Unsupervised machine learning for identifying key risk factors contributing to construction delays

Author

Listed:
  • Al-Bataineh Fuad

    (Department of Civil Engineering, Faculty of Engineering, Al-al Bayt University, Mafraq, Jordan)

  • Khatatbeh Ahmed Ali

    (Department of Civil Engineering, Faculty of Engineering, Al-al Bayt University, Mafraq, Jordan)

  • Alzubi Yazan

    (Department of Civil Engineering, Faculty of Engineering Technology, Al-Balqa Applied University, Amman, Jordan)

Abstract

The present study uses unsupervised machine learning capabilities with an emphasis on K-means clustering for addressing the problem of construction delays. The primary objective is to investigate the critical risk factors that contribute to such delays, thereby enabling more efficient risk-management strategies. The study employs a large dataset compiled from contracting firms operating in developing regions. This information is a vital resource for identifying crucial risk variables. These variables are analysed and categorised using the Likert scale into five levels based on their potential influence. This systematic approach permits the development of a comprehensive understanding of the relevant factors. These risk factors are grouped to enhance comprehension of the intricate risk landscape using K-means clustering. This allows for a broader, more comprehensive understanding of the factors contributing to construction delays. The application of K-means clustering demonstrates the potential of machine learning techniques to improve conventional approaches to risk management. This empirical investigation significantly expands the existing body of construction risk-management knowledge. It offers invaluable insights into various project stakeholders, allowing for more informed decision-making. Notably, the clustering analysis results provide a practical, user-friendly tool. This tool can assist project managers in enhancing their risk foresight, drafting more effective plans and developing robust mitigation strategies. Consequently, this research offers the potential for substantial improvements in project timeline adherence, thereby substantially reducing the impact of construction delays in developing nations.

Suggested Citation

  • Al-Bataineh Fuad & Khatatbeh Ahmed Ali & Alzubi Yazan, 2024. "Unsupervised machine learning for identifying key risk factors contributing to construction delays," Organization, Technology and Management in Construction, Sciendo, vol. 16(1), pages 170-185.
  • Handle: RePEc:vrs:otamic:v:16:y:2024:i:1:p:170-185:n:1014
    DOI: 10.2478/otmcj-2024-0014
    as

    Download full text from publisher

    File URL: https://doi.org/10.2478/otmcj-2024-0014
    Download Restriction: no

    File URL: https://libkey.io/10.2478/otmcj-2024-0014?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:vrs:otamic:v:16:y:2024:i:1:p:170-185:n:1014. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Peter Golla (email available below). General contact details of provider: https://www.sciendo.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.