Order acceptance and scheduling: A taxonomy and review
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Haskose, A. & Kingsman, B. G. & Worthington, D, 2004. "Performance analysis of make-to-order manufacturing systems under different workload control regimes," International Journal of Production Economics, Elsevier, vol. 90(2), pages 169-186, July.
- ,, 2001. "Problems And Solutions," Econometric Theory, Cambridge University Press, vol. 17(6), pages 1157-1160, December.
- Michael Pinedo, 1983. "Stochastic Scheduling with Release Dates and Due Dates," Operations Research, INFORMS, vol. 31(3), pages 559-572, June.
- Izak Duenyas & Wallace J. Hopp, 1995. "Quoting Customer Lead Times," Management Science, INFORMS, vol. 41(1), pages 43-57, January.
- Kyparisis, George J. & Gupta, Sushil K. & Ip, Chi-Ming, 1996. "Project selection with discounted returns and multiple constraints," European Journal of Operational Research, Elsevier, vol. 94(1), pages 87-96, October.
- Chen, Zhi-Long & Lee, Chung-Yee, 2002. "Parallel machine scheduling with a common due window," European Journal of Operational Research, Elsevier, vol. 136(3), pages 512-527, February.
- Slotnick, Susan A. & Sobel, Matthew J., 2005. "Manufacturing lead-time rules: Customer retention versus tardiness costs," European Journal of Operational Research, Elsevier, vol. 163(3), pages 825-856, June.
- ten Kate, Hans A., 1994. "Towards a better understanding of order acceptance," International Journal of Production Economics, Elsevier, vol. 37(1), pages 139-152, November.
- Zijm, W. H. M. & Buitenhek, R., 1996. "Capacity planning and lead time management," International Journal of Production Economics, Elsevier, vol. 46(1), pages 165-179, December.
- Yeung, W. K. & Oguz, Ceyda & Edwin Cheng, T. C., 2004. "Two-stage flowshop earliness and tardiness machine scheduling involving a common due window," International Journal of Production Economics, Elsevier, vol. 90(3), pages 421-434, August.
- Sadykov, Ruslan, 2008. "A branch-and-check algorithm for minimizing the weighted number of late jobs on a single machine with release dates," European Journal of Operational Research, Elsevier, vol. 189(3), pages 1284-1304, September.
- Michael H. Rothkopf, 1966. "Scheduling Independent Tasks on Parallel Processors," Management Science, INFORMS, vol. 12(5), pages 437-447, January.
- Anton J. Kleywegt & Jason D. Papastavrou, 2001. "The Dynamic and Stochastic Knapsack Problem with Random Sized Items," Operations Research, INFORMS, vol. 49(1), pages 26-41, February.
- Kingsman, Brian G., 2000. "Modelling input-output workload control for dynamic capacity planning in production planning systems," International Journal of Production Economics, Elsevier, vol. 68(1), pages 73-93, October.
- Leo G. Kroon & Marc Salomon & Luk N. Van Wassenhove, 1997. "Exact and Approximation Algorithms for the Tactical Fixed Interval Scheduling Problem," Operations Research, INFORMS, vol. 45(4), pages 624-638, August.
- V C Ivănescu & J W M Bertrand & J C Fransoo & J P C Kleijnen, 2006. "Bootstrapping to solve the limited data problem in production control: an application in batch process industries," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(1), pages 2-9, January.
- Kovalyov, Mikhail Y. & Ng, C.T. & Cheng, T.C. Edwin, 2007. "Fixed interval scheduling: Models, applications, computational complexity and algorithms," European Journal of Operational Research, Elsevier, vol. 178(2), pages 331-342, April.
- Calosso, T. & Cantamessa, M. & Vu, Dang & Villa, A., 2003. "Production planning and order acceptance in business to business electronic commerce," International Journal of Production Economics, Elsevier, vol. 85(2), pages 233-249, August.
- De, Prabuddha & Ghosh, Jay B. & Wells, Charles E., 1993. "Job selection and sequencing on a single machine in a random environment," European Journal of Operational Research, Elsevier, vol. 70(3), pages 425-431, November.
- Bekki, Özgün BarIs & Azizoglu, Meral, 2008. "Operational fixed interval scheduling problem on uniform parallel machines," International Journal of Production Economics, Elsevier, vol. 112(2), pages 756-768, April.
- Balakrishnan, Nagraj & Patterson, J. Wayne & Sridharan, V., 1999. "Robustness of capacity rationing policies," European Journal of Operational Research, Elsevier, vol. 115(2), pages 328-338, June.
- Stern, Helman I. & Avivi, Zion, 1990. "The selection and scheduling of textile orders with due dates," European Journal of Operational Research, Elsevier, vol. 44(1), pages 11-16, January.
- C. N. Potts & L. N. Van Wassenhove, 1988. "Algorithms for Scheduling a Single Machine to Minimize the Weighted Number of Late Jobs," Management Science, INFORMS, vol. 34(7), pages 843-858, July.
- Peridy, Laurent & Pinson, Eric & Rivreau, David, 2003. "Using short-term memory to minimize the weighted number of late jobs on a single machine," European Journal of Operational Research, Elsevier, vol. 148(3), pages 591-603, August.
- Gordon, Valery S. & Strusevich, Vitaly A., 2009. "Single machine scheduling and due date assignment with positionally dependent processing times," European Journal of Operational Research, Elsevier, vol. 198(1), pages 57-62, October.
- Joseph Geunes & H. Edwin Romeijn & Kevin Taaffe, 2006. "Requirements Planning with Pricing and Order Selection Flexibility," Operations Research, INFORMS, vol. 54(2), pages 394-401, April.
- Gordon, Valery & Proth, Jean-Marie & Chu, Chengbin, 2002. "A survey of the state-of-the-art of common due date assignment and scheduling research," European Journal of Operational Research, Elsevier, vol. 139(1), pages 1-25, May.
- Sevaux, Marc & Dauzere-Peres, Stephane, 2003. "Genetic algorithms to minimize the weighted number of late jobs on a single machine," European Journal of Operational Research, Elsevier, vol. 151(2), pages 296-306, December.
- Rainer Kolisch & Konrad Meyer, 2006. "Selection and Scheduling of Pharmaceutical Research Projects," International Series in Operations Research & Management Science, in: Joanna Józefowska & Jan Weglarz (ed.), Perspectives in Modern Project Scheduling, chapter 0, pages 321-344, Springer.
- M. Rosário Moreira & Rui Alves, 2006. "Does Order Negotiation Improve The Job-Shop Workload Control?," FEP Working Papers 213, Universidade do Porto, Faculdade de Economia do Porto.
- Sushil K. Gupta & Jerzy Kyparisis & Chi-Ming Ip, 1992. "Note---Project Selection and Sequencing to Maximize Net Present Value of the Total Return," Management Science, INFORMS, vol. 38(5), pages 751-752, May.
- Alarcón, F. & Alemany, M.M.E. & Ortiz, A., 2009. "Conceptual framework for the characterization of the order promising process in a collaborative selling network context," International Journal of Production Economics, Elsevier, vol. 120(1), pages 100-114, July.
- Chen, Jiaqiong & Askin, Ronald G., 2009. "Project selection, scheduling and resource allocation with time dependent returns," European Journal of Operational Research, Elsevier, vol. 193(1), pages 23-34, February.
- Pinar Keskinocak & R. Ravi & Sridhar Tayur, 2001. "Scheduling and Reliable Lead-Time Quotation for Orders with Availability Intervals and Lead-Time Sensitive Revenues," Management Science, INFORMS, vol. 47(2), pages 264-279, February.
- Alidaee, Bahram & Kochenberger, Gary A. & Amini, Mohammad M., 2001. "Greedy solutions of selection and ordering problems," European Journal of Operational Research, Elsevier, vol. 134(1), pages 203-215, October.
- Cheng, T. C. E. & Gupta, M. C., 1989. "Survey of scheduling research involving due date determination decisions," European Journal of Operational Research, Elsevier, vol. 38(2), pages 156-166, January.
- Izak Duenyas, 1995. "Single Facility Due Date Setting with Multiple Customer Classes," Management Science, INFORMS, vol. 41(4), pages 608-619, April.
- Zhang, Liqi & Lu, Lingfa & Yuan, Jinjiang, 2009. "Single machine scheduling with release dates and rejection," European Journal of Operational Research, Elsevier, vol. 198(3), pages 975-978, November.
- Kroon, Leo G. & Salomon, Marc & Van Wassenhove, Luk N., 1995. "Exact and approximation algorithms for the operational fixed interval scheduling problem," European Journal of Operational Research, Elsevier, vol. 82(1), pages 190-205, April.
- Og[breve]uz, Ceyda & Sibel Salman, F. & Bilgintürk YalçIn, Zehra, 2010. "Order acceptance and scheduling decisions in make-to-order systems," International Journal of Production Economics, Elsevier, vol. 125(1), pages 200-211, May.
- Charnsirisakskul, Kasarin & Griffin, Paul M. & Keskinocak, Pinar, 2006. "Pricing and scheduling decisions with leadtime flexibility," European Journal of Operational Research, Elsevier, vol. 171(1), pages 153-169, May.
- Lin, B.M.T. & Kononov, A.V., 2007. "Customer order scheduling to minimize the number of late jobs," European Journal of Operational Research, Elsevier, vol. 183(2), pages 944-948, December.
- György Dósa & Yong He, 2006. "Scheduling with machine cost and rejection," Journal of Combinatorial Optimization, Springer, vol. 12(4), pages 337-350, December.
- Easton, Fred F. & Moodie, Douglas R., 1999. "Pricing and lead time decisions for make-to-order firms with contingent orders," European Journal of Operational Research, Elsevier, vol. 116(2), pages 305-318, July.
- Lee, Ik Sun & Sung, C.S., 2008. "Single machine scheduling with outsourcing allowed," International Journal of Production Economics, Elsevier, vol. 111(2), pages 623-634, February.
- Shizuo Senju & Yoshiaki Toyoda, 1968. "An Approach to Linear Programming with 0-1 Variables," Management Science, INFORMS, vol. 15(4), pages 196-207, December.
- M. Y. Kovalyov & C. N. Potts & L. N. van Wassenhove, 1994. "A Fully Polynomial Approximation Scheme for Scheduling a Single Machine to Minimize Total Weighted Late Work," Mathematics of Operations Research, INFORMS, vol. 19(1), pages 86-93, February.
- ,, 2001. "Problems And Solutions," Econometric Theory, Cambridge University Press, vol. 17(5), pages 1025-1031, October.
- Cheng, Yushao & Sun, Shijie, 2009. "Scheduling linear deteriorating jobs with rejection on a single machine," European Journal of Operational Research, Elsevier, vol. 194(1), pages 18-27, April.
- Akkan, Can, 1997. "Finite-capacity scheduling-based planning for revenue-based capacity management," European Journal of Operational Research, Elsevier, vol. 100(1), pages 170-179, July.
- Lawrence R. Weatherford & Samuel E. Bodily, 1992. "A Taxonomy and Research Overview of Perishable-Asset Revenue Management: Yield Management, Overbooking, and Pricing," Operations Research, INFORMS, vol. 40(5), pages 831-844, October.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Koulamas, Christos & Kyparisis, George J., 2023. "A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems," European Journal of Operational Research, Elsevier, vol. 305(3), pages 999-1017.
- Janiak, Adam & Janiak, Władysław A. & Krysiak, Tomasz & Kwiatkowski, Tomasz, 2015. "A survey on scheduling problems with due windows," European Journal of Operational Research, Elsevier, vol. 242(2), pages 347-357.
- Somaye Geramipour & Ghasem Moslehi & Mohammad Reisi-Nafchi, 2017. "Maximizing the profit in customer’s order acceptance and scheduling problem with weighted tardiness penalty," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(1), pages 89-101, January.
- Tanja Mlinar & Philippe Chevalier, 2016.
"Pooling heterogeneous products for manufacturing environments,"
4OR, Springer, vol. 14(2), pages 173-200, June.
- MLINAR, Tanja & CHEVALIER, Philippe, 2016. "Pooling Heterogeneous Products for Manufacturing Environments," LIDAM Reprints CORE 2744, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Li, Xueping & Wang, Jiao & Sawhney, Rapinder, 2012. "Reinforcement learning for joint pricing, lead-time and scheduling decisions in make-to-order systems," European Journal of Operational Research, Elsevier, vol. 221(1), pages 99-109.
- Cemal AKTÜRK & Sevinç GÜLSEÇEN, 2018. "Sipariş Teslim Tarihi Problemi İçin Çok Kriterli ve Çok Yöntemli Karar Destek Sistemi Önerisi," Istanbul Management Journal, Istanbul University Business School, vol. 29(84), pages 65-78, June.
- Jade Herbots & Willy Herroelen & Roel Leus, 2007. "Dynamic order acceptance and capacity planning on a single bottleneck resource," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(8), pages 874-889, December.
- Liu, Zhixin & Lu, Liang & Qi, Xiangtong, 2020. "Price quotation for orders with different due dates," International Journal of Production Economics, Elsevier, vol. 220(C).
- Tarhan, İstenç & Oğuz, Ceyda, 2022. "A matheuristic for the generalized order acceptance and scheduling problem," European Journal of Operational Research, Elsevier, vol. 299(1), pages 87-103.
- Seçil Savaşaneril & Paul M. Griffin & Pınar Keskinocak, 2010. "Dynamic Lead-Time Quotation for an M/M/1 Base-Stock Inventory Queue," Operations Research, INFORMS, vol. 58(2), pages 383-395, April.
- Barış Ata & Tava Lennon Olsen, 2009. "Near-Optimal Dynamic Lead-Time Quotation and Scheduling Under Convex-Concave Customer Delay Costs," Operations Research, INFORMS, vol. 57(3), pages 753-768, June.
- A. Baykal Hafızoğlu & Esma S. Gel & Pınar Keskinocak, 2016. "Price and Lead Time Quotation for Contract and Spot Customers," Operations Research, INFORMS, vol. 64(2), pages 406-415, April.
- Zhi-Long Chen & Nicholas G. Hall, 2010. "The Coordination of Pricing and Scheduling Decisions," Manufacturing & Service Operations Management, INFORMS, vol. 12(1), pages 77-92, April.
- Altendorfer, Klaus & Minner, Stefan, 2015. "Influence of order acceptance policies on optimal capacity investment with stochastic customer required lead times," European Journal of Operational Research, Elsevier, vol. 243(2), pages 555-565.
- Jinwen Ou & Xueling Zhong, 2017. "Order acceptance and scheduling with consideration of service level," Annals of Operations Research, Springer, vol. 248(1), pages 429-447, January.
- Gökçe Kahveciog̃lu & Barış Balcıog̃lu, 2016. "Coping with production time variability via dynamic lead-time quotation," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 877-898, October.
- Sabri Çelik & Costis Maglaras, 2008. "Dynamic Pricing and Lead-Time Quotation for a Multiclass Make-to-Order Queue," Management Science, INFORMS, vol. 54(6), pages 1132-1146, June.
- Zorzini, M. & Corti, D. & Pozzetti, A., 2008. "Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis," International Journal of Production Economics, Elsevier, vol. 112(2), pages 919-933, April.
- Slotnick, Susan A. & Sobel, Matthew J., 2005. "Manufacturing lead-time rules: Customer retention versus tardiness costs," European Journal of Operational Research, Elsevier, vol. 163(3), pages 825-856, June.
- Alarcón, F. & Alemany, M.M.E. & Ortiz, A., 2009. "Conceptual framework for the characterization of the order promising process in a collaborative selling network context," International Journal of Production Economics, Elsevier, vol. 120(1), pages 100-114, July.
More about this item
Keywords
Scheduling Order acceptance Job rejection Survey;Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:212:y:2011:i:1:p:1-11. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.