IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v210y2011i3p527-536.html
   My bibliography  Save this article

Optimal and heuristic lead-time quotation for an integrated steel mill with a minimum batch size

Author

Listed:
  • Slotnick, Susan A.

Abstract

This paper presents a model of lead-time policies for a production system, such as an integrated steel mill, in which the bottleneck process requires a minimum batch size. An accurate understanding of internal lead-time quotations is necessary for making good customer delivery-date promises, which must take into account processing time, queueing time and time for arrival of the requisite volume of orders to complete the minimum batch size requirement. The problem is modeled as a stochastic dynamic program with a large state space. A computational study demonstrates that lead time for an arriving order should generally be a decreasing function of the amount of that product already on order (and waiting for minimum batch size to accumulate), which leads to a very fast and accurate heuristic. The computational study also provides insights into the relationship between lead-time quotation, arrival rate, and the sensitivity of customers to the length of delivery promises.

Suggested Citation

  • Slotnick, Susan A., 2011. "Optimal and heuristic lead-time quotation for an integrated steel mill with a minimum batch size," European Journal of Operational Research, Elsevier, vol. 210(3), pages 527-536, May.
  • Handle: RePEc:eee:ejores:v:210:y:2011:i:3:p:527-536
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(10)00629-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Izak Duenyas & Wallace J. Hopp, 1995. "Quoting Customer Lead Times," Management Science, INFORMS, vol. 41(1), pages 43-57, January.
    2. Barış Ata & Tava Lennon Olsen, 2009. "Near-Optimal Dynamic Lead-Time Quotation and Scheduling Under Convex-Concave Customer Delay Costs," Operations Research, INFORMS, vol. 57(3), pages 753-768, June.
    3. Slotnick, Susan A. & Sobel, Matthew J., 2005. "Manufacturing lead-time rules: Customer retention versus tardiness costs," European Journal of Operational Research, Elsevier, vol. 163(3), pages 825-856, June.
    4. Tang, Lixin & Liu, Jiyin & Rong, Aiying & Yang, Zihou, 2000. "A mathematical programming model for scheduling steelmaking-continuous casting production," European Journal of Operational Research, Elsevier, vol. 120(2), pages 423-435, January.
    5. Ferretti, Ivan & Zanoni, Simone & Zavanella, Lucio, 2006. "Production-inventory scheduling using Ant System metaheuristic," International Journal of Production Economics, Elsevier, vol. 104(2), pages 317-326, December.
    6. Sabri Çelik & Costis Maglaras, 2008. "Dynamic Pricing and Lead-Time Quotation for a Multiclass Make-to-Order Queue," Management Science, INFORMS, vol. 54(6), pages 1132-1146, June.
    7. Dorn, Jurgen & Girsch, Mario & Skele, Gunther & Slany, Wolfgang, 1996. "Comparison of iterative improvement techniques for schedule optimization," European Journal of Operational Research, Elsevier, vol. 94(2), pages 349-361, October.
    8. Tang, Lixin & Wang, Gongshu, 2008. "Decision support system for the batching problems of steelmaking and continuous-casting production," Omega, Elsevier, vol. 36(6), pages 976-991, December.
    9. Kedar S. Naphade & S. David Wu & Robert H. Storer & Bhavin J. Doshi, 2001. "Melt Scheduling to Trade Off Material Waste and Shipping Performance," Operations Research, INFORMS, vol. 49(5), pages 629-645, October.
    10. Cheng, T. C. E. & Gupta, M. C., 1989. "Survey of scheduling research involving due date determination decisions," European Journal of Operational Research, Elsevier, vol. 38(2), pages 156-166, January.
    11. Goutam Dutta & Robert Fourer, 2001. "A Survey of Mathematical Programming Applications in Integrated Steel Plants," Manufacturing & Service Operations Management, INFORMS, vol. 3(4), pages 387-400.
    12. Anantaram Balakrishnan & Joseph Geunes, 2003. "Production Planning with Flexible Product Specifications: An Application to Specialty Steel Manufacturing," Operations Research, INFORMS, vol. 51(1), pages 94-112, February.
    13. Tang, Lixin & Zhao, Yufang, 2008. "Scheduling a single semi-continuous batching machine," Omega, Elsevier, vol. 36(6), pages 992-1004, December.
    14. Zorzini, M. & Corti, D. & Pozzetti, A., 2008. "Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis," International Journal of Production Economics, Elsevier, vol. 112(2), pages 919-933, April.
    15. Roman Kapuscinski & Sridhar Tayur, 2007. "Reliable Due-Date Setting in a Capacitated MTO System with Two Customer Classes," Operations Research, INFORMS, vol. 55(1), pages 56-74, February.
    16. Erica L. Plambeck, 2004. "Optimal Leadtime Differentiation via Diffusion Approximations," Operations Research, INFORMS, vol. 52(2), pages 213-228, April.
    17. Fourer, Robert & Dutta, Goutam, 2000. "A Survey of Mathematical Programming Applications In Integrated Steel Plants," IIMA Working Papers WP2000-06-01, Indian Institute of Management Ahmedabad, Research and Publication Department.
    18. Tang, Lixin & Liu, Jiyin & Rong, Aiying & Yang, Zihou, 2001. "A review of planning and scheduling systems and methods for integrated steel production," European Journal of Operational Research, Elsevier, vol. 133(1), pages 1-20, August.
    19. Abhijit Upasani & Reha Uzsoy, 2008. "Incorporating manufacturing lead times in joint production-marketing models: A review and some future directions," Annals of Operations Research, Springer, vol. 161(1), pages 171-188, July.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Hongyan Li & Joern Meissner, 2018. "Capacity optimization and competition with cyclical and lead-time-dependent demands," Annals of Operations Research, Springer, vol. 271(2), pages 737-763, December.
    2. Dayong Han & Qiuhua Tang & Zikai Zhang & Zixiang Li, 2020. "An Improved Migrating Birds Optimization Algorithm for a Hybrid Flow Shop Scheduling within Steel Plants," Mathematics, MDPI, vol. 8(10), pages 1-28, September.
    3. Pourvaziri, Hani & Pierreval, Henri, 2017. "Dynamic facility layout problem based on open queuing network theory," European Journal of Operational Research, Elsevier, vol. 259(2), pages 538-553.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Lixin Tang & Ying Meng & Zhi-Long Chen & Jiyin Liu, 2016. "Coil Batching to Improve Productivity and Energy Utilization in Steel Production," Manufacturing & Service Operations Management, INFORMS, vol. 18(2), pages 262-279, May.
    2. A. Baykal Hafızoğlu & Esma S. Gel & Pınar Keskinocak, 2016. "Price and Lead Time Quotation for Contract and Spot Customers," Operations Research, INFORMS, vol. 64(2), pages 406-415, April.
    3. Gökçe Kahveciog̃lu & Barış Balcıog̃lu, 2016. "Coping with production time variability via dynamic lead-time quotation," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 877-898, October.
    4. Jiejian Feng & Liming Liu & Xiaoming Liu, 2011. "TECHNICAL NOTE---An Optimal Policy for Joint Dynamic Price and Lead-Time Quotation," Operations Research, INFORMS, vol. 59(6), pages 1523-1527, December.
    5. Philipp Afèche & Opher Baron & Yoav Kerner, 2013. "Pricing Time-Sensitive Services Based on Realized Performance," Manufacturing & Service Operations Management, INFORMS, vol. 15(3), pages 492-506, July.
    6. Barış Ata & Tava Lennon Olsen, 2009. "Near-Optimal Dynamic Lead-Time Quotation and Scheduling Under Convex-Concave Customer Delay Costs," Operations Research, INFORMS, vol. 57(3), pages 753-768, June.
    7. Mustafa Akan & Barı ş Ata & Tava Olsen, 2012. "Congestion-Based Lead-Time Quotation for Heterogenous Customers with Convex-Concave Delay Costs: Optimality of a Cost-Balancing Policy Based on Convex Hull Functions," Operations Research, INFORMS, vol. 60(6), pages 1505-1519, December.
    8. Secil Savasaneril & Ece Sayin, 2017. "Dynamic lead time quotation under responsive inventory and multiple customer classes," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 95-135, January.
    9. Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
    10. Lixin Tang & Gongshu Wang & Zhi-Long Chen, 2014. "Integrated Charge Batching and Casting Width Selection at Baosteel," Operations Research, INFORMS, vol. 62(4), pages 772-787, August.
    11. Tanja Mlinar & Philippe Chevalier, 2016. "Pooling heterogeneous products for manufacturing environments," 4OR, Springer, vol. 14(2), pages 173-200, June.
    12. Mor Armony & Erica Plambeck & Sridhar Seshadri, 2009. "Sensitivity of Optimal Capacity to Customer Impatience in an Unobservable M/M/S Queue (Why You Shouldn't Shout at the DMV)," Manufacturing & Service Operations Management, INFORMS, vol. 11(1), pages 19-32, June.
    13. Singer, Marcos & Donoso, Patricio, 2008. "Empirical validation of an activity-based optimization system," International Journal of Production Economics, Elsevier, vol. 113(1), pages 335-345, May.
    14. Torres, Nelson & Greivel, Gus & Betz, Joshua & Moreno, Eduardo & Newman, Alexandra & Thomas, Brian, 2024. "Optimizing steel coil production schedules under continuous casting and hot rolling," European Journal of Operational Research, Elsevier, vol. 314(2), pages 496-508.
    15. Weixin Shang & Liming Liu, 2011. "Promised Delivery Time and Capacity Games in Time-Based Competition," Management Science, INFORMS, vol. 57(3), pages 599-610, March.
    16. Zhang, Jian & Nault, Barrie R. & Tu, Yiliu, 2015. "A dynamic pricing strategy for a 3PL provider with heterogeneous customers," International Journal of Production Economics, Elsevier, vol. 169(C), pages 31-43.
    17. Benioudakis, Myron & Burnetas, Apostolos & Ioannou, George, 2021. "Lead-time quotations in unobservable make-to-order systems with strategic customers: Risk aversion, load control and profit maximization," European Journal of Operational Research, Elsevier, vol. 289(1), pages 165-176.
    18. Chevalier, Philippe & Lamas, Alejandro & Lu, Liang & Mlinar, Tanja, 2015. "Revenue management for operations with urgent orders," European Journal of Operational Research, Elsevier, vol. 240(2), pages 476-487.
    19. As'ad, Rami & Demirli, Kudret, 2010. "Production scheduling in steel rolling mills with demand substitution: Rolling horizon implementation and approximations," International Journal of Production Economics, Elsevier, vol. 126(2), pages 361-369, August.
    20. Zhu, Stuart X., 2015. "Integration of capacity, pricing, and lead-time decisions in a decentralized supply chain," International Journal of Production Economics, Elsevier, vol. 164(C), pages 14-23.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:210:y:2011:i:3:p:527-536. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.