Development of a risk assessment selection methodology for asset maintenance decision making: An analytic network process (ANP) approach
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2015.03.017
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Tjader, Youxu & May, Jerrold H. & Shang, Jennifer & Vargas, Luis G. & Gao, Ning, 2014. "Firm-level outsourcing decision making: A balanced scorecard-based analytic network process model," International Journal of Production Economics, Elsevier, vol. 147(PC), pages 614-623.
- Cheng, Zhonghua & Jia, Xisheng & Gao, Ping & Wu, Su & Wang, Jianzhao, 2008. "A framework for intelligent reliability centered maintenance analysis," Reliability Engineering and System Safety, Elsevier, vol. 93(6), pages 806-814.
- Khakzad, Nima & Khan, Faisal & Amyotte, Paul, 2013. "Risk-based design of process systems using discrete-time Bayesian networks," Reliability Engineering and System Safety, Elsevier, vol. 109(C), pages 5-17.
- Langseth, Helge & Portinale, Luigi, 2007. "Bayesian networks in reliability," Reliability Engineering and System Safety, Elsevier, vol. 92(1), pages 92-108.
- Saaty, Thomas L., 1990. "How to make a decision: The analytic hierarchy process," European Journal of Operational Research, Elsevier, vol. 48(1), pages 9-26, September.
- Bana e Costa, Carlos A. & Vansnick, Jean-Claude, 2008. "A critical analysis of the eigenvalue method used to derive priorities in AHP," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1422-1428, June.
- Volkanovski, Andrija & ÄŒepin, Marko & Mavko, Borut, 2009. "Application of the fault tree analysis for assessment of power system reliability," Reliability Engineering and System Safety, Elsevier, vol. 94(6), pages 1116-1127.
- Rajagopal, 2014.
"The Human Factors,"
Palgrave Macmillan Books, in: Architecting Enterprise, chapter 9, pages 225-249,
Palgrave Macmillan.
- Rajagopal, 2013. "The Human Factors," Palgrave Macmillan Books, in: Managing Social Media and Consumerism, chapter 9, pages 173-194, Palgrave Macmillan.
- Jones, B. & Jenkinson, I. & Yang, Z. & Wang, J., 2010. "The use of Bayesian network modelling for maintenance planning in a manufacturing industry," Reliability Engineering and System Safety, Elsevier, vol. 95(3), pages 267-277.
- Celeux, G. & Corset, F. & Lannoy, A. & Ricard, B., 2006. "Designing a Bayesian network for preventive maintenance from expert opinions in a rapid and reliable way," Reliability Engineering and System Safety, Elsevier, vol. 91(7), pages 849-856.
- Pinjala, Srinivas Kumar & Pintelon, Liliane & Vereecke, Ann, 2006. "An empirical investigation on the relationship between business and maintenance strategies," International Journal of Production Economics, Elsevier, vol. 104(1), pages 214-229, November.
- Sarojini Jajimoggala & V. V. S. Kesava Rao & Beela Satyanarayana, 2011. "Maintenance Strategy Evaluation Using ANP and Goal Programming," International Journal of Strategic Decision Sciences (IJSDS), IGI Global, vol. 2(2), pages 56-77, April.
- Chiacchio, F. & Compagno, L. & D'Urso, D. & Manno, G. & Trapani, N., 2011. "Dynamic fault trees resolution: A conscious trade-off between analytical and simulative approaches," Reliability Engineering and System Safety, Elsevier, vol. 96(11), pages 1515-1526.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- James J. H. Liou & Perry C. Y. Liu & Huai-Wei Lo, 2020. "A Failure Mode Assessment Model Based on Neutrosophic Logic for Switched-Mode Power Supply Risk Analysis," Mathematics, MDPI, vol. 8(12), pages 1-19, December.
- Ahmet Erkoyuncu, John & Khan, Samir & Hussain, Syed Mohammed Fazal & Roy, Rajkumar, 2016. "A framework to estimate the cost of No-Fault Found events," International Journal of Production Economics, Elsevier, vol. 173(C), pages 207-222.
- Singh, Shikha & Chandra Misra, Subhas & Kumar, Sameer, 2020. "Identification and ranking of the risk factors involved in PLM implementation," International Journal of Production Economics, Elsevier, vol. 222(C).
- Nitin Panwar & Sanjeev Kumar, 2022. "Mathematical modelling and performance analysis of screening unit in paper plant," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 13(5), pages 2751-2763, October.
- Khalifa Mohammed Al-Sobai & Shaligram Pokharel & Galal M. Abdella, 2020. "Perspectives on the Capabilities for the Selection of Strategic Projects," Sustainability, MDPI, vol. 12(19), pages 1-20, October.
- Diogo Rodrigues & Radu Godina & Pedro Espadinha da Cruz, 2021. "Key Performance Indicators Selection through an Analytic Network Process Model for Tooling and Die Industry," Sustainability, MDPI, vol. 13(24), pages 1-20, December.
- Liu, Hu-Chen & You, Jian-Xin & Duan, Chun-Yan, 2019. "An integrated approach for failure mode and effect analysis under interval-valued intuitionistic fuzzy environment," International Journal of Production Economics, Elsevier, vol. 207(C), pages 163-172.
- Abbas Bonyani & Moslem Alimohammadlou, 2021. "A novel approach to solve the problems with network structure," Operational Research, Springer, vol. 21(2), pages 1279-1297, June.
- Faghih-Roohi, Shahrzad & Akcay, Alp & Zhang, Yingqian & Shekarian, Ehsan & de Jong, Eelco, 2020. "A group risk assessment approach for the selection of pharmaceutical product shipping lanes," International Journal of Production Economics, Elsevier, vol. 229(C).
- Santos, Rachel Barbosa & de Oliveira, Ualison Rébula & Rocha, Henrique Martins, 2018. "Failure mapping for occupational safety management in the film and television industry," International Journal of Production Economics, Elsevier, vol. 203(C), pages 1-12.
- Kheybari, Siamak & Rezaie, Fariba Mahdi & Farazmand, Hadis, 2020. "Analytic network process: An overview of applications," Applied Mathematics and Computation, Elsevier, vol. 367(C).
- Orji, Ifeyinwa Juliet & Kusi-Sarpong, Simonov & Huang, Shuangfa & Vazquez-Brust, Diego, 2020. "Evaluating the factors that influence blockchain adoption in the freight logistics industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 141(C).
- Gholamreza Dehdasht & Rosli Mohamad Zin & M. Salim Ferwati & Mu’azu Mohammed Abdullahi & Ali Keyvanfar & Ronald McCaffer, 2017. "DEMATEL-ANP Risk Assessment in Oil and Gas Construction Projects," Sustainability, MDPI, vol. 9(8), pages 1-24, August.
- Melani, Arthur Henrique Andrade & Murad, Carlos Alberto & Caminada Netto, Adherbal & Souza, Gilberto Francisco Martha de & Nabeta, Silvio Ikuyo, 2018. "Criticality-based maintenance of a coal-fired power plant," Energy, Elsevier, vol. 147(C), pages 767-781.
- Seongtae Kim & M. Ramkumar & Nachiappan Subramanian, 2019. "Logistics service provider selection for disaster preparation: a socio-technical systems perspective," Annals of Operations Research, Springer, vol. 283(1), pages 1259-1282, December.
- Dinis, Duarte & Barbosa-Póvoa, Ana & Teixeira, Ângelo Palos, 2019. "A supporting framework for maintenance capacity planning and scheduling: Development and application in the aircraft MRO industry," International Journal of Production Economics, Elsevier, vol. 218(C), pages 1-15.
- Dong, Qingxing & Cooper, Orrin, 2016. "An orders-of-magnitude AHP supply chain risk assessment framework," International Journal of Production Economics, Elsevier, vol. 182(C), pages 144-156.
- Carpitella, Silvia & Mzougui, Ilyas & BenÃtez, Julio & Carpitella, Fortunato & Certa, Antonella & Izquierdo, JoaquÃn & La Cascia, Marco, 2021. "A risk evaluation framework for the best maintenance strategy: The case of a marine salt manufacture firm," Reliability Engineering and System Safety, Elsevier, vol. 205(C).
- Saad Muslet Albogami & Mohd Khairol Anuar Bin Mohd Ariffin & Eris Elianddy Bin Supeni & Kamarul Arifin Ahmad, 2021. "A New Hybrid AHP and Dempster—Shafer Theory of Evidence Method for Project Risk Assessment Problem," Mathematics, MDPI, vol. 9(24), pages 1-30, December.
- Tai-Wu Chang & Huai-Wei Lo & Kai-Ying Chen & James J. H. Liou, 2019. "A Novel FMEA Model Based on Rough BWM and Rough TOPSIS-AL for Risk Assessment," Mathematics, MDPI, vol. 7(10), pages 1-20, September.
- Francesca Marsili & Jörg Bödefeld, 2021. "Integrating Cluster Analysis into Multi-Criteria Decision Making for Maintenance Management of Aging Culverts," Mathematics, MDPI, vol. 9(20), pages 1-18, October.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Chuan Wang & Yupeng Liu & Wen Hou & Chao Yu & Guorong Wang & Yuyan Zheng, 2021. "Reliability and availability modeling of Subsea Autonomous High Integrity Pressure Protection System with partial stroke test by Dynamic Bayesian," Journal of Risk and Reliability, , vol. 235(2), pages 268-281, April.
- Paul Thaddeus Kazibudzki, 2016. "An examination of performance relations among selected consistency measures for simulated pairwise judgments," Annals of Operations Research, Springer, vol. 244(2), pages 525-544, September.
- Grochmal Stanislaw, 2014. "Mental and cultural changes of enterprise management in accordance with the paradigm of unity," Journal for Perspectives of Economic Political and Social Integration, Sciendo, vol. 20(1), pages 105-134, January.
- Ait Mokhtar, El Hassene & Laggoune, Radouane & Chateauneuf, Alaa, 2023. "Imperfect maintenance modeling and assessment of repairable multi-component systems," Reliability Engineering and System Safety, Elsevier, vol. 234(C).
- Vedpal Arya & S. G. Deshmukh & Naresh Bhatnagar, 2019. "Product quality in an inclusive manufacturing system: some considerations," Journal of Intelligent Manufacturing, Springer, vol. 30(8), pages 2871-2884, December.
- Chang, Chia-Hsun & Kontovas, Christos & Yu, Qing & Yang, Zaili, 2021. "Risk assessment of the operations of maritime autonomous surface ships," Reliability Engineering and System Safety, Elsevier, vol. 207(C).
- Özkan Uğurlu & Serdar Yıldız & Sean Loughney & Jin Wang & Shota Kuntchulia & Irakli Sharabidze, 2020. "Analyzing Collision, Grounding, and Sinking Accidents Occurring in the Black Sea Utilizing HFACS and Bayesian Networks," Risk Analysis, John Wiley & Sons, vol. 40(12), pages 2610-2638, December.
- Corrente, Salvatore & Greco, Salvatore & Ishizaka, Alessio, 2016. "Combining analytical hierarchy process and Choquet integral within non-additive robust ordinal regression," Omega, Elsevier, vol. 61(C), pages 2-18.
- Kaptan, Mehmet & Uğurlu, Özkan & Wang, Jin, 2021. "The effect of nonconformities encountered in the use of technology on the occurrence of collision, contact and grounding accidents," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
- Zheng, Yi-Xuan & Xiahou, Tangfan & Liu, Yu & Xie, Chaoyang, 2021. "Structure function learning of hierarchical multi-state systems with incomplete observation sequences," Reliability Engineering and System Safety, Elsevier, vol. 216(C).
- Bhardwaj, U. & Teixeira, A.P. & Guedes Soares, C. & Ariffin, A.K. & Singh, S.S., 2021. "Evidence based risk analysis of fire and explosion accident scenarios in FPSOs," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
- Cui, L.X. & Du, Yi-Mu & Sun, C.P., 2023. "On system reliability for time-varying structure," Reliability Engineering and System Safety, Elsevier, vol. 234(C).
- Fabio De Felice & Antonella Petrillo & Claudio Autorino, 2015. "Development of a Framework for Sustainable Outsourcing: Analytic Balanced Scorecard Method (A-BSC)," Sustainability, MDPI, vol. 7(7), pages 1-21, June.
- Panagiotis K. Marhavilas & Michael G. Tegas & Georgios K. Koulinas & Dimitrios E. Koulouriotis, 2020. "A Joint Stochastic/Deterministic Process with Multi-Objective Decision Making Risk-Assessment Framework for Sustainable Constructions Engineering Projects—A Case Study," Sustainability, MDPI, vol. 12(10), pages 1-21, May.
- Lei Jiang & Yiliu Liu & Xiaomin Wang & Mary Ann Lundteigen, 2019. "Operation-oriented reliability and availability evaluation for onboard high-speed train control system with dynamic Bayesian network," Journal of Risk and Reliability, , vol. 233(3), pages 455-469, June.
- Chih-Chao Chung & Li-Chung Chao & Chih-Hong Chen & Shi-Jer Lou, 2016. "A Balanced Scorecard of Sustainable Management in the Taiwanese Bicycle Industry: Development of Performance Indicators and Importance Analysis," Sustainability, MDPI, vol. 8(6), pages 1-21, May.
- Lilian. O. Iheukwumere-Esotu & Akilu Yunusa Kaltungo, 2020. "Assessment of Barriers to Knowledge and Experience Transfer in Major Maintenance Activities," Energies, MDPI, vol. 13(7), pages 1-24, April.
- El Hassene Ait Mokhtar & Radouane Laggoune & Alaa Chateauneuf, 2016. "Utility-Based Maintenance Optimization for Complex Water-Distribution Systems Using Bayesian Networks," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 30(12), pages 4153-4170, September.
- Adherbal Caminada Netto & Arthur Henrique de Andrade Melani & Carlos Alberto Murad & Miguel Angelo de Carvalho Michalski & Gilberto Francisco Martha de Souza & Silvio Ikuyo Nabeta, 2020. "A Novel Approach to Defining Maintenance Significant Items: A Hydro Generator Case Study," Energies, MDPI, vol. 13(23), pages 1-20, November.
- Li, Chengjiang & Jia, Tingwen & Wang, Honglei & Wang, Xiaolin & Negnevitsky, Michael & Hu, Yu-jie & Zhao, Gang & Wang, Liang, 2023. "Assessing the prospect of deploying green methanol vehicles in China from energy, environmental and economic perspectives," Energy, Elsevier, vol. 263(PE).
More about this item
Keywords
Asset maintenance; Risk assessment; Selection methodology; ANP;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:170:y:2015:i:pb:p:663-676. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.