Factors influencing construction time and cost overruns on high-rise projects in Indonesia
Author
Abstract
Suggested Citation
DOI: 10.1080/014461997373132
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Patricia M. Hillebrandt, 1985. "Economic Theory and the Construction Industry," Palgrave Macmillan Books, Palgrave Macmillan, edition 0, number 978-1-349-17934-3, December.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Daeyoun Won & Bon‐Gang Hwang & Soo Jing Chng, 2021. "Assessing the effects of workforce diversity on project productivity performance for sustainable workplace in the construction industry," Sustainable Development, John Wiley & Sons, Ltd., vol. 29(2), pages 398-418, March.
- Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2018. "Delay Factors in Reconstruction Projects: A Case Study of Mataf Expansion Project," Sustainability, MDPI, vol. 10(12), pages 1-18, December.
- Swee Lean Chan & Moonseo Park, 2005. "Project cost estimation using principal component regression," Construction Management and Economics, Taylor & Francis Journals, vol. 23(3), pages 295-304.
- Moschouli, Eleni & Soecipto, Raden Murwantara & Vanelslander, Thierry, 2019. "Cost performance of transport infrastructure projects before and after the global financial crisis (GFC): Are differences observed in the conditions of project performance?," Research in Transportation Economics, Elsevier, vol. 75(C), pages 21-35.
- Manamba EPAPHRA, 2016. "Foreign Direct Investment and Sectoral Performance in Tanzania," Journal of Economics and Political Economy, KSP Journals, vol. 3(4), pages 670-719, December.
- Miranda Sarmento, J.J. & Renneboog, Luc, 2017. "Cost overruns in public sector investment projects," Other publications TiSEM 51799a3e-4c78-4dbd-b330-b, Tilburg University, School of Economics and Management.
- Arviga Bigwanto & Naniek Widayati & Mochamad Agung Wibowo & Endah Murtiana Sari, 2024. "Lean Construction: A Sustainability Operation for Government Projects," Sustainability, MDPI, vol. 16(8), pages 1-16, April.
- Sou-Sen Leu & Cheng-Yu Lu & Pei-Lin Wu, 2023. "Dynamic-Bayesian-Network-Based Project Cost Overrun Prediction Model," Sustainability, MDPI, vol. 15(5), pages 1-14, March.
- Nur Fatin Syazwani Abu Bakar* & Syuhaida Ismail & Rohayah Che Amat & Serdar Durdyev, 2018. "Sustainable Construction in Malaysian Mixed Development Projects: The Barriers and Critical Success Factors," The Journal of Social Sciences Research, Academic Research Publishing Group, pages 885-892:6.
- Giuliano Marella & Valentina Antoniucci, 2019. "Time Overrun in Public Works—Evidence from North-East Italy," Sustainability, MDPI, vol. 11(24), pages 1-17, December.
- Mehmet Tolga Taner, 2013. "Critical Success Factors for Six Sigma Implementation in Large-scale Turkish Construction Companies," International Review of Management and Marketing, Econjournals, vol. 3(4), pages 212-225.
- Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2019. "Materials Challenges in Reconstruction of Historical Projects: A Case Study of the Old Riwaq Project," Sustainability, MDPI, vol. 11(17), pages 1-19, August.
- Marija Z. Ivanović & Đorđe Nedeljković & Zoran Stojadinović & Dejan Marinković & Nenad Ivanišević & Nevena Simić, 2022. "Detection and In-Depth Analysis of Causes of Delay in Construction Projects: Synergy between Machine Learning and Expert Knowledge," Sustainability, MDPI, vol. 14(22), pages 1-23, November.
- Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2020. "Delay Factors Management and Ranking for Reconstruction and Rehabilitation Projects Based on the Relative Importance Index (RII)," Sustainability, MDPI, vol. 12(15), pages 1-21, July.
- Myung-Hun Kim & Eul-Bum Lee, 2019. "A Forecast Model for the Level of Engineering Maturity Impact on Contractor’s Procurement and Construction Costs for Offshore EPC Megaprojects," Energies, MDPI, vol. 12(12), pages 1-18, June.
- Goutom K. Pall & Adrian J. Bridge & Jason Gray & Martin Skitmore, 2019. "Causes of Delay in Power Transmission Projects: An Empirical Study," Energies, MDPI, vol. 13(1), pages 1-29, December.
- Bajomo, Mary & Ogbeyemi, Akinola & Zhang, Wenjun, 2022. "A systems dynamics approach to the management of material procurement for Engineering, Procurement and Construction industry," International Journal of Production Economics, Elsevier, vol. 244(C).
- Miranda Sarmento, J.J., 2014. "Public private partnerships," Other publications TiSEM c7d4c978-234c-4f88-83ed-1, Tilburg University, School of Economics and Management.
- Kiran Khurshid & Aamar Danish & Muhammad Usama Salim & Muhammed Bayram & Togay Ozbakkaloglu & Mohammad Ali Mosaberpanah, 2023. "An In-Depth Survey Demystifying the Internet of Things (IoT) in the Construction Industry: Unfolding New Dimensions," Sustainability, MDPI, vol. 15(2), pages 1-24, January.
- Oke Ayodeji Emmanuel, 2016. "Effect of bond administration on construction project delivery," Organization, Technology and Management in Construction, Sciendo, vol. 8(1), pages 1390-1396, December.
- Lerche, J. & Lorentzen, S. & Enevoldsen, P. & Neve, H.H., 2022. "The impact of COVID -19 on offshore wind project productivity – A case study," Renewable and Sustainable Energy Reviews, Elsevier, vol. 158(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Wesam Salah Alaloul & Muhammad Ali Musarat & Muhammad Babar Ali Rabbani & Qaiser Iqbal & Ahsen Maqsoom & Waqas Farooq, 2021. "Construction Sector Contribution to Economic Stability: Malaysian GDP Distribution," Sustainability, MDPI, vol. 13(9), pages 1-26, April.
- Derek Drew & Martin Skitmore, 1997. "The effect of contract type and size on competitiveness in bidding," Construction Management and Economics, Taylor & Francis Journals, vol. 15(5), pages 469-489.
- Raymond Y.C. Tse & John Raftery, 2001. "The effects of money supply on construction flows," Construction Management and Economics, Taylor & Francis Journals, vol. 19(1), pages 9-17, January.
- Heinz Herrmann, 2019. "How to Increase Profits Through Predictive Analytics When Only Few Competitors’ Bids Are Known," FIIB Business Review, , vol. 8(1), pages 61-76, March.
- Jimoh Richard Ajayi & Oyewobi Luqman Oyekunle & Adamu Amina Nna & Bajere Paul Abayomi, 2016. "Women professionals’ participation in the nigerian construction industry: finding voice for the voiceless," Organization, Technology and Management in Construction, Sciendo, vol. 8(1), pages 1429-1436, December.
- Steve Rowlinson, 2007. "The temporal nature of forces acting on innovative IT in major construction projects," Construction Management and Economics, Taylor & Francis Journals, vol. 25(3), pages 227-238.
- Heng Li & Peter Love, 1999. "Combining rule-based expert systems and artificial neural networks for mark-up estimation," Construction Management and Economics, Taylor & Francis Journals, vol. 17(2), pages 169-176.
- Swee-Lean Chan, 2002. "Responses of selected economic indicators to construction output shocks: the case of Singapore," Construction Management and Economics, Taylor & Francis Journals, vol. 20(6), pages 523-533.
- Shahriar, Shawon Muhammad & Alam, Md. Mahmudul & Said, Jamaliah & Monzur-E-Elahi, Mohammad, 2019. "Waqf as a Tool for Rendering Social Welfare Services in the Social Entrepreneurship Context," SocArXiv 8bfjy, Center for Open Science.
More about this item
Keywords
Delays; Cost Overruns; Productivity; High-rise; Indonesia;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:15:y:1997:i:1:p:83-94. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.