andrzej Bożek, 2020. "Energy Cost-Efficient Task Positioning in Manufacturing Systems," Energies, MDPI, vol. 13(19), pages 1-21, September.
- Mattfeld, Dirk C. & Bierwirth, Christian, 2004. "An efficient genetic algorithm for job shop scheduling with tardiness objectives," European Journal of Operational Research, Elsevier, vol. 155(3), pages 616-630, June.
- Drexl, Andreas & Salewski, Frank, 1996. "Distribution Requirements and Compactness Constraints in School Timetabling. Part II: Methods," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 384, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Reinhard Bürgy & Heinz Gröflin, 2017. "The no-wait job shop with regular objective: a method based on optimal job insertion," Journal of Combinatorial Optimization, Springer, vol. 33(3), pages 977-1010, April.
- Da Col, Giacomo & Teppan, Erich C., 2022. "Industrial-size job shop scheduling with constraint programming," Operations Research Perspectives, Elsevier, vol. 9(C).
- Andreas Schirmer, 2000. "Case‐based reasoning and improved adaptive search for project scheduling," Naval Research Logistics (NRL), John Wiley & Sons, vol. 47(3), pages 201-222, April.
- Christoph Schuster, 2006. "No-wait Job Shop Scheduling: Tabu Search and Complexity of Subproblems," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 63(3), pages 473-491, July.
- Franz Rothlauf, 2009. "An Encoding in Metaheuristics for the Minimum Communication Spanning Tree Problem," INFORMS Journal on Computing, INFORMS, vol. 21(4), pages 575-584, November.
- Zapfel, G. & Wasner, M., 2000. "A heuristic solution concept for a generalized machine sequencing problem with an application to radiator manufacturing," International Journal of Production Economics, Elsevier, vol. 68(2), pages 199-213, November.
- A Corominas & R Pastor, 2011. "Designing greedy algorithms for the flow-shop problem by means of Empirically Adjusted Greedy Heuristics (EAGH)," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(9), pages 1704-1710, September.
- Sels, Veronique & Craeymeersch, Kjeld & Vanhoucke, Mario, 2011.
"A hybrid single and dual population search procedure for the job shop scheduling problem,"
European Journal of Operational Research, Elsevier, vol. 215(3), pages 512-523, December.
- V. Sels & K. Craeymeersch & M. Vanhoucke, 2010. "A hybrid single and dual population search procedure for the job shop scheduling problem," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 10/679, Ghent University, Faculty of Economics and Business Administration.
- Lochtefeld, Darrell F. & Ciarallo, Frank W., 2015. "Multi-objectivization Via Decomposition: An analysis of helper-objectives and complete decomposition," European Journal of Operational Research, Elsevier, vol. 243(2), pages 395-404.
- Frederix, Florent, 2001. "An extended enterprise planning methodology for the discrete manufacturing industry," European Journal of Operational Research, Elsevier, vol. 129(2), pages 317-325, March.
- Fernandez-Viagas, Victor & Molina-Pariente, Jose M. & Framinan, Jose M., 2020. "Generalised accelerations for insertion-based heuristics in permutation flowshop scheduling," European Journal of Operational Research, Elsevier, vol. 282(3), pages 858-872.
- Ganesan, Viswanath Kumar & Sivakumar, Appa Iyer, 2006. "Scheduling in static jobshops for minimizing mean flowtime subject to minimum total deviation of job completion times," International Journal of Production Economics, Elsevier, vol. 103(2), pages 633-647, October.
- Akturk, M. Selim & Ozdemir, Deniz, 2001. "A new dominance rule to minimize total weighted tardiness with unequal release dates," European Journal of Operational Research, Elsevier, vol. 135(2), pages 394-412, December.
- Branke, Juergen & Pickardt, Christoph W., 2011. "Evolutionary search for difficult problem instances to support the design of job shop dispatching rules," European Journal of Operational Research, Elsevier, vol. 212(1), pages 22-32, July.
- Ahmed Kouider & Hacène Ait Haddadène & Samia Ourari & Ammar Oulamara, 2017. "Mixed graph colouring for unit-time scheduling," International Journal of Production Research, Taylor & Francis Journals, vol. 55(6), pages 1720-1729, March.
- Schirmer, Andreas & Riesenberg, Sven, 1997. "Parameterized heuristics for project scheduling: Biased random sampling methods," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 456, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Diarmuid Grimes & Emmanuel Hebrard, 2015. "Solving Variants of the Job Shop Scheduling Problem Through Conflict-Directed Search," INFORMS Journal on Computing, INFORMS, vol. 27(2), pages 268-284, May.
- Blazewicz, Jacek & Domschke, Wolfgang & Pesch, Erwin, 1996. "The job shop scheduling problem: Conventional and new solution techniques," European Journal of Operational Research, Elsevier, vol. 93(1), pages 1-33, August.
- Khouja, Moutaz & Goyal, Suresh, 2008. "A review of the joint replenishment problem literature: 1989-2005," European Journal of Operational Research, Elsevier, vol. 186(1), pages 1-16, April.
- Kurz, Mary E. & Askin, Ronald G., 2003. "Comparing scheduling rules for flexible flow lines," International Journal of Production Economics, Elsevier, vol. 85(3), pages 371-388, September.
- C N Potts & V A Strusevich, 2009. "Fifty years of scheduling: a survey of milestones," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 41-68, May.
- Jain, A. S. & Meeran, S., 1999. "Deterministic job-shop scheduling: Past, present and future," European Journal of Operational Research, Elsevier, vol. 113(2), pages 390-434, March.
- Valls, Vicente & Quintanilla, Sacramento & Ballestin, Francisco, 2003. "Resource-constrained project scheduling: A critical activity reordering heuristic," European Journal of Operational Research, Elsevier, vol. 149(2), pages 282-301, September.
- Fernando Luis Rossi & Marcelo Seido Nagano, 2022. "Beam search-based heuristics for the mixed no-idle flowshop with total flowtime criterion," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 44(4), pages 1311-1346, December.
- Yabo Luo, 2017. "Nested optimization method combining complex method and ant colony optimization to solve JSSP with complex associated processes," Journal of Intelligent Manufacturing, Springer, vol. 28(8), pages 1801-1815, December.
- Kolisch, Rainer & Sprecher, Arno, 1997. "PSPLIB - A project scheduling problem library : OR Software - ORSEP Operations Research Software Exchange Program," European Journal of Operational Research, Elsevier, vol. 96(1), pages 205-216, January.
- Yuanfei Wei & Zalinda Othman & Kauthar Mohd Daud & Shihong Yin & Qifang Luo & Yongquan Zhou, 2022. "Equilibrium Optimizer and Slime Mould Algorithm with Variable Neighborhood Search for Job Shop Scheduling Problem," Mathematics, MDPI, vol. 10(21), pages 1-20, November.
- G I Zobolas & C D Tarantilis & G Ioannou, 2009. "A hybrid evolutionary algorithm for the job shop scheduling problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(2), pages 221-235, February.
- Bierwirth, C. & Kuhpfahl, J., 2017. "Extended GRASP for the job shop scheduling problem with total weighted tardiness objective," European Journal of Operational Research, Elsevier, vol. 261(3), pages 835-848.
- Murovec, Boštjan, 2015. "Job-shop local-search move evaluation without direct consideration of the criterion’s value," European Journal of Operational Research, Elsevier, vol. 241(2), pages 320-329.
- Jeet, V. & Kutanoglu, E., 2007. "Lagrangian relaxation guided problem space search heuristics for generalized assignment problems," European Journal of Operational Research, Elsevier, vol. 182(3), pages 1039-1056, November.
- Kedar S. Naphade & S. David Wu & Robert H. Storer & Bhavin J. Doshi, 2001. "Melt Scheduling to Trade Off Material Waste and Shipping Performance," Operations Research, INFORMS, vol. 49(5), pages 629-645, October.
- Guinet, Alain & Legrand, Marie, 1998. "Reduction of job-shop problems to flow-shop problems with precedence constraints," European Journal of Operational Research, Elsevier, vol. 109(1), pages 96-110, August.
- Ninio, Matan & Schneider, Johannes J., 2005. "Weight annealing," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 349(3), pages 649-666.
- Zhou, Hong & Cheung, Waiman & Leung, Lawrence C., 2009. "Minimizing weighted tardiness of job-shop scheduling using a hybrid genetic algorithm," European Journal of Operational Research, Elsevier, vol. 194(3), pages 637-649, May.
- Demirkol, Ebru & Mehta, Sanjay & Uzsoy, Reha, 1998. "Benchmarks for shop scheduling problems," European Journal of Operational Research, Elsevier, vol. 109(1), pages 137-141, August.
- Jewel S. Bonser & S. David Wu, 2001. "Procurement Planning to Maintain Both Short-Term Adaptiveness and Long-Term Perspective," Management Science, INFORMS, vol. 47(6), pages 769-786, June.
- Gupta, Skylab R. & Smith, Jeffrey S., 2006. "Algorithms for single machine total tardiness scheduling with sequence dependent setups," European Journal of Operational Research, Elsevier, vol. 175(2), pages 722-739, December.
- Bryan A. Norman & James C. Bean, 1999. "A genetic algorithm methodology for complex scheduling problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(2), pages 199-211, March.
- Steinhofel, K. & Albrecht, A. & Wong, C. K., 1999. "Two simulated annealing-based heuristics for the job shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 118(3), pages 524-548, November.
- Kurz, Mary E. & Askin, Ronald G., 2004. "Scheduling flexible flow lines with sequence-dependent setup times," European Journal of Operational Research, Elsevier, vol. 159(1), pages 66-82, November.
- Nicholas G. Hall & Marc E. Posner, 2001. "Generating Experimental Data for Computational Testing with Machine Scheduling Applications," Operations Research, INFORMS, vol. 49(6), pages 854-865, December.
- Joao António Noivo & Helena Ramalhinho-Lourenço, 1998. "Solving two production scheduling problems with sequence-dependent set-up times," Economics Working Papers 338, Department of Economics and Business, Universitat Pompeu Fabra.
- Edzard Weber & Anselm Tiefenbacher & Norbert Gronau, 2019. "Need for Standardization and Systematization of Test Data for Job-Shop Scheduling," Data, MDPI, vol. 4(1), pages 1-21, February.
- Salewski, Frank & Bartsch, Thomas, 1994. "A comparison of genetic and greedy randomized algorithms for medium-to-short-term audit-staff scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 356, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- James, R. J. W. & Buchanan, J. T., 1997. "A neighbourhood scheme with a compressed solution space for the early/tardy scheduling problem," European Journal of Operational Research, Elsevier, vol. 102(3), pages 513-527, November.
- Kolisch, Rainer, 1994. "Efficient priority rules for the resource-constrained project scheduling problem," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 350, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Fontes, Dalila B.M.M. & Homayouni, S. Mahdi & Gonçalves, José F., 2023. "A hybrid particle swarm optimization and simulated annealing algorithm for the job shop scheduling problem with transport resources," European Journal of Operational Research, Elsevier, vol. 306(3), pages 1140-1157.
- Selcuk Goren & Ihsan Sabuncuoglu & Utku Koc, 2012. "Optimization of schedule stability and efficiency under processing time variability and random machine breakdowns in a job shop environment," Naval Research Logistics (NRL), John Wiley & Sons, vol. 59(1), pages 26-38, February.
- Bahman Naderi & Rubén Ruiz & Vahid Roshanaei, 2023. "Mixed-Integer Programming vs. Constraint Programming for Shop Scheduling Problems: New Results and Outlook," INFORMS Journal on Computing, INFORMS, vol. 35(4), pages 817-843, July.
- Schirmer, Andreas, 1998. "Case-based reasoning and improved adaptive search for project scheduling," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 472, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Zhu, Jie & Li, Xiaoping & Wang, Qian, 2009. "Complete local search with limited memory algorithm for no-wait job shops to minimize makespan," European Journal of Operational Research, Elsevier, vol. 198(2), pages 378-386, October.
- T. C. E. Cheng & Bo Peng & Zhipeng Lü, 2016. "A hybrid evolutionary algorithm to solve the job shop scheduling problem," Annals of Operations Research, Springer, vol. 242(2), pages 223-237, July.
- Jelke J. Hoorn, 2018. "The Current state of bounds on benchmark instances of the job-shop scheduling problem," Journal of Scheduling, Springer, vol. 21(1), pages 127-128, February.
- M. Selim Akturk & Jay B. Ghosh & Evrim D. Gunes, 2003. "Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(1), pages 15-30, February.
- Kim, Yeong-Dae & Lim, Hyeong-Gyu & Park, Moon-Won, 1996. "Search heuristics for a flowshop scheduling problem in a printed circuit board assembly process," European Journal of Operational Research, Elsevier, vol. 91(1), pages 124-143, May.
- Reinhard Bürgy & Heinz Gröflin, 2013. "Optimal job insertion in the no-wait job shop," Journal of Combinatorial Optimization, Springer, vol. 26(2), pages 345-371, August.
- Kolisch, Rainer, 1996. "Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation," European Journal of Operational Research, Elsevier, vol. 90(2), pages 320-333, April.
- Kolisch, Rainer & Sprecher, Arno, 1996. "PSPLIB - a project scheduling problem library," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 396, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Zapfel, Gunther & Wasner, Michael, 2006. "Warehouse sequencing in the steel supply chain as a generalized job shop model," International Journal of Production Economics, Elsevier, vol. 104(2), pages 482-501, December.
- Egon Balas & Alkis Vazacopoulos, 1998. "Guided Local Search with Shifting Bottleneck for Job Shop Scheduling," Management Science, INFORMS, vol. 44(2), pages 262-275, February.
- Guiliang Gong & Raymond Chiong & Qianwang Deng & Qiang Luo, 2020. "A memetic algorithm for multi-objective distributed production scheduling: minimizing the makespan and total energy consumption," Journal of Intelligent Manufacturing, Springer, vol. 31(6), pages 1443-1466, August.
- Guang Feng & Hoong Lau, 2008. "Efficient algorithms for machine scheduling problems with earliness and tardiness penalties," Annals of Operations Research, Springer, vol. 159(1), pages 83-95, March.