Ship maintenance scheduling by genetic algorithm and constraint-based reasoning
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Klein, Robert & Scholl, Armin, 1996. "Maximizing the production rate in simple assembly line balancing -- A branch and bound procedure," European Journal of Operational Research, Elsevier, vol. 91(2), pages 367-385, June.
- Kralj, Branimir & Petrovic, Radivoj, 1995. "A multiobjective optimization approach to thermal generating units maintenance scheduling," European Journal of Operational Research, Elsevier, vol. 84(2), pages 481-493, July.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Petchrompo, Sanyapong & Parlikad, Ajith Kumar, 2019. "A review of asset management literature on multi-asset systems," Reliability Engineering and System Safety, Elsevier, vol. 181(C), pages 181-201.
- Lin, Boliang & Wu, Jianping & Lin, Ruixi & Wang, Jiaxi & Wang, Hui & Zhang, Xuhui, 2019. "Optimization of high-level preventive maintenance scheduling for high-speed trains," Reliability Engineering and System Safety, Elsevier, vol. 183(C), pages 261-275.
- Ye, Zhisheng & Li, Zhizhong & Xie, Min, 2010. "Some improvements on adaptive genetic algorithms for reliability-related applications," Reliability Engineering and System Safety, Elsevier, vol. 95(2), pages 120-126.
- Gizem Keysan & George L. Nemhauser & Martin W. P. Savelsbergh, 2010. "Tactical and Operational Planning of Scheduled Maintenance for Per-Seat, On-Demand Air Transportation," Transportation Science, INFORMS, vol. 44(3), pages 291-306, August.
- Carnero Moya, M. Carmen, 2004. "The control of the setting up of a predictive maintenance programme using a system of indicators," Omega, Elsevier, vol. 32(1), pages 57-75, February.
- Go, Hun & Kim, Ji-Su & Lee, Dong-Ho, 2013. "Operation and preventive maintenance scheduling for containerships: Mathematical model and solution algorithm," European Journal of Operational Research, Elsevier, vol. 229(3), pages 626-636.
- Lin, Boliang & Zhao, Yinan, 2021. "Synchronized optimization of EMU train assignment and second-level preventive maintenance scheduling," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
- Ramez Kian & Tolga Bektaş & Djamila Ouelhadj, 2019. "Optimal spare parts management for vessel maintenance scheduling," Annals of Operations Research, Springer, vol. 272(1), pages 323-353, January.
- Dilaver, Halit Metehan & Akçay, Alp & van Houtum, Geert-Jan, 2023. "Integrated planning of asset-use and dry-docking for a fleet of maritime assets," International Journal of Production Economics, Elsevier, vol. 256(C).
- Zhao, Xufeng & Nakagawa, Toshio, 2012. "Optimization problems of replacement first or last in reliability theory," European Journal of Operational Research, Elsevier, vol. 223(1), pages 141-149.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Scholl, Armin & Becker, Christian, 2006. "State-of-the-art exact and heuristic solution procedures for simple assembly line balancing," European Journal of Operational Research, Elsevier, vol. 168(3), pages 666-693, February.
- Froger, Aurélien & Gendreau, Michel & Mendoza, Jorge E. & Pinson, Éric & Rousseau, Louis-Martin, 2016. "Maintenance scheduling in the electricity industry: A literature review," European Journal of Operational Research, Elsevier, vol. 251(3), pages 695-706.
- Ferreira, Rodrigo J.P. & de Almeida, Adiel Teixeira & Cavalcante, Cristiano A.V., 2009. "A multi-criteria decision model to determine inspection intervals of condition monitoring based on delay time analysis," Reliability Engineering and System Safety, Elsevier, vol. 94(5), pages 905-912.
- Sprecher, Arno, 2000. "SALBLIB: Challenging instances for assembly line balancing," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 526, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Grigoriev, Alexander & van de Klundert, Joris & Spieksma, Frits C.R., 2006.
"Modeling and solving the periodic maintenance problem,"
European Journal of Operational Research, Elsevier, vol. 172(3), pages 783-797, August.
- Grigoriev, A. & Pierard, G.E. & Storm, G, Chin P, Strijkers GJ., 2004. "Modeling and solving the periodic maintenance problem," Research Memorandum 027, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
- Zied Hajej & Nidhal Rezg & Tarek Askri, 2020. "Joint optimization of capacity, production and maintenance planning of leased machines," Journal of Intelligent Manufacturing, Springer, vol. 31(2), pages 351-374, February.
- Sprecher, Arno, 1997. "A competitive exact algorithm for assembly line balancing," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 449, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Ece Sancı & Meral Azizoğlu, 2017. "Rebalancing the assembly lines: exact solution approaches," International Journal of Production Research, Taylor & Francis Journals, vol. 55(20), pages 5991-6010, October.
- Borba, Leonardo & Ritt, Marcus & Miralles, Cristóbal, 2018. "Exact and heuristic methods for solving the Robotic Assembly Line Balancing Problem," European Journal of Operational Research, Elsevier, vol. 270(1), pages 146-156.
- Lin, Boliang & Wu, Jianping & Lin, Ruixi & Wang, Jiaxi & Wang, Hui & Zhang, Xuhui, 2019. "Optimization of high-level preventive maintenance scheduling for high-speed trains," Reliability Engineering and System Safety, Elsevier, vol. 183(C), pages 261-275.
- Xiaobo Zhao & Katsuhisa Ohno & Hon‐Shiang Lau, 2004. "A balancing problem for mixed model assembly lines with a paced moving conveyor," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(3), pages 446-464, April.
- Eduardo Álvarez-Miranda & Jordi Pereira & Harold Torrez-Meruvia & Mariona Vilà, 2021. "A Hybrid Genetic Algorithm for the Simple Assembly Line Balancing Problem with a Fixed Number of Workstations," Mathematics, MDPI, vol. 9(17), pages 1-19, September.
- Volkanovski, Andrija & Mavko, Borut & Boševski, Tome & Čauševski, Anton & Čepin, Marko, 2008. "Genetic algorithm optimisation of the maintenance scheduling of generating units in a power system," Reliability Engineering and System Safety, Elsevier, vol. 93(6), pages 779-789.
- Gizem Keysan & George L. Nemhauser & Martin W. P. Savelsbergh, 2010. "Tactical and Operational Planning of Scheduled Maintenance for Per-Seat, On-Demand Air Transportation," Transportation Science, INFORMS, vol. 44(3), pages 291-306, August.
- Xiaofeng, Hu & Erfei, Wu & Jinsong, Bao & Ye, Jin, 2010. "A branch-and-bound algorithm to minimize the line length of a two-sided assembly line," European Journal of Operational Research, Elsevier, vol. 206(3), pages 703-707, November.
- Joo, Seong-Jong, 2009. "Scheduling preventive maintenance for modular designed components: A dynamic approach," European Journal of Operational Research, Elsevier, vol. 192(2), pages 512-520, January.
- Boysen, Nils & Schulze, Philipp & Scholl, Armin, 2022. "Assembly line balancing: What happened in the last fifteen years?," European Journal of Operational Research, Elsevier, vol. 301(3), pages 797-814.
- Go, Hun & Kim, Ji-Su & Lee, Dong-Ho, 2013. "Operation and preventive maintenance scheduling for containerships: Mathematical model and solution algorithm," European Journal of Operational Research, Elsevier, vol. 229(3), pages 626-636.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:112:y:1999:i:3:p:489-502. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.