Solving a real-world Locomotive Scheduling Problem with Maintenance Constraints
Author
Abstract
Suggested Citation
DOI: 10.1016/j.trb.2021.06.017
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Nielsen, Lars Kjær & Kroon, Leo & Maróti, Gábor, 2012. "A rolling horizon approach for disruption management of railway rolling stock," European Journal of Operational Research, Elsevier, vol. 220(2), pages 496-509.
- Scheffler, Martin & Neufeld, Janis S. & Hölscher, Michael, 2020. "An MIP-based heuristic solution approach for the locomotive assignment problem focussing on (dis-)connecting processes," Transportation Research Part B: Methodological, Elsevier, vol. 139(C), pages 64-80.
- Ravindra K. Ahuja & Jian Liu & James B. Orlin & Dushyant Sharma & Larry A. Shughart, 2005. "Solving Real-Life Locomotive-Scheduling Problems," Transportation Science, INFORMS, vol. 39(4), pages 503-517, November.
- Haahr, Jørgen T. & Wagenaar, Joris C. & Veelenturf, Lucas P. & Kroon, Leo G., 2016. "A comparison of two exact methods for passenger railway rolling stock (re)scheduling," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 91(C), pages 15-32.
- Cordeau, Jean-François & Desaulniers, Guy & Lingaya, Norbert & Soumis, François & Desrosiers, Jacques, 2001. "Simultaneous locomotive and car assignment at VIA Rail Canada," Transportation Research Part B: Methodological, Elsevier, vol. 35(8), pages 767-787, September.
- Balachandran Vaidyanathan & Ravindra K. Ahuja & James B. Orlin, 2008. "The Locomotive Routing Problem," Transportation Science, INFORMS, vol. 42(4), pages 492-507, November.
- Sarah Frisch & Philipp Hungerländer & Anna Jellen & Dominic Weinberger, 2019. "A Mixed Integer Linear Program for Optimizing the Utilization of Locomotives with Maintenance Constraints," Operations Research Proceedings, in: Bernard Fortz & Martine Labbé (ed.), Operations Research Proceedings 2018, pages 103-109, Springer.
- Jean-François Cordeau & François Soumis & Jacques Desrosiers, 2000. "A Benders Decomposition Approach for the Locomotive and Car Assignment Problem," Transportation Science, INFORMS, vol. 34(2), pages 133-149, May.
- Jean-François Cordeau & Paolo Toth & Daniele Vigo, 1998. "A Survey of Optimization Models for Train Routing and Scheduling," Transportation Science, INFORMS, vol. 32(4), pages 380-404, November.
- Vaidyanathan, Balachandran & Ahuja, Ravindra K. & Liu, Jian & Shughart, Larry A., 2008. "Real-life locomotive planning: New formulations and computational results," Transportation Research Part B: Methodological, Elsevier, vol. 42(2), pages 147-168, February.
- Lin, Zhiyuan & Kwan, Raymond S.K., 2016. "A branch-and-price approach for solving the train unit scheduling problem," Transportation Research Part B: Methodological, Elsevier, vol. 94(C), pages 97-120.
- Suresh Chand & Vernon Ning Hsu & Suresh Sethi, 2002. "Forecast, Solution, and Rolling Horizons in Operations Management Problems: A Classified Bibliography," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 25-43, September.
- Valentina Cacchiani & Alberto Caprara & Paolo Toth, 2019. "An Effective Peak Period Heuristic for Railway Rolling Stock Planning," Transportation Science, INFORMS, vol. 53(3), pages 746-762, May.
- Jean-François Cordeau & François Soumis & Jacques Desrosiers, 2001. "Simultaneous Assignment of Locomotives and Cars to Passenger Trains," Operations Research, INFORMS, vol. 49(4), pages 531-548, August.
- V. B. Gleaves, 1957. "Cyclic scheduling and combinatorial topology: Assignment and routing of motive power to meet scheduling and maintenance requirements Part I ‐ A statement of the operating problem of the Frisco railroa," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 4(3), pages 203-205, September.
- Gábor Maróti & Leo Kroon, 2005. "Maintenance Routing for Train Units: The Transition Model," Transportation Science, INFORMS, vol. 39(4), pages 518-525, November.
- Ralf Borndörfer & Markus Reuther & Thomas Schlechte & Kerstin Waas & Steffen Weider, 2016. "Integrated Optimization of Rolling Stock Rotations for Intercity Railways," Transportation Science, INFORMS, vol. 50(3), pages 863-877, August.
- Fioole, Pieter-Jan & Kroon, Leo & Maroti, Gabor & Schrijver, Alexander, 2006. "A rolling stock circulation model for combining and splitting of passenger trains," European Journal of Operational Research, Elsevier, vol. 174(2), pages 1281-1297, October.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Lin, Boliang & Shen, Yaoming & Wang, Zhongkai & Ni, Shaoquan & Zhao, Yinan, 2023. "An iterative improvement approach for high-speed train maintenance scheduling," Transportation Research Part B: Methodological, Elsevier, vol. 173(C), pages 292-312.
- Roy, Debjit & van Ommeren, Jan-Kees & de Koster, René & Gharehgozli, Amir, 2022. "Modeling landside container terminal queues: Exact analysis and approximations," Transportation Research Part B: Methodological, Elsevier, vol. 162(C), pages 73-102.
- Crespo del Castillo, Adolfo & Parlikad, Ajith Kumar, 2024. "Dynamic fleet management: Integrating predictive and preventive maintenance with operation workload balance to minimise cost," Reliability Engineering and System Safety, Elsevier, vol. 249(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Gao, Yuan & Xia, Jun & D’Ariano, Andrea & Yang, Lixing, 2022. "Weekly rolling stock planning in Chinese high-speed rail networks," Transportation Research Part B: Methodological, Elsevier, vol. 158(C), pages 295-322.
- Camilo Ortiz-Astorquiza & Jean-François Cordeau & Emma Frejinger, 2021. "The Locomotive Assignment Problem with Distributed Power at the Canadian National Railway Company," Transportation Science, INFORMS, vol. 55(2), pages 510-531, March.
- Zhong, Qingwei & Lusby, Richard M. & Larsen, Jesper & Zhang, Yongxiang & Peng, Qiyuan, 2019. "Rolling stock scheduling with maintenance requirements at the Chinese High-Speed Railway," Transportation Research Part B: Methodological, Elsevier, vol. 126(C), pages 24-44.
- Gao, Yuan & Schmidt, Marie & Yang, Lixing & Gao, Ziyou, 2020. "A branch-and-price approach for trip sequence planning of high-speed train units," Omega, Elsevier, vol. 92(C).
- Prashant Premkumar & P. N. Ram Kumar, 2019. "Literature Review of Locomotive Assignment Problem from Service Operations Perspective: The Case of Indian Railways," IIM Kozhikode Society & Management Review, , vol. 8(1), pages 74-86, January.
- Xu, Xiaoming & Li, Chung-Lun & Xu, Zhou, 2018. "Integrated train timetabling and locomotive assignment," Transportation Research Part B: Methodological, Elsevier, vol. 117(PA), pages 573-593.
- Canca, David & Barrena, Eva, 2018. "The integrated rolling stock circulation and depot location problem in railway rapid transit systems," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 109(C), pages 115-138.
- Belgacem Bouzaiene-Ayari & Clark Cheng & Sourav Das & Ricardo Fiorillo & Warren B. Powell, 2016. "From Single Commodity to Multiattribute Models for Locomotive Optimization: A Comparison of Optimal Integer Programming and Approximate Dynamic Programming," Transportation Science, INFORMS, vol. 50(2), pages 366-389, May.
- Lusby, Richard M. & Haahr, Jørgen Thorlund & Larsen, Jesper & Pisinger, David, 2017. "A Branch-and-Price algorithm for railway rolling stock rescheduling," Transportation Research Part B: Methodological, Elsevier, vol. 99(C), pages 228-250.
- Scheffler, Martin & Neufeld, Janis S. & Hölscher, Michael, 2020. "An MIP-based heuristic solution approach for the locomotive assignment problem focussing on (dis-)connecting processes," Transportation Research Part B: Methodological, Elsevier, vol. 139(C), pages 64-80.
- Joris C. Wagenaar & Leo G. Kroon & Marie Schmidt, 2017. "Maintenance Appointments in Railway Rolling Stock Rescheduling," Transportation Science, INFORMS, vol. 51(4), pages 1138-1160, November.
- Haahr, Jørgen T. & Wagenaar, Joris C. & Veelenturf, Lucas P. & Kroon, Leo G., 2016. "A comparison of two exact methods for passenger railway rolling stock (re)scheduling," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 91(C), pages 15-32.
- Haahr, J.T. & Wagenaar, J.C. & Veelenturf, L.P. & Kroon, L.G., 2015. "A Comparison of Two Exact Methods for Passenger Railway Rolling Stock (Re)Scheduling," ERIM Report Series Research in Management ERS-2015-007-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Warren B. Powell & Belgacem Bouzaiene-Ayari & Coleman Lawrence & Clark Cheng & Sourav Das & Ricardo Fiorillo, 2014. "Locomotive Planning at Norfolk Southern: An Optimizing Simulator Using Approximate Dynamic Programming," Interfaces, INFORMS, vol. 44(6), pages 567-578, December.
- Lin, Boliang & Zhao, Yinan, 2021. "Synchronized optimization of EMU train assignment and second-level preventive maintenance scheduling," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
- Lin, Zhiyuan & Kwan, Raymond S.K., 2016. "A branch-and-price approach for solving the train unit scheduling problem," Transportation Research Part B: Methodological, Elsevier, vol. 94(C), pages 97-120.
- Nourbakhsh, Seyed Mohammad & Ouyang, Yanfeng, 2010. "Optimal fueling strategies for locomotive fleets in railroad networks," Transportation Research Part B: Methodological, Elsevier, vol. 44(8-9), pages 1104-1114, September.
- Wang, Entai & Yang, Lixing & Yin, Jiateng & Zhang, Jinlei & Gao, Ziyou, 2024. "Passenger-oriented rolling stock scheduling in the metro system with multiple depots: Network flow based approaches," Transportation Research Part B: Methodological, Elsevier, vol. 180(C).
- Hoogervorst, R. & Dollevoet, T.A.B. & Maróti, G. & Huisman, D., 2019. "A Variable Neighborhood Search Heuristic for Rolling Stock Rescheduling," Econometric Institute Research Papers EI2019-34, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Petr KOZLOV & Sergey VAKULENKO & Nikolay TUSHIN & Elena TIMUKHINA, 2017. "Model To Calculate The Optimal Mode Of Train Locomotives Turnover," Transport Problems, Silesian University of Technology, Faculty of Transport, vol. 12(3), pages 125-133, September.
More about this item
Keywords
Locomotive Scheduling Problem; Maintenance constraints; Mixed integer linear programming;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:transb:v:150:y:2021:i:c:p:386-409. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/548/description#description .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.