A risk-averse simulation-based approach for a joint optimization of workforce capacity, spare part stocks and scheduling priorities in maintenance planning
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ress.2020.107199
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Lin, X. & Basten, R.J.I. & Kranenburg, A.A. & van Houtum, G.J., 2017. "Condition based spare parts supply," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 240-248.
- Özler, Aysun & Tan, BarIs & Karaesmen, Fikri, 2009. "Multi-product newsvendor problem with value-at-risk considerations," International Journal of Production Economics, Elsevier, vol. 117(2), pages 244-255, February.
- Seyed M. R. Iravani & Vijayalakshmi Krishnamurthy, 2007. "Workforce Agility in Repair and Maintenance Environments," Manufacturing & Service Operations Management, INFORMS, vol. 9(2), pages 168-184, January.
- Sleptchenko, Andrei & van der Heijden, Matthieu, 2016. "Joint optimization of redundancy level and spare part inventories," Reliability Engineering and System Safety, Elsevier, vol. 153(C), pages 64-74.
- Kathryn E. Caggiano & John A. Muckstadt & James A. Rappold, 2006. "Integrated Real-Time Capacity and Inventory Allocation for Reparable Service Parts in a Two-Echelon Supply System," Manufacturing & Service Operations Management, INFORMS, vol. 8(3), pages 292-319, August.
- Poppe, Joeri & Basten, Rob J.I. & Boute, Robert N. & Lambrecht, Marc R., 2017. "Numerical study of inventory management under various maintenance policies," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 262-273.
- Warren H. Hausman & Gary D. Scudder, 1982. "Priority Scheduling Rules for Repairable Inventory Systems," Management Science, INFORMS, vol. 28(11), pages 1215-1232, November.
- Geert-Jan van Houtum & Bram Kranenburg, 2015. "Spare Parts Inventory Control under System Availability Constraints," International Series in Operations Research and Management Science, Springer, edition 127, number 978-1-4899-7609-3, December.
- Stephan A. Trusevych & Roy H. Kwon & Andrew K. S. Jardine, 2014. "Optimizing Critical Spare Parts and Location Based on the Conditional Value-At-Risk Criterion," The Engineering Economist, Taylor & Francis Journals, vol. 59(2), pages 116-135, April.
- Gotoh, Jun-ya & Takano, Yuichi, 2007. "Newsvendor solutions via conditional value-at-risk minimization," European Journal of Operational Research, Elsevier, vol. 179(1), pages 80-96, May.
- Zhu, Sha & Jaarsveld, Willem van & Dekker, Rommert, 2020.
"Spare parts inventory control based on maintenance planning,"
Reliability Engineering and System Safety, Elsevier, vol. 193(C).
- Zhu, S. & van Jaarsveld, W.L. & Dekker, R., 2019. "Spare Parts Inventory Control based on Maintenance Planning," Econometric Institute Research Papers EI2019-02, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- A Sleptchenko & M C van der Heijden & A van Harten, 2003. "Trade-off between inventory and repair capacity in spare part networks," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(3), pages 263-272, March.
- Pascual, Rodrigo & Santelices, Gabriel & Lüer-Villagra, Armin & Vera, Jorge & Cawley, Alejandro Mac, 2017. "Optimal repairable spare-parts procurement policy under total business volume discount environment," Reliability Engineering and System Safety, Elsevier, vol. 159(C), pages 276-282.
- Diaz, Angel & Fu, Michael C., 1997. "Models for multi-echelon repairable item inventory systems with limited repair capacity," European Journal of Operational Research, Elsevier, vol. 97(3), pages 480-492, March.
- I. J. B. F. Adan & A. Sleptchenko & G. J. Van Houtum, 2009. "Reducing Costs Of Spare Parts Supply Systems Via Static Priorities," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 26(04), pages 559-585.
- Rahimi-Ghahroodi, S. & Al Hanbali, A. & Zijm, W.H.M. & Timmer, J.B., 2019. "Emergency supply contracts for a service provider with limited local resources," Reliability Engineering and System Safety, Elsevier, vol. 189(C), pages 445-460.
- Qiu, Ruozhen & Shang, Jennifer & Huang, Xiaoyuan, 2014. "Robust inventory decision under distribution uncertainty: A CVaR-based optimization approach," International Journal of Production Economics, Elsevier, vol. 153(C), pages 13-23.
- David F. Pyke, 1990. "Priority repair and dispatch policies for reparable‐item logistics systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 37(1), pages 1-30, February.
- Buyukkurt, M. Demirbag & Parlar, M., 1993. "A comparison of allocation policies in a two-echelon repairable-item inventory model," International Journal of Production Economics, Elsevier, vol. 29(3), pages 291-302, May.
- Hyouk Yoon & Sungtae Jung & Sangjin Lee, 2015. "The effect analysis of multi-echelon inventory models considering demand rate uncertainty and limited maintenance capacity," International Journal of Operational Research, Inderscience Enterprises Ltd, vol. 24(1), pages 38-58.
- Zahedi-Hosseini, Farhad & Scarf, Philip & Syntetos, Aris, 2017. "Joint optimisation of inspection maintenance and spare parts provisioning: a comparative study of inventory policies using simulation and survey data," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 306-316.
- Kafiabad, Shayan Tavakoli & Kazemi Zanjani, Masoumeh & Nourelfath, Mustapha, 2020. "Integrated planning of operations and on-job training in maintenance logistics networks," Reliability Engineering and System Safety, Elsevier, vol. 199(C).
- C A Poojari & C Lucas & G Mitra, 2008. "Robust solutions and risk measures for a supply chain planning problem under uncertainty," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(1), pages 2-12, January.
- Tadeusz Sawik, 2016. "On the risk-averse optimization of service level in a supply chain under disruption risks," International Journal of Production Research, Taylor & Francis Journals, vol. 54(1), pages 98-113, January.
- Tiemessen, H.G.H. & van Houtum, G.J., 2013. "Reducing costs of repairable inventory supply systems via dynamic scheduling," International Journal of Production Economics, Elsevier, vol. 143(2), pages 478-488.
- Wu, Meng & Zhu, Stuart X. & Teunter, Ruud H., 2013. "Newsvendor problem with random shortage cost under a risk criterion," International Journal of Production Economics, Elsevier, vol. 145(2), pages 790-798.
- Sleptchenko, Andrei & Al Hanbali, Ahmad & Zijm, Henk, 2018. "Joint planning of service engineers and spare parts," European Journal of Operational Research, Elsevier, vol. 271(1), pages 97-108.
- Choi, Tsan-Ming & Li, Duan & Yan, Houmin & Chiu, Chun-Hung, 2008. "Channel coordination in supply chains with agents having mean-variance objectives," Omega, Elsevier, vol. 36(4), pages 565-576, August.
- S. Christian Albright & Amit Gupta, 1993. "Steady‐state approximation of a multiechelon multi‐indentured repairable‐item inventory system with a single repair facility," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(4), pages 479-493, June.
- Sleptchenko, Andrei & Turan, Hasan Hüseyin & Pokharel, Shaligram & ElMekkawy, Tarek Y., 2019. "Cross-training policies for repair shops with spare part inventories," International Journal of Production Economics, Elsevier, vol. 209(C), pages 334-345.
- Shushang Zhu & Masao Fukushima, 2009. "Worst-Case Conditional Value-at-Risk with Application to Robust Portfolio Management," Operations Research, INFORMS, vol. 57(5), pages 1155-1168, October.
- Sleptchenko, A. & van der Heijden, M. C. & van Harten, A., 2002. "Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems," International Journal of Production Economics, Elsevier, vol. 79(3), pages 209-230, October.
- Wang, Naichao & Li, Mingyuan & Xiao, Boping & Ma, Lin, 2019. "Availability analysis of a general time distribution system with the consideration of maintenance and spares," Reliability Engineering and System Safety, Elsevier, vol. 192(C).
- Sleptchenko, A. & van der Heijden, M. C. & van Harten, A., 2005. "Using repair priorities to reduce stock investment in spare part networks," European Journal of Operational Research, Elsevier, vol. 163(3), pages 733-750, June.
- Rappold, James A. & Van Roo, Ben D., 2009. "Designing multi-echelon service parts networks with finite repair capacity," European Journal of Operational Research, Elsevier, vol. 199(3), pages 781-792, December.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Azimpoor, Samareh & Taghipour, Sharareh & Farmanesh, Babak & Sharifi, Mani, 2022. "Joint Planning of Production and Inspection of Parallel Machines with Two-phase of Failure," Reliability Engineering and System Safety, Elsevier, vol. 217(C).
- Amini, Mostafa & Bagheri, Ali & Delen, Dursun, 2022. "Discovering injury severity risk factors in automobile crashes: A hybrid explainable AI framework for decision support," Reliability Engineering and System Safety, Elsevier, vol. 226(C).
- Zhu, Mixin & Zhou, Xiaojun, 2023. "Hybrid opportunistic maintenance policy for serial-parallel multi-station manufacturing systems with spare part overlap," Reliability Engineering and System Safety, Elsevier, vol. 236(C).
- Wang, Lei & Liu, Qing & Dong, Shiyu & Guedes Soares, C., 2022. "Selection of countermeasure portfolio for shipping safety with consideration of investment risk aversion," Reliability Engineering and System Safety, Elsevier, vol. 219(C).
- Kim, Seokgoo & Choi, Joo-Ho & Kim, Nam Ho, 2022. "Inspection schedule for prognostics with uncertainty management," Reliability Engineering and System Safety, Elsevier, vol. 222(C).
- Akl, Amany M. & El Sawah, Sondoss & Chakrabortty, Ripon K. & Turan, Hasan Hüseyin, 2022. "A Joint Optimization of Strategic Workforce Planning and Preventive Maintenance Scheduling: A Simulation–Optimization Approach," Reliability Engineering and System Safety, Elsevier, vol. 219(C).
- Zhang, Qin & Liu, Yu & Xiahou, Tangfan & Huang, Hong-Zhong, 2023. "A heuristic maintenance scheduling framework for a military aircraft fleet under limited maintenance capacities," Reliability Engineering and System Safety, Elsevier, vol. 235(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- van der Heijden, M.C. & Alvarez, E.M. & Schutten, J.M.J., 2013. "Inventory reduction in spare part networks by selective throughput time reduction," International Journal of Production Economics, Elsevier, vol. 143(2), pages 509-517.
- Driessen, M.A. & van Houtum, G.J. & Zijm, W.H.M. & Rustenburg, W.D., 2020. "Capacity assignment in repair shops with high material uncertainty," International Journal of Production Economics, Elsevier, vol. 221(C).
- Topan, E. & Eruguz, A.S. & Ma, W. & van der Heijden, M.C. & Dekker, R., 2020. "A review of operational spare parts service logistics in service control towers," European Journal of Operational Research, Elsevier, vol. 282(2), pages 401-414.
- de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
- Tiemessen, H.G.H. & van Houtum, G.J., 2013. "Reducing costs of repairable inventory supply systems via dynamic scheduling," International Journal of Production Economics, Elsevier, vol. 143(2), pages 478-488.
- Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
- Qiu, Ruozhen & Shang, Jennifer & Huang, Xiaoyuan, 2014. "Robust inventory decision under distribution uncertainty: A CVaR-based optimization approach," International Journal of Production Economics, Elsevier, vol. 153(C), pages 13-23.
- Zhu, Sha & van Jaarsveld, Willem & Dekker, Rommert, 2022. "Critical project planning and spare parts inventory management in shutdown maintenance," Reliability Engineering and System Safety, Elsevier, vol. 219(C).
- Sleptchenko, Andrei & Turan, Hasan Hüseyin & Pokharel, Shaligram & ElMekkawy, Tarek Y., 2019. "Cross-training policies for repair shops with spare part inventories," International Journal of Production Economics, Elsevier, vol. 209(C), pages 334-345.
- Minjae Park & Ki Mun Jung & Dong Ho Park, 2016. "Optimal warranty policies considering repair service and replacement service under the manufacturer’s perspective," Annals of Operations Research, Springer, vol. 244(1), pages 117-132, September.
- Levner, Eugene & Perlman, Yael & Cheng, T.C.E. & Levner, Ilya, 2011. "A network approach to modeling the multi-echelon spare-part inventory system with backorders and interval-valued demand," International Journal of Production Economics, Elsevier, vol. 132(1), pages 43-51, July.
- Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
- Akl, Amany M. & El Sawah, Sondoss & Chakrabortty, Ripon K. & Turan, Hasan Hüseyin, 2022. "A Joint Optimization of Strategic Workforce Planning and Preventive Maintenance Scheduling: A Simulation–Optimization Approach," Reliability Engineering and System Safety, Elsevier, vol. 219(C).
- Rezaei Somarin, Aghil & Chen, Songlin & Asian, Sobhan & Wang, David Z.W., 2017. "A heuristic stock allocation rule for repairable service parts," International Journal of Production Economics, Elsevier, vol. 184(C), pages 131-140.
- Rappold, James A. & Van Roo, Ben D., 2009. "Designing multi-echelon service parts networks with finite repair capacity," European Journal of Operational Research, Elsevier, vol. 199(3), pages 781-792, December.
- Selçuk, B., 2013. "An adaptive base stock policy for repairable item inventory control," International Journal of Production Economics, Elsevier, vol. 143(2), pages 304-315.
- Zhu, Sha & Jaarsveld, Willem van & Dekker, Rommert, 2020.
"Spare parts inventory control based on maintenance planning,"
Reliability Engineering and System Safety, Elsevier, vol. 193(C).
- Zhu, S. & van Jaarsveld, W.L. & Dekker, R., 2019. "Spare Parts Inventory Control based on Maintenance Planning," Econometric Institute Research Papers EI2019-02, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Sun, Qi & Dong, Yucheng & Xu, Weidong, 2013. "Effects of higher order moments on the newsvendor problem," International Journal of Production Economics, Elsevier, vol. 146(1), pages 167-177.
- Chun-Hung Chiu & Tsan-Ming Choi, 2016. "Supply chain risk analysis with mean-variance models: a technical review," Annals of Operations Research, Springer, vol. 240(2), pages 489-507, May.
- Parvaneh Samouei & Amir Kheirkhah & Parviz Fattahi, 2015. "A network approach modeling of multi-echelon spare-part inventory system with backorders and quantity discount," Annals of Operations Research, Springer, vol. 226(1), pages 551-563, March.
More about this item
Keywords
Maintenance planning; Spare parts inventories; Repair priority; Risk-aversion; Simulation-based optimization; Variable neighborhood search;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:reensy:v:204:y:2020:i:c:s0951832020307006. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.journals.elsevier.com/reliability-engineering-and-system-safety .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.