IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v74y2001i1-3p261-268.html
   My bibliography  Save this article

Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions

Author

Listed:
  • van Ooijen, H. P. G.
  • Bertrand, J. W. M.

Abstract

No abstract is available for this item.

Suggested Citation

  • van Ooijen, H. P. G. & Bertrand, J. W. M., 2001. "Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 261-268, December.
  • Handle: RePEc:eee:proeco:v:74:y:2001:i:1-3:p:261-268
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(01)00131-1
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Enns, S. T., 1994. "Job shop leadtime requirements under conditions of controlled delivery performance," European Journal of Operational Research, Elsevier, vol. 77(3), pages 429-439, September.
    2. Linguo Gong & Ton de Kok & Jie Ding, 1994. "Optimal Leadtimes Planning in a Serial Production System," Management Science, INFORMS, vol. 40(5), pages 629-632, May.
    3. Lawrence, Stephen R., 1994. "Negotiating due-dates between customers and producers," International Journal of Production Economics, Elsevier, vol. 37(1), pages 127-138, November.
    4. (Van) Enns, S. T., 1995. "An economic approach to job shop performance analysis," International Journal of Production Economics, Elsevier, vol. 38(2-3), pages 117-131, March.
    5. Cheng, T. C. E., 1991. "Optimal assignment of slack due-dates and sequencing of jobs with random processing times on a single machine," European Journal of Operational Research, Elsevier, vol. 51(3), pages 348-353, April.
    6. Kenneth R. Baker, 1984. "Sequencing Rules and Due-Date Assignments in a Job Shop," Management Science, INFORMS, vol. 30(9), pages 1093-1104, September.
    7. Abraham Seidmann & Milton L. Smith, 1981. "Due Date Assignment for Production Systems," Management Science, INFORMS, vol. 27(5), pages 571-581, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Corti, Donatella & Pozzetti, Alessandro & Zorzini, Marta, 2006. "A capacity-driven approach to establish reliable due dates in a MTO environment," International Journal of Production Economics, Elsevier, vol. 104(2), pages 536-554, December.
    2. Ozturk, Atakan & Kayaligil, Sinan & Ozdemirel, Nur E., 2006. "Manufacturing lead time estimation using data mining," European Journal of Operational Research, Elsevier, vol. 173(2), pages 683-700, September.
    3. Davide Mezzogori & Giovanni Romagnoli & Francesco Zammori, 2021. "Defining accurate delivery dates in make to order job-shops managed by workload control," Flexible Services and Manufacturing Journal, Springer, vol. 33(4), pages 956-991, December.
    4. Chan, Felix T. S. & Chung, S. H. & Wadhwa, Subhash, 2005. "A hybrid genetic algorithm for production and distribution," Omega, Elsevier, vol. 33(4), pages 345-355, August.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Enns, S. T., 1998. "Lead time selection and the behaviour of work flow in job shops," European Journal of Operational Research, Elsevier, vol. 109(1), pages 122-136, August.
    2. Bertrand, J. W. M. & van Ooijen, H. P. G., 2000. "Customer order lead times for production based on lead time and tardiness costs," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 257-265, March.
    3. (Van) Enns, S. T., 1995. "An economic approach to job shop performance analysis," International Journal of Production Economics, Elsevier, vol. 38(2-3), pages 117-131, March.
    4. Corti, Donatella & Pozzetti, Alessandro & Zorzini, Marta, 2006. "A capacity-driven approach to establish reliable due dates in a MTO environment," International Journal of Production Economics, Elsevier, vol. 104(2), pages 536-554, December.
    5. Kedar S. Naphade & S. David Wu & Robert H. Storer & Bhavin J. Doshi, 2001. "Melt Scheduling to Trade Off Material Waste and Shipping Performance," Operations Research, INFORMS, vol. 49(5), pages 629-645, October.
    6. Pinar Keskinocak & R. Ravi & Sridhar Tayur, 2001. "Scheduling and Reliable Lead-Time Quotation for Orders with Availability Intervals and Lead-Time Sensitive Revenues," Management Science, INFORMS, vol. 47(2), pages 264-279, February.
    7. Mark L. Spearman & Rachel Q. Zhang, 1999. "Optimal Lead Time Policies," Management Science, INFORMS, vol. 45(2), pages 290-295, February.
    8. Watanapa, Bunthit & Techanitisawad, Anulark, 2005. "Simultaneous price and due date settings for multiple customer classes," European Journal of Operational Research, Elsevier, vol. 166(2), pages 351-368, October.
    9. ElHafsi, Mohsen, 2000. "An operational decision model for lead-time and price quotation in congested manufacturing systems," European Journal of Operational Research, Elsevier, vol. 126(2), pages 355-370, October.
    10. Zorzini, M. & Corti, D. & Pozzetti, A., 2008. "Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis," International Journal of Production Economics, Elsevier, vol. 112(2), pages 919-933, April.
    11. Sarper, H. & Henry, M. C., 1996. "Combinatorial evaluation of six dispatching rules in a dynamic two-machine flow shop," Omega, Elsevier, vol. 24(1), pages 73-81, February.
    12. Enns, S. T., 2000. "Evaluating shop floor input control using rapid modeling," International Journal of Production Economics, Elsevier, vol. 63(3), pages 229-241, January.
    13. Azaron, Amir & Fynes, Brian & Modarres, Mohammad, 2011. "Due date assignment in repetitive projects," International Journal of Production Economics, Elsevier, vol. 129(1), pages 79-85, January.
    14. Diks, E. B. & de Kok, A. G., 1998. "Optimal control of a divergent multi-echelon inventory system," European Journal of Operational Research, Elsevier, vol. 111(1), pages 75-97, November.
    15. Thürer, Matthias & Stevenson, Mark & Silva, Cristovao & Qu, Ting, 2017. "Drum-buffer-rope and workload control in High-variety flow and job shops with bottlenecks: An assessment by simulation," International Journal of Production Economics, Elsevier, vol. 188(C), pages 116-127.
    16. Adenso-Diaz, Belarmino, 1996. "An SA/TS mixture algorithm for the scheduling tardiness problem," European Journal of Operational Research, Elsevier, vol. 88(3), pages 516-524, February.
    17. Lemos, R.F. & Ronconi, D.P., 2015. "Heuristics for the stochastic single-machine problem with E/T costs," International Journal of Production Economics, Elsevier, vol. 168(C), pages 131-142.
    18. Xia, Yu & Chen, Bintong & Yue, Jinfeng, 2008. "Job sequencing and due date assignment in a single machine shop with uncertain processing times," European Journal of Operational Research, Elsevier, vol. 184(1), pages 63-75, January.
    19. Sabuncuoglu, I. & Bayiz, M., 1999. "Job shop scheduling with beam search," European Journal of Operational Research, Elsevier, vol. 118(2), pages 390-412, October.
    20. Guinet, Alain & Legrand, Marie, 1998. "Reduction of job-shop problems to flow-shop problems with precedence constraints," European Journal of Operational Research, Elsevier, vol. 109(1), pages 96-110, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:74:y:2001:i:1-3:p:261-268. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.