An efficient genetic algorithm for job shop scheduling with tardiness objectives
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- He, Zesheng & Yang, Taeyong & Tiger, Andy, 1996. "An exchange heuristic imbedded with simulated annealing for due-dates job-shop scheduling," European Journal of Operational Research, Elsevier, vol. 91(1), pages 99-117, May.
- Blazewicz, Jacek & Domschke, Wolfgang & Pesch, Erwin, 1996. "The job shop scheduling problem: Conventional and new solution techniques," European Journal of Operational Research, Elsevier, vol. 93(1), pages 1-33, August.
- Robert H. Storer & S. David Wu & Renzo Vaccari, 1992. "New Search Spaces for Sequencing Problems with Application to Job Shop Scheduling," Management Science, INFORMS, vol. 38(10), pages 1495-1509, October.
- Joseph Adams & Egon Balas & Daniel Zawack, 1988. "The Shifting Bottleneck Procedure for Job Shop Scheduling," Management Science, INFORMS, vol. 34(3), pages 391-401, March.
- Ari P. J. Vepsalainen & Thomas E. Morton, 1987. "Priority Rules for Job Shops with Weighted Tardiness Costs," Management Science, INFORMS, vol. 33(8), pages 1035-1047, August.
- Raman, N. & Brian Talbot, F., 1993. "The job shop tardiness problem: A decomposition approach," European Journal of Operational Research, Elsevier, vol. 69(2), pages 187-199, September.
- James, R. J. W. & Buchanan, J. T., 1998. "Performance enhancements to tabu search for the early/tardy scheduling problem," European Journal of Operational Research, Elsevier, vol. 106(2-3), pages 254-265, April.
- Valls, Vicente & Angeles Perez, M. & Sacramento Quintanilla, M., 1998. "A tabu search approach to machine scheduling," European Journal of Operational Research, Elsevier, vol. 106(2-3), pages 277-300, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- K A H Kobbacy & S Vadera & M H Rasmy, 2007. "AI and OR in management of operations: history and trends," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(1), pages 10-28, January.
- Geiger, Martin Josef, 2007. "On operators and search space topology in multi-objective flow shop scheduling," European Journal of Operational Research, Elsevier, vol. 181(1), pages 195-206, August.
- Julia Rieck & Jürgen Zimmermann & Matthias Glagow, 2007. "Tourenplanung mittelständischer Speditionsunternehmen in Stückgutkooperationen: Modellierung und heuristische Lösungsverfahren," Metrika: International Journal for Theoretical and Applied Statistics, Springer, vol. 17(4), pages 365-388, January.
- Mati, Yazid & Dauzère-Pérès, Stèphane & Lahlou, Chams, 2011. "A general approach for optimizing regular criteria in the job-shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 212(1), pages 33-42, July.
- Bierwirth, C. & Kuhpfahl, J., 2017. "Extended GRASP for the job shop scheduling problem with total weighted tardiness objective," European Journal of Operational Research, Elsevier, vol. 261(3), pages 835-848.
- Zhou, Hong & Cheung, Waiman & Leung, Lawrence C., 2009. "Minimizing weighted tardiness of job-shop scheduling using a hybrid genetic algorithm," European Journal of Operational Research, Elsevier, vol. 194(3), pages 637-649, May.
- Hong-Sen Yan & Wen-Chao Li, 2017. "A multi-objective scheduling algorithm with self-evolutionary feature for job-shop-like knowledgeable manufacturing cell," Journal of Intelligent Manufacturing, Springer, vol. 28(2), pages 337-351, February.
- Mok, P.Y. & Kwong, C.K. & Wong, W.K., 2007. "Optimisation of fault-tolerant fabric-cutting schedules using genetic algorithms and fuzzy set theory," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1876-1893, March.
- Deming Lei & Youlian Zheng & Xiuping Guo, 2017. "A shuffled frog-leaping algorithm for flexible job shop scheduling with the consideration of energy consumption," International Journal of Production Research, Taylor & Francis Journals, vol. 55(11), pages 3126-3140, June.
- El-Bouri, A. & Azizi, N. & Zolfaghari, S., 2007. "A comparative study of a new heuristic based on adaptive memory programming and simulated annealing: The case of job shop scheduling," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1894-1910, March.
- Chiang, Tsung-Che & Fu, Li-Chen, 2009. "Using a family of critical ratio-based approaches to minimize the number of tardy jobs in the job shop with sequence dependent setup times," European Journal of Operational Research, Elsevier, vol. 196(1), pages 78-92, July.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Sels, Veronique & Craeymeersch, Kjeld & Vanhoucke, Mario, 2011.
"A hybrid single and dual population search procedure for the job shop scheduling problem,"
European Journal of Operational Research, Elsevier, vol. 215(3), pages 512-523, December.
- V. Sels & K. Craeymeersch & M. Vanhoucke, 2010. "A hybrid single and dual population search procedure for the job shop scheduling problem," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 10/679, Ghent University, Faculty of Economics and Business Administration.
- Bierwirth, C. & Kuhpfahl, J., 2017. "Extended GRASP for the job shop scheduling problem with total weighted tardiness objective," European Journal of Operational Research, Elsevier, vol. 261(3), pages 835-848.
- Amaral Armentano, Vinicius & Rigao Scrich, Cintia, 2000. "Tabu search for minimizing total tardiness in a job shop," International Journal of Production Economics, Elsevier, vol. 63(2), pages 131-140, January.
- Ganesan, Viswanath Kumar & Sivakumar, Appa Iyer, 2006. "Scheduling in static jobshops for minimizing mean flowtime subject to minimum total deviation of job completion times," International Journal of Production Economics, Elsevier, vol. 103(2), pages 633-647, October.
- Fowler, John W. & Mönch, Lars, 2022. "A survey of scheduling with parallel batch (p-batch) processing," European Journal of Operational Research, Elsevier, vol. 298(1), pages 1-24.
- Jain, A. S. & Meeran, S., 1999. "Deterministic job-shop scheduling: Past, present and future," European Journal of Operational Research, Elsevier, vol. 113(2), pages 390-434, March.
- Guinet, Alain & Legrand, Marie, 1998. "Reduction of job-shop problems to flow-shop problems with precedence constraints," European Journal of Operational Research, Elsevier, vol. 109(1), pages 96-110, August.
- Raúl Mencía & Carlos Mencía, 2021. "One-Machine Scheduling with Time-Dependent Capacity via Efficient Memetic Algorithms," Mathematics, MDPI, vol. 9(23), pages 1-24, November.
- Ricardo Pérez-Rodríguez, 2024. "A Radial Memetic Algorithm to Resolve the No-Wait Job-Shop Scheduling Problem," Mathematics, MDPI, vol. 12(21), pages 1-15, October.
- Michael Pinedo & Marcos Singer, 1999. "A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(1), pages 1-17, February.
- Christoph Schuster, 2006. "No-wait Job Shop Scheduling: Tabu Search and Complexity of Subproblems," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 63(3), pages 473-491, July.
- F. Guerriero, 2008. "Hybrid Rollout Approaches for the Job Shop Scheduling Problem," Journal of Optimization Theory and Applications, Springer, vol. 139(2), pages 419-438, November.
- Zapfel, G. & Wasner, M., 2000. "A heuristic solution concept for a generalized machine sequencing problem with an application to radiator manufacturing," International Journal of Production Economics, Elsevier, vol. 68(2), pages 199-213, November.
- Ouenniche, J. & Bertrand, J. W. M., 2001. "The finite horizon economic lot sizing problem in job shops: : the multiple cycle approach," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 49-61, December.
- Francis Sourd & Wim Nuijten, 2000. "Multiple-Machine Lower Bounds for Shop-Scheduling Problems," INFORMS Journal on Computing, INFORMS, vol. 12(4), pages 341-352, November.
- Hosseini, Amir & Otto, Alena & Pesch, Erwin, 2024. "Scheduling in manufacturing with transportation: Classification and solution techniques," European Journal of Operational Research, Elsevier, vol. 315(3), pages 821-843.
- Yabo Luo, 2017. "Nested optimization method combining complex method and ant colony optimization to solve JSSP with complex associated processes," Journal of Intelligent Manufacturing, Springer, vol. 28(8), pages 1801-1815, December.
- Joao António Noivo & Helena Ramalhinho-Lourenço, 1998. "Solving two production scheduling problems with sequence-dependent set-up times," Economics Working Papers 338, Department of Economics and Business, Universitat Pompeu Fabra.
- Mariano Frutos & Ana Olivera & Fernando Tohmé, 2010. "A memetic algorithm based on a NSGAII scheme for the flexible job-shop scheduling problem," Annals of Operations Research, Springer, vol. 181(1), pages 745-765, December.
- Müller, David & Müller, Marcus G. & Kress, Dominik & Pesch, Erwin, 2022. "An algorithm selection approach for the flexible job shop scheduling problem: Choosing constraint programming solvers through machine learning," European Journal of Operational Research, Elsevier, vol. 302(3), pages 874-891.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:155:y:2004:i:3:p:616-630. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.