A capacity-driven approach to establish reliable due dates in a MTO environment
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Land, Martin & Gaalman, Gerard, 1996. "Workload control concepts in job shops A critical assessment," International Journal of Production Economics, Elsevier, vol. 46(1), pages 535-548, December.
- ElHafsi, Mohsen, 2000. "An operational decision model for lead-time and price quotation in congested manufacturing systems," European Journal of Operational Research, Elsevier, vol. 126(2), pages 355-370, October.
- (Van) Enns, S. T., 1995. "An economic approach to job shop performance analysis," International Journal of Production Economics, Elsevier, vol. 38(2-3), pages 117-131, March.
- Hendry, L. C. & Kingsman, B. G., 1989. "Production planning systems and their applicability to make-to-order companies," European Journal of Operational Research, Elsevier, vol. 40(1), pages 1-15, May.
- Kingsman, Brian G., 2000. "Modelling input-output workload control for dynamic capacity planning in production planning systems," International Journal of Production Economics, Elsevier, vol. 68(1), pages 73-93, October.
- Lawrence, Stephen R., 1994. "Negotiating due-dates between customers and producers," International Journal of Production Economics, Elsevier, vol. 37(1), pages 127-138, November.
- van Ooijen, H. P. G. & Bertrand, J. W. M., 2001. "Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 261-268, December.
- Kingsman, Brian & Worden, Lee & Hendry, Linda & Mercer, Alan & Wilson, Elaine, 1993. "Integrating marketing and production planning in make-to-order companies," International Journal of Production Economics, Elsevier, vol. 30(1), pages 53-66, July.
- Henrich, Peter & Land, Martin & Gaalman, Gerard, 2004. "Exploring applicability of the workload control concept," International Journal of Production Economics, Elsevier, vol. 90(2), pages 187-198, July.
- Cheng, T. C. E. & Gupta, M. C., 1989. "Survey of scheduling research involving due date determination decisions," European Journal of Operational Research, Elsevier, vol. 38(2), pages 156-166, January.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Altendorfer, Klaus & Minner, Stefan, 2015. "Influence of order acceptance policies on optimal capacity investment with stochastic customer required lead times," European Journal of Operational Research, Elsevier, vol. 243(2), pages 555-565.
- Carvalho, Andréa Nunes & Oliveira, Fabricio & Scavarda, Luiz Felipe, 2016. "Tactical capacity planning in a real-world ETO industry case: A robust optimization approach," International Journal of Production Economics, Elsevier, vol. 180(C), pages 158-171.
- Carvalho, Andréa Nunes & Oliveira, Fabricio & Scavarda, Luiz Felipe, 2015. "Tactical capacity planning in a real-world ETO industry case: An action research," International Journal of Production Economics, Elsevier, vol. 167(C), pages 187-203.
- Stevenson, Mark & Huang, Yuan & Hendry, Linda C. & Soepenberg, Erik, 2011. "The theory and practice of workload control: A research agenda and implementation strategy," International Journal of Production Economics, Elsevier, vol. 131(2), pages 689-700, June.
- Gansterer, Margaretha, 2015. "Aggregate planning and forecasting in make-to-order production systems," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 521-528.
- Surbhi Upadhyay & Suresh Kumar Garg & Rishu Sharma, 2023. "Analyzing the Factors for Implementing Make-to-Order Manufacturing System," Sustainability, MDPI, vol. 15(13), pages 1-22, June.
- Chuang Wang & Pingyu Jiang, 2019. "Deep neural networks based order completion time prediction by using real-time job shop RFID data," Journal of Intelligent Manufacturing, Springer, vol. 30(3), pages 1303-1318, March.
- Zorzini, M. & Corti, D. & Pozzetti, A., 2008. "Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis," International Journal of Production Economics, Elsevier, vol. 112(2), pages 919-933, April.
- Mile Katic & Renu Agarwal, 2018. "The Flexibility Paradox: Achieving Ambidexterity in High-Variety, Low-Volume Manufacturing," Global Journal of Flexible Systems Management, Springer;Global Institute of Flexible Systems Management, vol. 19(1), pages 69-86, March.
- Calle, Marcos & González-R, Pedro L. & Leon, Jose M. & Pierreval, Henri & Canca, David, 2016. "Integrated management of inventory and production systems based on floating decoupling point and real-time information: A simulation based analysis," International Journal of Production Economics, Elsevier, vol. 181(PA), pages 48-57.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Stevenson, Mark & Hendry, Linda C., 2006. "Aggregate load-oriented workload control: A review and a re-classification of a key approach," International Journal of Production Economics, Elsevier, vol. 104(2), pages 676-693, December.
- Zorzini, M. & Corti, D. & Pozzetti, A., 2008. "Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis," International Journal of Production Economics, Elsevier, vol. 112(2), pages 919-933, April.
- Kingsman, Brian G., 2000. "Modelling input-output workload control for dynamic capacity planning in production planning systems," International Journal of Production Economics, Elsevier, vol. 68(1), pages 73-93, October.
- Henrich, Peter & Land, Martin & Gaalman, Gerard, 2006. "Grouping machines for effective workload control," International Journal of Production Economics, Elsevier, vol. 104(1), pages 125-142, November.
- Haskose, A. & Kingsman, B. G. & Worthington, D, 2004. "Performance analysis of make-to-order manufacturing systems under different workload control regimes," International Journal of Production Economics, Elsevier, vol. 90(2), pages 169-186, July.
- Land, Martin, 2006. "Parameters and sensitivity in workload control," International Journal of Production Economics, Elsevier, vol. 104(2), pages 625-638, December.
- Jianjun Liu & Martin J. Land & Jos A. C. Bokhorst & Qingxin Chen, 2023. "Improving coordination in assembly job shops: redesigning order release and dispatching," Flexible Services and Manufacturing Journal, Springer, vol. 35(3), pages 669-697, September.
- Hendry, L. & Land, M. & Stevenson, M. & Gaalman, G., 2008. "Investigating implementation issues for workload control (WLC): A comparative case study analysis," International Journal of Production Economics, Elsevier, vol. 112(1), pages 452-469, March.
- Haskose, A. & Kingsman, B. G. & Worthington, D., 2002. "Modelling flow and jobbing shops as a queueing network for workload control," International Journal of Production Economics, Elsevier, vol. 78(3), pages 271-285, August.
- Stevenson, Mark & Huang, Yuan & Hendry, Linda C. & Soepenberg, Erik, 2011. "The theory and practice of workload control: A research agenda and implementation strategy," International Journal of Production Economics, Elsevier, vol. 131(2), pages 689-700, June.
- van Ooijen, H. P. G. & Bertrand, J. W. M., 2001. "Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 261-268, December.
- Davide Mezzogori & Giovanni Romagnoli & Francesco Zammori, 2021. "Defining accurate delivery dates in make to order job-shops managed by workload control," Flexible Services and Manufacturing Journal, Springer, vol. 33(4), pages 956-991, December.
- Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
- repec:dgr:rugsom:02a72 is not listed on IDEAS
- Betrand, J.W.M. & van Ooijen, H.P.G., 2008. "Optimal work order release for make-to-order job shops with customer order lead-time costs, tardiness costs and work-in-process costs," International Journal of Production Economics, Elsevier, vol. 116(2), pages 233-241, December.
- Land, Martin J., 2009. "Cobacabana (control of balance by card-based navigation): A card-based system for job shop control," International Journal of Production Economics, Elsevier, vol. 117(1), pages 97-103, January.
- Federica Costa & Alberto Portioli-Staudacher, 2021. "Labor flexibility integration in workload control in Industry 4.0 era," Operations Management Research, Springer, vol. 14(3), pages 420-433, December.
- Dellaert, N. P. & Melo, M. T., 1996. "Production strategies for a stochastic lot-sizing problem with constant capacity," European Journal of Operational Research, Elsevier, vol. 92(2), pages 281-301, July.
- Land, Martin & Gaalman, Gerard, 1996. "Workload control concepts in job shops A critical assessment," International Journal of Production Economics, Elsevier, vol. 46(1), pages 535-548, December.
- Thürer, Matthias & Stevenson, Mark & Qu, Ting & Godinho Filho, Moacir, 2014. "The design of simple subcontracting rules for make-to-order shops: An assessment by simulation," European Journal of Operational Research, Elsevier, vol. 239(3), pages 854-864.
- Sagawa, Juliana Keiko & Oliveira, Allan Freitas & Mušič, Gašper & Land, Martin J. & Maluf, Arthur Sarro, 2023. "Smart workload input-output control of production systems: A proof of concept," European Journal of Operational Research, Elsevier, vol. 309(1), pages 286-305.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:104:y:2006:i:2:p:536-554. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.