IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v76y2002i3p243-256.html
   My bibliography  Save this article

Product due date assignment for complex assemblies

Author

Listed:
  • Song, D. P.
  • Hicks, C.
  • Earl, C. F.

Abstract

No abstract is available for this item.

Suggested Citation

  • Song, D. P. & Hicks, C. & Earl, C. F., 2002. "Product due date assignment for complex assemblies," International Journal of Production Economics, Elsevier, vol. 76(3), pages 243-256, April.
  • Handle: RePEc:eee:proeco:v:76:y:2002:i:3:p:243-256
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(01)00170-0
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Hendry, L. C. & Kingsman, B. G., 1989. "Production planning systems and their applicability to make-to-order companies," European Journal of Operational Research, Elsevier, vol. 40(1), pages 1-15, May.
    2. James K. Weeks, 1979. "A Simulation Study of Predictable Due-Dates," Management Science, INFORMS, vol. 25(4), pages 363-373, April.
    3. John Dumond & Vincent A. Mabert, 1988. "Evaluating Project Scheduling and Due Date Assignment Procedures: An Experimental Analysis," Management Science, INFORMS, vol. 34(1), pages 101-118, January.
    4. Elmaghraby, S. E. & Ferreira, A. A. & Tavares, L. V., 2000. "Optimal start times under stochastic activity durations," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 153-164, March.
    5. אסתר טולידנו, 1992. "מקבלי דמי אבטלה בשנת 1991," Working Papers 563, National Insurance Institute of Israel.
    6. דליה גורדון ותמר אליאב, 1992. "משפחות חד הוריות, 1991," Working Papers 539, National Insurance Institute of Israel.
    7. Bertrand, J. W. M. & Muntslag, D. R., 1993. "Production control in engineer-to-order firms," International Journal of Production Economics, Elsevier, vol. 30(1), pages 3-22, July.
    8. אסתר טולידנו, 1993. "מקבלי דמי אבטלה בשנת 1992," Working Papers 475, National Insurance Institute of Israel.
    9. תמר אליאב ולאה ענבר, 1992. "גמלאות אמהות 1990/91," Working Papers 519, National Insurance Institute of Israel.
    10. Soroush, H. M., 1999. "Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs," European Journal of Operational Research, Elsevier, vol. 113(2), pages 450-468, March.
    11. Cheng, T. C. E. & Gupta, M. C., 1989. "Survey of scheduling research involving due date determination decisions," European Journal of Operational Research, Elsevier, vol. 38(2), pages 156-166, January.
    12. אסתר טולידנו, 1994. "מקבלי דמי אבטלה בשנת 1993," Working Papers 439, National Insurance Institute of Israel.
    13. Shanthikumar, J. G. & Buzacott, J. A., 1984. "The time spent in a dynamic job shop," European Journal of Operational Research, Elsevier, vol. 17(2), pages 215-226, August.
    14. Adam, Nabil R. & Bertrand, J. Will M. & Morehead, Diane C. & Surkis, Julius, 1993. "Due date assignment procedures with dynamically updated coefficients for multi-level assembly job shops," European Journal of Operational Research, Elsevier, vol. 68(2), pages 212-227, July.
    15. שרית בייץ מוראי & תמר הרון ורבקה ורטמן, 1993. "ביצוע חוק סיעוד במרכזי יום," Working Papers 456, National Insurance Institute of Israel.
    16. Abraham Seidmann & Milton L. Smith, 1981. "Due Date Assignment for Production Systems," Management Science, INFORMS, vol. 27(5), pages 571-581, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Chan, Felix T. S. & Chung, S. H. & Wadhwa, Subhash, 2005. "A hybrid genetic algorithm for production and distribution," Omega, Elsevier, vol. 33(4), pages 345-355, August.
    2. Song, Dong-Ping, 2006. "Raw material release time control for complex make-to-order products with stochastic processing times," International Journal of Production Economics, Elsevier, vol. 103(1), pages 371-385, September.
    3. Zorzini, M. & Corti, D. & Pozzetti, A., 2008. "Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis," International Journal of Production Economics, Elsevier, vol. 112(2), pages 919-933, April.
    4. Birutė Mikulskienė & Julija Moskvina, 2020. "Peculiar properties of the pricing process in customized furniture manufacturing enterprises," Journal of Revenue and Pricing Management, Palgrave Macmillan, vol. 19(6), pages 411-420, December.
    5. Perkgoz, Cahit & Azaron, Amir & Katagiri, Hideki & Kato, Kosuke & Sakawa, Masatoshi, 2007. "A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms," European Journal of Operational Research, Elsevier, vol. 180(1), pages 292-308, July.
    6. Azaron, Amir & Katagiri, Hideki & Kato, Kosuke & Sakawa, Masatoshi, 2006. "Modelling complex assemblies as a queueing network for lead time control," European Journal of Operational Research, Elsevier, vol. 174(1), pages 150-168, October.
    7. McGovern, T. & Hicks, C., 2004. "Deregulation and restructuring of the global electricity supply industry and its impact upon power plant suppliers," International Journal of Production Economics, Elsevier, vol. 89(3), pages 321-337, June.
    8. Przemysław Korytkowski & Tomasz Wiśniewski, 2011. "Performance analysis of commercial offset printing under dynamic priority rules," Operations Research and Decisions, Wroclaw University of Science and Technology, Faculty of Management, vol. 21(1), pages 53-64.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Haskose, A. & Kingsman, B. G. & Worthington, D., 2002. "Modelling flow and jobbing shops as a queueing network for workload control," International Journal of Production Economics, Elsevier, vol. 78(3), pages 271-285, August.
    2. Forza, C. & Salvador, F., 2001. "Information flows for high-performance manufacturing," International Journal of Production Economics, Elsevier, vol. 70(1), pages 21-36, March.
    3. Pennings, Enrico & Natter, Martin, 2001. "Strategic diversification and capacity utilization," International Journal of Production Economics, Elsevier, vol. 72(3), pages 261-272, August.
    4. Chou, Shuo-Yan & Chang, Sheng-Lin & Yang, Wen-Dwo, 2001. "Optimal multiple delivery schedule for demand in logistic model," International Journal of Production Economics, Elsevier, vol. 73(3), pages 241-249, October.
    5. Kalu, Timothy Ch. U., 1999. "Capital budgeting under uncertainty: An extended goal programming approach," International Journal of Production Economics, Elsevier, vol. 58(3), pages 235-251, January.
    6. de Haan, Job & Yamamoto, Masaru & Lovink, Gerben, 2001. "Production planning in Japan: rediscovering lost experiences or new insights?," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 101-109, May.
    7. Baker, Rose D., 2000. "Calculating the expected failure rate of complex equipment subject to hazardous repair," International Journal of Production Economics, Elsevier, vol. 67(1), pages 53-61, August.
    8. Branas, Charles C. & Revelle, Charles S., 2001. "An iterative switching heuristic to locate hospitals and helicopters," Socio-Economic Planning Sciences, Elsevier, vol. 35(1), pages 11-30, March.
    9. Waeyenbergh, Geert & Pintelon, Liliane, 2002. "A framework for maintenance concept development," International Journal of Production Economics, Elsevier, vol. 77(3), pages 299-313, June.
    10. Raaymakers, Wenny H. M. & Fransoo, Jan C., 2000. "Identification of aggregate resource and job set characteristics for predicting job set makespan in batch process industries," International Journal of Production Economics, Elsevier, vol. 68(2), pages 137-149, November.
    11. Heidenberger, Kurt & Schillinger, Alexander & Stummer, Christian, 2003. "Budgeting for research and development: a dynamic financial simulation approach," Socio-Economic Planning Sciences, Elsevier, vol. 37(1), pages 15-27, March.
    12. Bazsa, E. M. & Frenk, J. B. G. & den Iseger, P. W., 2001. "Modeling of inventory control with regenerative processes," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 263-276, May.
    13. Motwani, Jaideep & Mirchandani, Dinesh & Madan, Manu & Gunasekaran, A., 2002. "Successful implementation of ERP projects: Evidence from two case studies," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 83-96, January.
    14. Gonzalez-Benito, Javier & Suarez-Gonzalez, Isabel & Spring, Martin, 2000. "Complementarities between JIT purchasing practices: An economic analysis based on transaction costs," International Journal of Production Economics, Elsevier, vol. 67(3), pages 279-293, October.
    15. Azaron, Amir & Katagiri, Hideki & Kato, Kosuke & Sakawa, Masatoshi, 2006. "Modelling complex assemblies as a queueing network for lead time control," European Journal of Operational Research, Elsevier, vol. 174(1), pages 150-168, October.
    16. Maffin, David & Braiden, Paul, 2001. "Manufacturing and supplier roles in product development," International Journal of Production Economics, Elsevier, vol. 69(2), pages 205-213, January.
    17. Giannoccaro, Ilaria & Pontrandolfo, Pierpaolo, 2002. "Inventory management in supply chains: a reinforcement learning approach," International Journal of Production Economics, Elsevier, vol. 78(2), pages 153-161, July.
    18. De Toni, Alberto & Nassimbeni, Guido, 2001. "A method for the evaluation of suppliers co-design effort," International Journal of Production Economics, Elsevier, vol. 72(2), pages 169-180, July.
    19. Enns, S. T., 1998. "Lead time selection and the behaviour of work flow in job shops," European Journal of Operational Research, Elsevier, vol. 109(1), pages 122-136, August.
    20. Sarkis, Joseph & Presley, Adrien & Liles, Donald, 1997. "The strategic evaluation of candidate business process reengineering projects," International Journal of Production Economics, Elsevier, vol. 50(2-3), pages 261-274, June.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:76:y:2002:i:3:p:243-256. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.