IDEAS home Printed from https://ideas.repec.org/a/eee/reensy/v215y2021ics0951832021004117.html
   My bibliography  Save this article

Synchronized optimization of EMU train assignment and second-level preventive maintenance scheduling

Author

Listed:
  • Lin, Boliang
  • Zhao, Yinan

Abstract

This paper addresses the synchronized electric multiple unit (EMU) train assignment and maintenance scheduling problem for a weekly planning period. To guarantee the safe operation of railways, the focus of this study is to coordinate the maintenance plans of all the EMU trains with a given fleet size, so as to make trains available to meet operational requirements. A 0 and 1 programming model is proposed to mathematically describe the problem. The objective is to minimize the mileage losses of all EMU trains by considering the train operational requirements and depot capacity restrictions. An important feature distinguishing this model from existing literature is that it is able to handle multi-day maintenance packet scenarios. To make the model computationally manageable, we apply various linearization techniques to refine the model into a linear one. A real-world case is considered to demonstrate the proposed solution approach, which indicates that the model can be solved to the optimum within a very short computational time using a state-of-the-art optimization solver.

Suggested Citation

  • Lin, Boliang & Zhao, Yinan, 2021. "Synchronized optimization of EMU train assignment and second-level preventive maintenance scheduling," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
  • Handle: RePEc:eee:reensy:v:215:y:2021:i:c:s0951832021004117
    DOI: 10.1016/j.ress.2021.107893
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0951832021004117
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ress.2021.107893?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Lusby, Richard M. & Haahr, Jørgen Thorlund & Larsen, Jesper & Pisinger, David, 2017. "A Branch-and-Price algorithm for railway rolling stock rescheduling," Transportation Research Part B: Methodological, Elsevier, vol. 99(C), pages 228-250.
    2. Zhong, Qingwei & Lusby, Richard M. & Larsen, Jesper & Zhang, Yongxiang & Peng, Qiyuan, 2019. "Rolling stock scheduling with maintenance requirements at the Chinese High-Speed Railway," Transportation Research Part B: Methodological, Elsevier, vol. 126(C), pages 24-44.
    3. Lin, Boliang & Wu, Jianping & Lin, Ruixi & Wang, Jiaxi & Wang, Hui & Zhang, Xuhui, 2019. "Optimization of high-level preventive maintenance scheduling for high-speed trains," Reliability Engineering and System Safety, Elsevier, vol. 183(C), pages 261-275.
    4. Zhou, Jian-Lan & Lei, Yi, 2020. "A slim integrated with empirical study and network analysis for human error assessment in the railway driving process," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
    5. Arianna Alfieri & Rutger Groot & Leo Kroon & Alexander Schrijver, 2006. "Efficient Circulation of Railway Rolling Stock," Transportation Science, INFORMS, vol. 40(3), pages 378-391, August.
    6. Go, Hun & Kim, Ji-Su & Lee, Dong-Ho, 2013. "Operation and preventive maintenance scheduling for containerships: Mathematical model and solution algorithm," European Journal of Operational Research, Elsevier, vol. 229(3), pages 626-636.
    7. Poppe, Joeri & Basten, Rob J.I. & Boute, Robert N. & Lambrecht, Marc R., 2017. "Numerical study of inventory management under various maintenance policies," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 262-273.
    8. Moudani, Walid El & Mora-Camino, Félix, 2000. "A dynamic approach for aircraft assignment and maintenance scheduling by airlines," Journal of Air Transport Management, Elsevier, vol. 6(4), pages 233-237.
    9. Cavalcante, Cristiano A.V. & Lopes, Rodrigo S. & Scarf, Philip A., 2021. "Inspection and replacement policy with a fixed periodic schedule," Reliability Engineering and System Safety, Elsevier, vol. 208(C).
    10. Zio, Enrico & Compare, Michele, 2013. "Evaluating maintenance policies by quantitative modeling and analysis," Reliability Engineering and System Safety, Elsevier, vol. 109(C), pages 53-65.
    11. Jian Li & Boliang Lin & Zhongkai Wang & Lei Chen & Jiaxi Wang, 2016. "A Pragmatic Optimization Method for Motor Train Set Assignment and Maintenance Scheduling Problem," Discrete Dynamics in Nature and Society, Hindawi, vol. 2016, pages 1-13, March.
    12. Park, Minjae & Jung, Ki Mun & Park, Dong Ho, 2018. "Optimization of periodic preventive maintenance policy following the expiration of two-dimensional warranty," Reliability Engineering and System Safety, Elsevier, vol. 170(C), pages 1-9.
    13. Hong, Sung-Pil & Kim, Kyung Min & Lee, Kyungsik & Hwan Park, Bum, 2009. "A pragmatic algorithm for the train-set routing: The case of Korea high-speed railway," Omega, Elsevier, vol. 37(3), pages 637-645, June.
    14. Zhang, Yongxiang & D'Ariano, Andrea & He, Bisheng & Peng, Qiyuan, 2019. "Microscopic optimization model and algorithm for integrating train timetabling and track maintenance task scheduling," Transportation Research Part B: Methodological, Elsevier, vol. 127(C), pages 237-278.
    15. Sherali, Hanif D. & Bish, Ebru K. & Zhu, Xiaomei, 2006. "Airline fleet assignment concepts, models, and algorithms," European Journal of Operational Research, Elsevier, vol. 172(1), pages 1-30, July.
    16. Ralf Borndörfer & Markus Reuther & Thomas Schlechte & Kerstin Waas & Steffen Weider, 2016. "Integrated Optimization of Rolling Stock Rotations for Intercity Railways," Transportation Science, INFORMS, vol. 50(3), pages 863-877, August.
    17. Fioole, Pieter-Jan & Kroon, Leo & Maroti, Gabor & Schrijver, Alexander, 2006. "A rolling stock circulation model for combining and splitting of passenger trains," European Journal of Operational Research, Elsevier, vol. 174(2), pages 1281-1297, October.
    18. Ziarati, Koorush & Soumis, Francois & Desrosiers, Jacques & Gelinas, Sylvie & Saintonge, Andre, 1997. "Locomotive assignment with heterogeneous consists at CN North America," European Journal of Operational Research, Elsevier, vol. 97(2), pages 281-292, March.
    19. Lingaya, Norbert & Cordeau, Jean-Françcois & Desaulniers, Guy & Desrosiers, Jacques & Soumis, Françcois, 2002. "Operational car assignment at VIA Rail Canada," Transportation Research Part B: Methodological, Elsevier, vol. 36(9), pages 755-778, November.
    20. Erwin Abbink & Bianca van den Berg & Leo Kroon & Marc Salomon, 2004. "Allocation of Railway Rolling Stock for Passenger Trains," Transportation Science, INFORMS, vol. 38(1), pages 33-41, February.
    21. Read, G.J.M. & Naweed, A. & Salmon, P.M., 2019. "Complexity on the rails: A systems-based approach to understanding safety management in rail transport," Reliability Engineering and System Safety, Elsevier, vol. 188(C), pages 352-365.
    22. Deris, Safaai & Omatu, Sigeru & Ohta, Hiroshi & Shaharudin Kutar, Lt. Cdr & Abd Samat, Pathiah, 1999. "Ship maintenance scheduling by genetic algorithm and constraint-based reasoning," European Journal of Operational Research, Elsevier, vol. 112(3), pages 489-502, February.
    23. Liu, Jintao & Schmid, Felix & Zheng, Wei & Zhu, Jiebei, 2019. "Understanding railway operational accidents using network theory," Reliability Engineering and System Safety, Elsevier, vol. 189(C), pages 218-231.
    24. Jean-François Cordeau & François Soumis & Jacques Desrosiers, 2001. "Simultaneous Assignment of Locomotives and Cars to Passenger Trains," Operations Research, INFORMS, vol. 49(4), pages 531-548, August.
    25. Gao, Yicong & Feng, Yixiong & Zhang, Zixian & Tan, Jianrong, 2015. "An optimal dynamic interval preventive maintenance scheduling for series systems," Reliability Engineering and System Safety, Elsevier, vol. 142(C), pages 19-30.
    26. Alice Consilvio & Angela Febbraro & Rossella Meo & Nicola Sacco, 2019. "Risk-based optimal scheduling of maintenance activities in a railway network," EURO Journal on Transportation and Logistics, Springer;EURO - The Association of European Operational Research Societies, vol. 8(5), pages 435-465, December.
    27. Yang, Li & Ma, Xiaobing & Peng, Rui & Zhai, Qingqing & Zhao, Yu, 2017. "A preventive maintenance policy based on dependent two-stage deterioration and external shocks," Reliability Engineering and System Safety, Elsevier, vol. 160(C), pages 201-211.
    28. Gábor Maróti & Leo Kroon, 2005. "Maintenance Routing for Train Units: The Transition Model," Transportation Science, INFORMS, vol. 39(4), pages 518-525, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Lin, Boliang & Shen, Yaoming & Wang, Zhongkai & Ni, Shaoquan & Zhao, Yinan, 2023. "An iterative improvement approach for high-speed train maintenance scheduling," Transportation Research Part B: Methodological, Elsevier, vol. 173(C), pages 292-312.
    2. Wang, Jiaxi, 2024. "Maintenance scheduling at high-speed train depots: An optimization approach," Reliability Engineering and System Safety, Elsevier, vol. 243(C).
    3. Khaled Alhamad & Yousuf Alkhezi, 2024. "Hybrid Genetic Algorithm and Tabu Search for Solving Preventive Maintenance Scheduling Problem for Cogeneration Plants," Mathematics, MDPI, vol. 12(12), pages 1-26, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Zhong, Qingwei & Lusby, Richard M. & Larsen, Jesper & Zhang, Yongxiang & Peng, Qiyuan, 2019. "Rolling stock scheduling with maintenance requirements at the Chinese High-Speed Railway," Transportation Research Part B: Methodological, Elsevier, vol. 126(C), pages 24-44.
    2. Gao, Yuan & Xia, Jun & D’Ariano, Andrea & Yang, Lixing, 2022. "Weekly rolling stock planning in Chinese high-speed rail networks," Transportation Research Part B: Methodological, Elsevier, vol. 158(C), pages 295-322.
    3. Canca, David & Barrena, Eva, 2018. "The integrated rolling stock circulation and depot location problem in railway rapid transit systems," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 109(C), pages 115-138.
    4. Gao, Yuan & Schmidt, Marie & Yang, Lixing & Gao, Ziyou, 2020. "A branch-and-price approach for trip sequence planning of high-speed train units," Omega, Elsevier, vol. 92(C).
    5. Lusby, Richard M. & Haahr, Jørgen Thorlund & Larsen, Jesper & Pisinger, David, 2017. "A Branch-and-Price algorithm for railway rolling stock rescheduling," Transportation Research Part B: Methodological, Elsevier, vol. 99(C), pages 228-250.
    6. Lin, Boliang & Shen, Yaoming & Wang, Zhongkai & Ni, Shaoquan & Zhao, Yinan, 2023. "An iterative improvement approach for high-speed train maintenance scheduling," Transportation Research Part B: Methodological, Elsevier, vol. 173(C), pages 292-312.
    7. Hoogervorst, R. & Dollevoet, T.A.B. & Maróti, G. & Huisman, D., 2018. "Reducing Passenger Delays by Rolling Stock Rescheduling," Econometric Institute Research Papers EI2018-29, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    8. Yu Zhou & Leishan Zhou & Yun Wang & Zhuo Yang & Jiawei Wu, 2017. "Application of Multiple-Population Genetic Algorithm in Optimizing the Train-Set Circulation Plan Problem," Complexity, Hindawi, vol. 2017, pages 1-14, July.
    9. Lin, Boliang & Wu, Jianping & Lin, Ruixi & Wang, Jiaxi & Wang, Hui & Zhang, Xuhui, 2019. "Optimization of high-level preventive maintenance scheduling for high-speed trains," Reliability Engineering and System Safety, Elsevier, vol. 183(C), pages 261-275.
    10. Yu Zhou & Leishan Zhou & Yun Wang & Xiaomeng Li & Zhuo Yang, 2017. "A practical model for the train-set utilization: The case of Beijing-Tianjin passenger dedicated line in China," PLOS ONE, Public Library of Science, vol. 12(5), pages 1-24, May.
    11. Haahr, J.T. & Wagenaar, J.C. & Veelenturf, L.P. & Kroon, L.G., 2015. "A Comparison of Two Exact Methods for Passenger Railway Rolling Stock (Re)Scheduling," ERIM Report Series Research in Management ERS-2015-007-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    12. Lin, Zhiyuan & Kwan, Raymond S.K., 2016. "A branch-and-price approach for solving the train unit scheduling problem," Transportation Research Part B: Methodological, Elsevier, vol. 94(C), pages 97-120.
    13. Xueqiao Yu & Maoxiang Lang & Wenhui Zhang & Shiqi Li & Mingyue Zhang & Xiao Yu, 2019. "An Empirical Study on the Comprehensive Optimization Method of a Train Diagram of the China High Speed Railway Express," Sustainability, MDPI, vol. 11(7), pages 1-30, April.
    14. Zhiyuan Lin & Raymond S. K. Kwan, 2016. "Local convex hulls for a special class of integer multicommodity flow problems," Computational Optimization and Applications, Springer, vol. 64(3), pages 881-919, July.
    15. Frisch, Sarah & Hungerländer, Philipp & Jellen, Anna & Primas, Bernhard & Steininger, Sebastian & Weinberger, Dominic, 2021. "Solving a real-world Locomotive Scheduling Problem with Maintenance Constraints," Transportation Research Part B: Methodological, Elsevier, vol. 150(C), pages 386-409.
    16. Valentina Cacchiani & Alberto Caprara & Paolo Toth, 2019. "An Effective Peak Period Heuristic for Railway Rolling Stock Planning," Transportation Science, INFORMS, vol. 53(3), pages 746-762, May.
    17. Wang, Entai & Yang, Lixing & Yin, Jiateng & Zhang, Jinlei & Gao, Ziyou, 2024. "Passenger-oriented rolling stock scheduling in the metro system with multiple depots: Network flow based approaches," Transportation Research Part B: Methodological, Elsevier, vol. 180(C).
    18. Yang, Lin & Gao, Yuan & D’Ariano, Andrea & Xu, Suxiu, 2024. "Integrated optimization of train timetable and train unit circulation for a Y-type urban rail transit system with flexible train composition mode," Omega, Elsevier, vol. 122(C).
    19. Wang, Yihui & Zhao, Kangqi & D’Ariano, Andrea & Niu, Ru & Li, Shukai & Luan, Xiaojie, 2021. "Real-time integrated train rescheduling and rolling stock circulation planning for a metro line under disruptions," Transportation Research Part B: Methodological, Elsevier, vol. 152(C), pages 87-117.
    20. Lusby, Richard M. & Larsen, Jesper & Bull, Simon, 2018. "A survey on robustness in railway planning," European Journal of Operational Research, Elsevier, vol. 266(1), pages 1-15.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:reensy:v:215:y:2021:i:c:s0951832021004117. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.journals.elsevier.com/reliability-engineering-and-system-safety .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.