Risk-based optimal scheduling of maintenance activities in a railway network
Author
Abstract
Suggested Citation
DOI: 10.1007/s13676-018-0117-z
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- G Budai & D Huisman & R Dekker, 2006.
"Scheduling preventive railway maintenance activities,"
Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(9), pages 1035-1044, September.
- Budai-Balke, G. & Huisman, D. & Dekker, R., 2004. "Scheduling preventive railway maintenance activities," Econometric Institute Research Papers EI 2004-41, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Andrews, John & Prescott, Darren & De Rozières, Florian, 2014. "A stochastic model for railway track asset management," Reliability Engineering and System Safety, Elsevier, vol. 130(C), pages 76-84.
- Federico Della Croce & Andrea Grosso & Fabio Salassa, 2014. "A matheuristic approach for the two-machine total completion time flow shop problem," Annals of Operations Research, Springer, vol. 213(1), pages 67-78, February.
- Wen, M. & Li, R. & Salling, K.B., 2016. "Optimization of preventive condition-based tamping for railway tracks," European Journal of Operational Research, Elsevier, vol. 252(2), pages 455-465.
- Baldi, Mauro M. & Heinicke, Franziska & Simroth, Axel & Tadei, Roberto, 2016. "New heuristics for the Stochastic Tactical Railway Maintenance Problem," Omega, Elsevier, vol. 63(C), pages 94-102.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Zhang, Huimin & Li, Shukai & Wang, Yihui & Yang, Lixing & Gao, Ziyou, 2021. "Collaborative real-time optimization strategy for train rescheduling and track emergency maintenance of high-speed railway: A Lagrangian relaxation-based decomposition algorithm," Omega, Elsevier, vol. 102(C).
- Sedghi, Mahdieh & Kauppila, Osmo & Bergquist, Bjarne & Vanhatalo, Erik & Kulahci, Murat, 2021. "A taxonomy of railway track maintenance planning and scheduling: A review and research trends," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
- Alice Consilvio & José Solís-Hernández & Noemi Jiménez-Redondo & Paolo Sanetti & Federico Papa & Iñigo Mingolarra-Garaizar, 2020. "On Applying Machine Learning and Simulative Approaches to Railway Asset Management: The Earthworks and Track Circuits Case Studies," Sustainability, MDPI, vol. 12(6), pages 1-24, March.
- Wang, Jiaxi, 2024. "Maintenance scheduling at high-speed train depots: An optimization approach," Reliability Engineering and System Safety, Elsevier, vol. 243(C).
- Lin, Boliang & Zhao, Yinan, 2021. "Synchronized optimization of EMU train assignment and second-level preventive maintenance scheduling," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
- Saleh, Ali & Remenyte-Prescott, Rasa & Prescott, Darren & ChiachÃo, Manuel, 2024. "Intelligent and adaptive asset management model for railway sections using the iPN method," Reliability Engineering and System Safety, Elsevier, vol. 241(C).
- Rungskunroch, Panrawee & Jack, Anson & Kaewunruen, Sakdirat, 2021. "Benchmarking on railway safety performance using Bayesian inference, decision tree and petri-net techniques based on long-term accidental data sets," Reliability Engineering and System Safety, Elsevier, vol. 213(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Mohammadi, Reza & He, Qing & Karwan, Mark, 2021. "Data-driven robust strategies for joint optimization of rail renewal and maintenance planning," Omega, Elsevier, vol. 103(C).
- Sedghi, Mahdieh & Kauppila, Osmo & Bergquist, Bjarne & Vanhatalo, Erik & Kulahci, Murat, 2021. "A taxonomy of railway track maintenance planning and scheduling: A review and research trends," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
- Saleh, Ali & Remenyte-Prescott, Rasa & Prescott, Darren & ChiachÃo, Manuel, 2024. "Intelligent and adaptive asset management model for railway sections using the iPN method," Reliability Engineering and System Safety, Elsevier, vol. 241(C).
- M. Pour, Shahrzad & Drake, John H. & Ejlertsen, Lena Secher & Rasmussen, Kourosh Marjani & Burke, Edmund K., 2018. "A hybrid Constraint Programming/Mixed Integer Programming framework for the preventive signaling maintenance crew scheduling problem," European Journal of Operational Research, Elsevier, vol. 269(1), pages 341-352.
- Alice Consilvio & José Solís-Hernández & Noemi Jiménez-Redondo & Paolo Sanetti & Federico Papa & Iñigo Mingolarra-Garaizar, 2020. "On Applying Machine Learning and Simulative Approaches to Railway Asset Management: The Earthworks and Track Circuits Case Studies," Sustainability, MDPI, vol. 12(6), pages 1-24, March.
- Fecarotti, Claudia & Andrews, John & Pesenti, Raffaele, 2021. "A mathematical programming model to select maintenance strategies in railway networks," Reliability Engineering and System Safety, Elsevier, vol. 216(C).
- Wang, Jiaxi, 2024. "Maintenance scheduling at high-speed train depots: An optimization approach," Reliability Engineering and System Safety, Elsevier, vol. 243(C).
- Tomas Lidén, 2020. "Coordinating maintenance windows and train traffic: a case study," Public Transport, Springer, vol. 12(2), pages 261-298, June.
- Goel, Asvin & Meisel, Frank, 2013. "Workforce routing and scheduling for electricity network maintenance with downtime minimization," European Journal of Operational Research, Elsevier, vol. 231(1), pages 210-228.
- Marco Ghirardi & Fabio Salassa, 2022. "A simple and effective algorithm for the maximum happy vertices problem," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 30(1), pages 181-193, April.
- Liu, Gehui & Chen, Shaokuan & Ho, Tinkin & Ran, Xinchen & Mao, Baohua & Lan, Zhen, 2022. "Optimum opportunistic maintenance schedule over variable horizons considering multi-stage degradation and dynamic strategy," Reliability Engineering and System Safety, Elsevier, vol. 225(C).
- Santos, Rui & Fonseca Teixeira, Paulo & Pais Antunes, Antonio, 2015. "Planning and scheduling efficient heavy rail track maintenance through a Decision Rules Model," Research in Transportation Economics, Elsevier, vol. 54(C), pages 20-32.
- Zhang, Chuntian & Gao, Yuan & Yang, Lixing & Gao, Ziyou & Qi, Jianguo, 2020. "Joint optimization of train scheduling and maintenance planning in a railway network: A heuristic algorithm using Lagrangian relaxation," Transportation Research Part B: Methodological, Elsevier, vol. 134(C), pages 64-92.
- Aringhieri, Roberto & Duma, Davide & Landa, Paolo & Mancini, Simona, 2022. "Combining workload balance and patient priority maximisation in operating room planning through hierarchical multi-objective optimisation," European Journal of Operational Research, Elsevier, vol. 298(2), pages 627-643.
- Michael Patriksson & Ann-Brith Strömberg & Adam Wojciechowski, 2015. "The stochastic opportunistic replacement problem, part II: a two-stage solution approach," Annals of Operations Research, Springer, vol. 224(1), pages 51-75, January.
- Arthur H.A. Melani & Carlos A. Murad & Adherbal Caminada Netto & Gilberto F.M. Souza & Silvio I. Nabeta, 2019. "Maintenance Strategy Optimization of a Coal-Fired Power Plant Cooling Tower through Generalized Stochastic Petri Nets," Energies, MDPI, vol. 12(10), pages 1-28, May.
- Zhang, Nan & Fouladirad, Mitra & Barros, Anne, 2017. "Maintenance analysis of a two-component load-sharing system," Reliability Engineering and System Safety, Elsevier, vol. 167(C), pages 67-74.
- Zhang, Huimin & Li, Shukai & Wang, Yihui & Yang, Lixing & Gao, Ziyou, 2021. "Collaborative real-time optimization strategy for train rescheduling and track emergency maintenance of high-speed railway: A Lagrangian relaxation-based decomposition algorithm," Omega, Elsevier, vol. 102(C).
- Bouvard, K. & Artus, S. & Bérenguer, C. & Cocquempot, V., 2011. "Condition-based dynamic maintenance operations planning & grouping. Application to commercial heavy vehicles," Reliability Engineering and System Safety, Elsevier, vol. 96(6), pages 601-610.
- Cats, Oded & Koppenol, Gert-Jaap & Warnier, Martijn, 2017. "Robustness assessment of link capacity reduction for complex networks: Application for public transport systems," Reliability Engineering and System Safety, Elsevier, vol. 167(C), pages 544-553.
More about this item
Keywords
Railway predictive maintenance; Railway assets degradation modelling; Railway maintenance scheduling;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:eurjtl:v:8:y:2019:i:5:d:10.1007_s13676-018-0117-z. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.