Detection and In-Depth Analysis of Causes of Delay in Construction Projects: Synergy between Machine Learning and Expert Knowledge
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Zaher Mundher Yaseen & Zainab Hasan Ali & Sinan Q. Salih & Nadhir Al-Ansari, 2020. "Prediction of Risk Delay in Construction Projects Using a Hybrid Artificial Intelligence Model," Sustainability, MDPI, vol. 12(4), pages 1-14, February.
- Taleb, Nassim Nicholas, 2007. "Black Swans and the Domains of Statistics," The American Statistician, American Statistical Association, vol. 61, pages 198-200, August.
- Peter Kaming & Paul Olomolaiye & Gary Holt & Frank Harris, 1997. "Factors influencing construction time and cost overruns on high-rise projects in Indonesia," Construction Management and Economics, Taylor & Francis Journals, vol. 15(1), pages 83-94.
- Edwin Thomas Banobi & Wooyong Jung, 2019. "Causes and Mitigation Strategies of Delay in Power Construction Projects: Gaps between Owners and Contractors in Successful and Unsuccessful Projects," Sustainability, MDPI, vol. 11(21), pages 1-16, October.
- Paul Parsons & Kamran Sedig, 2014. "Adjustable properties of visual representations: Improving the quality of human-information interaction," Journal of the Association for Information Science & Technology, Association for Information Science & Technology, vol. 65(3), pages 455-482, March.
- Su Jin Choi & So Won Choi & Jong Hyun Kim & Eul-Bum Lee, 2021. "AI and Text-Mining Applications for Analyzing Contractor’s Risk in Invitation to Bid (ITB) and Contracts for Engineering Procurement and Construction (EPC) Projects," Energies, MDPI, vol. 14(15), pages 1-28, July.
- Nikolić, Ana & Roumboutsos, Athena & Stanković, Jelena Ćirilović & Mladenović, Goran, 2020. "Has the latest global financial crisis changed the way road public-private partnerships are funded? A comparison of Europe and Latin America," Utilities Policy, Elsevier, vol. 64(C).
- Alessandra Montenegro & Marina Dobrota & Marija Todorovic & Teodora Slavinski & Vladimir Obradovic, 2021. "Impact of Construction Project Managers’ Emotional Intelligence on Project Success," Sustainability, MDPI, vol. 13(19), pages 1-18, September.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Al-Bataineh Fuad & Khatatbeh Ahmed Ali & Alzubi Yazan, 2024. "Unsupervised machine learning for identifying key risk factors contributing to construction delays," Organization, Technology and Management in Construction, Sciendo, vol. 16(1), pages 170-185.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Carlos Araújo-Rey & Miguel A. Sebastián, 2021. "An Approach to the Analysis of Causes of Delays in Industrial Construction Projects through Planning and Statistical Computing," Sustainability, MDPI, vol. 13(7), pages 1-21, April.
- Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2018. "Delay Factors in Reconstruction Projects: A Case Study of Mataf Expansion Project," Sustainability, MDPI, vol. 10(12), pages 1-18, December.
- Parrini, Alessandro, 2013. "Importance Sampling for Portfolio Credit Risk in Factor Copula Models," MPRA Paper 103745, University Library of Munich, Germany.
- Child, K. & Desta, G. & Douthwaite, B. & Haileslassie, Amare & van Rooyen, A. & Tamene, L. & Uhlenbrook, Stefan, 2021. "Impact tracking: a practitioner-developed approach to scaling agricultural innovation in Ethiopia," IWMI Books, Reports H050789, International Water Management Institute.
- Flyvbjerg, Bent & Ansar, Atif & Budzier, Alexander & Buhl, Søren & Cantarelli, Chantal & Garbuio, Massimo & Glenting, Carsten & Holm, Mette Skamris & Lovallo, Dan & Molin, Eric & Rønnest, Arne & Stewa, 2019. "On de-bunking “Fake News” in the post-truth era: How to reduce statistical error in research," Transportation Research Part A: Policy and Practice, Elsevier, vol. 126(C), pages 409-411.
- Ivan Faiella & Luciano Lavecchia, 2012. "Costs and benefits of relaunching nuclear energy in Italy," Questioni di Economia e Finanza (Occasional Papers) 114, Bank of Italy, Economic Research and International Relations Area.
- Gallus, Jana & Bhatia, Sudeep, 2020. "Gender, power and emotions in the collaborative production of knowledge: A large-scale analysis of Wikipedia editor conversations," Organizational Behavior and Human Decision Processes, Elsevier, vol. 160(C), pages 115-130.
- Derbyshire, James, 2017. "Potential surprise theory as a theoretical foundation for scenario planning," Technological Forecasting and Social Change, Elsevier, vol. 124(C), pages 77-87.
- Usman Ismaila & Wooyong Jung & Chan Young Park, 2022. "Delay Causes and Types in Nigerian Power Construction Projects," Energies, MDPI, vol. 15(3), pages 1-16, January.
- Sheaves, Marcus & Brookes, Justin & Coles, Rob & Freckelton, Marnie & Groves, Paul & Johnston, Ross & Winberg, Pia, 2014. "Repair and revitalisation of Australia׳s tropical estuaries and coastal wetlands: Opportunities and constraints for the reinstatement of lost function and productivity," Marine Policy, Elsevier, vol. 47(C), pages 23-38.
- Cerqueti, Roy & Ciciretti, Rocco & Dalò, Ambrogio & Nicolosi, Marco, 2022.
"A new measure of the resilience for networks of funds with applications to socially responsible investments,"
Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 593(C).
- Roy Cerqueti & R. Ciciretti A. Dalo, M. Nicolosi, 2022. "A new measure of the resilience for networks of funds with applications to socially responsible investments," Post-Print hal-03789131, HAL.
- Hendry, David F. & Mizon, Grayham E., 2014.
"Unpredictability in economic analysis, econometric modeling and forecasting,"
Journal of Econometrics, Elsevier, vol. 182(1), pages 186-195.
- David Hendry, 2011. "Unpredictability in Economic Analyis, Econometric Modelling and Forecasting," Economics Series Working Papers 551, University of Oxford, Department of Economics.
- David F. Hendry & Grayham E. Mizon, 2013. "Unpredictability in Economic Analysis, Econometric Modeling and Forecasting," Economics Papers 2013-W04, Economics Group, Nuffield College, University of Oxford.
- Albena Björck, 2016. "Crisis Typologies Revisited: An Interdisciplinary Approach," Central European Business Review, Prague University of Economics and Business, vol. 2016(3), pages 25-37.
- Jerry Courvisanos & Ameeta Jain & Karim K. Mardaneh, 2016. "Economic Resilience of Regions under Crises: A Study of the Australian Economy," Regional Studies, Taylor & Francis Journals, vol. 50(4), pages 629-643, April.
- Julio E. Sandubete & León Beleña & Juan Carlos García-Villalobos, 2023. "Testing the Efficient Market Hypothesis and the Model-Data Paradox of Chaos on Top Currencies from the Foreign Exchange Market (FOREX)," Mathematics, MDPI, vol. 11(2), pages 1-29, January.
- Ahmed Farouk Kineber & Shah Siddharth & Nicholas Chileshe & Badr Alsolami & Mohammed Magdy Hamed, 2022. "Addressing of Value Management Implementation Barriers within the Indian Construction Industry: A PLS-SEM Approach," Sustainability, MDPI, vol. 14(24), pages 1-24, December.
- Ke Wang & Ziyi Ying & Shankha Shubhra Goswami & Yongsheng Yin & Yafei Zhao, 2023. "Investigating the Role of Artificial Intelligence Technologies in the Construction Industry Using a Delphi-ANP-TOPSIS Hybrid MCDM Concept under a Fuzzy Environment," Sustainability, MDPI, vol. 15(15), pages 1-42, August.
- Luukka, Pasi & Collan, Mikael, 2015. "New fuzzy insurance pricing method for giga-investment project insurance," Insurance: Mathematics and Economics, Elsevier, vol. 65(C), pages 22-29.
- Nassim Nicholas Taleb & Rupert Read & Raphaël Douady & Joseph Norman & Yaneer Bar-Yam, 2014.
"The Precautionary Principle (with Application to the Genetic Modification of Organisms),"
Université Paris1 Panthéon-Sorbonne (Post-Print and Working Papers)
hal-01479405, HAL.
- Nassim Nicholas Taleb & Rupert Read & Raphaël Douady & Joseph Norman & Yaneer Bar-Yam, 2014. "The Precautionary Principle (with Application to the Genetic Modification of Organisms)," Working Papers hal-01479405, HAL.
- Nassim Nicholas Taleb & Rupert Read & Raphael Douady & Joseph Norman & Yaneer Bar-Yam, 2014. "The Precautionary Principle (with Application to the Genetic Modification of Organisms)," Papers 1410.5787, arXiv.org.
- Taleb, Nassim Nicholas, 2009. "Errors, robustness, and the fourth quadrant," International Journal of Forecasting, Elsevier, vol. 25(4), pages 744-759, October.
More about this item
Keywords
causes of delay; machine learning; transformers; bias; Spearman rank correlation; construction projects;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:14:y:2022:i:22:p:14927-:d:969890. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.