Customer driven production planning
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Hendry, L. C. & Kingsman, B. G., 1989. "Production planning systems and their applicability to make-to-order companies," European Journal of Operational Research, Elsevier, vol. 40(1), pages 1-15, May.
- Framinan, Jose M. & Gonzalez, Pedro L. & Ruiz-Usano, Rafael, 2006. "Dynamic card controlling in a Conwip system," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 102-116, February.
- He, Q. -M. & Jewkes, E. M. & Buzacott, J., 2002. "Optimal and near-optimal inventory control policies for a make-to-order inventory-production system," European Journal of Operational Research, Elsevier, vol. 141(1), pages 113-132, August.
- Ozdamar, Linet & Yazgac, Tulin, 1997. "Capacity driven due date settings in make-to-order production systems," International Journal of Production Economics, Elsevier, vol. 49(1), pages 29-44, March.
- Kosonen, K. & Buhanist, P., 1995. "Customer focused lean production development," International Journal of Production Economics, Elsevier, vol. 41(1-3), pages 211-216, October.
- Duri, Christelle & Frein, Yannick & Lee, Hyo-Seong, 2000. "Performance evaluation and design of a CONWIP system with inspections," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 219-229, March.
- Tardif, Valerie & Maaseidvaag, Lars, 2001. "An adaptive approach to controlling kanban systems," European Journal of Operational Research, Elsevier, vol. 132(2), pages 411-424, July.
- Jodlbauer, Herbert & Stocher, Wolfgang, 2006. "Little's Law in a continuous setting," International Journal of Production Economics, Elsevier, vol. 103(1), pages 10-16, September.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Herbert Jodlbauer & Manuel Brunner & Nadine Bachmann & Shailesh Tripathi & Matthias Thürer, 2023. "Supply Chain Management: A Structured Narrative Review of Current Challenges and Recommendations for Action," Logistics, MDPI, vol. 7(4), pages 1-19, October.
- Jodlbauer, Herbert & Altendorfer, Klaus, 2010. "Trade-off between capacity invested and inventory needed," European Journal of Operational Research, Elsevier, vol. 203(1), pages 118-133, May.
- Hong, Paul & Jagani, Sandeep & Kim, Jinhwan & Youn, Sun Hee, 2019. "Managing sustainability orientation: An empirical investigation of manufacturing firms," International Journal of Production Economics, Elsevier, vol. 211(C), pages 71-81.
- Altendorfer, Klaus & Jodlbauer, Herbert, 2011. "Which utilization and service level lead to the maximum EVA?," International Journal of Production Economics, Elsevier, vol. 130(1), pages 16-26, March.
- Feng, Cheng-Min & Wu, Pei-Ju, 2009. "A tax savings model for the emerging global manufacturing network," International Journal of Production Economics, Elsevier, vol. 122(2), pages 534-546, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Lage Junior, Muris & Godinho Filho, Moacir, 2010. "Variations of the kanban system: Literature review and classification," International Journal of Production Economics, Elsevier, vol. 125(1), pages 13-21, May.
- Gosavi, Abhijit & Gosavi, Aparna A., 2024. "CONWIP control in the digitized world: The case of the cyber-physical jobshop," International Journal of Production Economics, Elsevier, vol. 270(C).
- Corti, Donatella & Pozzetti, Alessandro & Zorzini, Marta, 2006. "A capacity-driven approach to establish reliable due dates in a MTO environment," International Journal of Production Economics, Elsevier, vol. 104(2), pages 536-554, December.
- Kingsman, Brian G., 2000. "Modelling input-output workload control for dynamic capacity planning in production planning systems," International Journal of Production Economics, Elsevier, vol. 68(1), pages 73-93, October.
- Lavoie, P. & Gharbi, A. & Kenné, J.-P., 2010. "A comparative study of pull control mechanisms for unreliable homogenous transfer lines," International Journal of Production Economics, Elsevier, vol. 124(1), pages 241-251, March.
- repec:dgr:rugsom:02a72 is not listed on IDEAS
- Kim, Eungab, 2005. "Optimal inventory replenishment policy for a queueing system with finite waiting room capacity," European Journal of Operational Research, Elsevier, vol. 161(1), pages 256-274, February.
- Gautam, Naveen & Singh, Nanua, 2008. "Lean product development: Maximizing the customer perceived value through design change (redesign)," International Journal of Production Economics, Elsevier, vol. 114(1), pages 313-332, July.
- Wei Xu & Dong-Ping Song, 2022. "Integrated optimisation for production capacity, raw material ordering and production planning under time and quantity uncertainties based on two case studies," Operational Research, Springer, vol. 22(3), pages 2343-2371, July.
- Carravilla, Maria Antonia & de Sousa, Jorge Pinho, 1995. "Hierarchical production planning in a make-to-order company: A case study," European Journal of Operational Research, Elsevier, vol. 86(1), pages 43-56, October.
- Kedar S. Naphade & S. David Wu & Robert H. Storer & Bhavin J. Doshi, 2001. "Melt Scheduling to Trade Off Material Waste and Shipping Performance," Operations Research, INFORMS, vol. 49(5), pages 629-645, October.
- Wang, Shaojun & Sarker, Bhaba R., 2005. "An assembly-type supply chain system controlled by kanbans under a just-in-time delivery policy," European Journal of Operational Research, Elsevier, vol. 162(1), pages 153-172, April.
- Stevenson, Mark & Hendry, Linda C., 2006. "Aggregate load-oriented workload control: A review and a re-classification of a key approach," International Journal of Production Economics, Elsevier, vol. 104(2), pages 676-693, December.
- Jung Woo Baek, 2024. "On the Control Policy of a Queuing–Inventory System with Variable Inventory Replenishment Speed," Mathematics, MDPI, vol. 12(2), pages 1-19, January.
- Dellaert, N. P. & Melo, M. T., 1996. "Production strategies for a stochastic lot-sizing problem with constant capacity," European Journal of Operational Research, Elsevier, vol. 92(2), pages 281-301, July.
- Land, Martin & Gaalman, Gerard, 1996. "Workload control concepts in job shops A critical assessment," International Journal of Production Economics, Elsevier, vol. 46(1), pages 535-548, December.
- Weckenborg, Christian & Schumacher, Patrick & Thies, Christian & Spengler, Thomas S., 2024. "Flexibility in manufacturing system design: A review of recent approaches from Operations Research," European Journal of Operational Research, Elsevier, vol. 315(2), pages 413-441.
- Helia Yousefnejad & Maryam Esmaeili, 2020. "Tactical production planning in a hybrid MTS/MTO system using Stackelberg game," Operational Research, Springer, vol. 20(3), pages 1791-1809, September.
- Thürer, Matthias & Stevenson, Mark & Qu, Ting & Godinho Filho, Moacir, 2014. "The design of simple subcontracting rules for make-to-order shops: An assessment by simulation," European Journal of Operational Research, Elsevier, vol. 239(3), pages 854-864.
- Dellaert, N. P. & Melo, M. T., 1996. "Stochastic lot-sizing: Solution and heuristic methods," International Journal of Production Economics, Elsevier, vol. 46(1), pages 261-276, December.
- Colledani, Marcello & Tolio, Tullio, 2009. "Performance evaluation of production systems monitored by statistical process control and off-line inspections," International Journal of Production Economics, Elsevier, vol. 120(2), pages 348-367, August.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:111:y:2008:i:2:p:793-801. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.