IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v49y1997i1p29-44.html
   My bibliography  Save this article

Capacity driven due date settings in make-to-order production systems

Author

Listed:
  • Ozdamar, Linet
  • Yazgac, Tulin

Abstract

No abstract is available for this item.

Suggested Citation

  • Ozdamar, Linet & Yazgac, Tulin, 1997. "Capacity driven due date settings in make-to-order production systems," International Journal of Production Economics, Elsevier, vol. 49(1), pages 29-44, March.
  • Handle: RePEc:eee:proeco:v:49:y:1997:i:1:p:29-44
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(96)00116-8
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Tsubone, Hitoshi & Sugawara, Mitsumasa, 1987. "A hierarchical production planning system in the motor industry," Omega, Elsevier, vol. 15(2), pages 113-120.
    2. James K. Weeks & John S. Fryer, 1977. "A Methodology for Assigning Minimum Cost Due-Dates," Management Science, INFORMS, vol. 23(8), pages 872-881, April.
    3. Markland, R. E. & Darby-Dowman, K. H. & Minor, E. D., 1990. "Coordinated production scheduling for make-to-order manufacturing," European Journal of Operational Research, Elsevier, vol. 45(2-3), pages 155-176, April.
    4. Hendry, L. C. & Kingsman, B. G., 1989. "Production planning systems and their applicability to make-to-order companies," European Journal of Operational Research, Elsevier, vol. 40(1), pages 1-15, May.
    5. Chung, Chen-Hua & Chen, In-Jazz & Cheng, George L. Y., 1988. "Planning horizons for multi-item hierarchical production scheduling problems: A heuristic search procedure," European Journal of Operational Research, Elsevier, vol. 37(3), pages 368-377, December.
    6. Fumero, F. & Vercellis, C., 1994. "Capacity analysis in repetitive assemble-to-order manufacturing systems," European Journal of Operational Research, Elsevier, vol. 78(2), pages 204-215, October.
    7. Hegde, GG & Shang, JS & Tadikamalla, PR, 1991. "An integrated approach for production planning--A case study," Omega, Elsevier, vol. 19(5), pages 413-419.
    8. Axsater, Sven & Jonsson, Henrik, 1984. "Aggregation and disaggregation in hierarchical production planning," European Journal of Operational Research, Elsevier, vol. 17(3), pages 338-350, September.
    9. James K. Weeks, 1979. "A Simulation Study of Predictable Due-Dates," Management Science, INFORMS, vol. 25(4), pages 363-373, April.
    10. Tatsiopoulos, I. P. & Kingsman, B. G., 1983. "Lead time management," European Journal of Operational Research, Elsevier, vol. 14(4), pages 351-358, December.
    11. Carravilla, Maria Antonia & de Sousa, Jorge Pinho, 1995. "Hierarchical production planning in a make-to-order company: A case study," European Journal of Operational Research, Elsevier, vol. 86(1), pages 43-56, October.
    12. Kingsman, B. G. & Tatsiopoulos, I. P. & Hendry, L. C., 1989. "A structural methodology for managing manufacturing lead times in make-to-order companies," European Journal of Operational Research, Elsevier, vol. 40(2), pages 196-209, May.
    13. J. W. M. Bertrand, 1983. "The Effect of Workload Dependent Due-Dates on Job Shop Performance," Management Science, INFORMS, vol. 29(7), pages 799-816, July.
    14. Zapfel, Gunther & Missbauer, Hubert, 1993. "New concepts for production planning and control," European Journal of Operational Research, Elsevier, vol. 67(3), pages 297-320, June.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Kim, Bokang & Kim, Sooyoung, 2001. "Extended model for a hybrid production planning approach," International Journal of Production Economics, Elsevier, vol. 73(2), pages 165-173, September.
    2. Jodlbauer, H., 2008. "Customer driven production planning," International Journal of Production Economics, Elsevier, vol. 111(2), pages 793-801, February.
    3. Kedar S. Naphade & S. David Wu & Robert H. Storer & Bhavin J. Doshi, 2001. "Melt Scheduling to Trade Off Material Waste and Shipping Performance," Operations Research, INFORMS, vol. 49(5), pages 629-645, October.
    4. Turan Paksoy & Eren Özceylan & Gerhard-Wilhelm Weber, 2013. "Profit oriented supply chain network optimization," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 21(2), pages 455-478, March.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Kingsman, Brian G., 2000. "Modelling input-output workload control for dynamic capacity planning in production planning systems," International Journal of Production Economics, Elsevier, vol. 68(1), pages 73-93, October.
    2. Thürer, Matthias & Stevenson, Mark & Qu, Ting & Godinho Filho, Moacir, 2014. "The design of simple subcontracting rules for make-to-order shops: An assessment by simulation," European Journal of Operational Research, Elsevier, vol. 239(3), pages 854-864.
    3. Easton, Fred F. & Moodie, Douglas R., 1999. "Pricing and lead time decisions for make-to-order firms with contingent orders," European Journal of Operational Research, Elsevier, vol. 116(2), pages 305-318, July.
    4. Stevenson, Mark & Hendry, Linda C., 2006. "Aggregate load-oriented workload control: A review and a re-classification of a key approach," International Journal of Production Economics, Elsevier, vol. 104(2), pages 676-693, December.
    5. Land, Martin & Gaalman, Gerard, 1996. "Workload control concepts in job shops A critical assessment," International Journal of Production Economics, Elsevier, vol. 46(1), pages 535-548, December.
    6. Haskose, A. & Kingsman, B. G. & Worthington, D, 2004. "Performance analysis of make-to-order manufacturing systems under different workload control regimes," International Journal of Production Economics, Elsevier, vol. 90(2), pages 169-186, July.
    7. Land, Martin, 2006. "Parameters and sensitivity in workload control," International Journal of Production Economics, Elsevier, vol. 104(2), pages 625-638, December.
    8. repec:dgr:rugsom:95a42 is not listed on IDEAS
    9. Land, Martin J. & Gaalman, Gerard J.C., 1995. "Workload control concepts in job shops: a critical assessment," Research Report 95A42, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
    10. Ozdamar, Linet & Bozyel, M. Ali & Birbil, S. Ilker, 1998. "A hierarchical decision support system for production planning (with case study)," European Journal of Operational Research, Elsevier, vol. 104(3), pages 403-422, February.
    11. Raaymakers, W. H. M. & Weijters, A. J. M. M., 2003. "Makespan estimation in batch process industries: A comparison between regression analysis and neural networks," European Journal of Operational Research, Elsevier, vol. 145(1), pages 14-30, February.
    12. Vicens, E. & Alemany, M. E. & Andres, C. & Guarch, J. J., 2001. "A design and application methodology for hierarchical production planning decision support systems in an enterprise integration context," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 5-20, December.
    13. Pinar Keskinocak & R. Ravi & Sridhar Tayur, 2001. "Scheduling and Reliable Lead-Time Quotation for Orders with Availability Intervals and Lead-Time Sensitive Revenues," Management Science, INFORMS, vol. 47(2), pages 264-279, February.
    14. Dellaert, N. P. & Melo, M. T., 1996. "Production strategies for a stochastic lot-sizing problem with constant capacity," European Journal of Operational Research, Elsevier, vol. 92(2), pages 281-301, July.
    15. Sabuncuoglu, I. & Comlekci, A., 2002. "Operation-based flowtime estimation in a dynamic job shop," Omega, Elsevier, vol. 30(6), pages 423-442, December.
    16. Julia Pahl & Stefan Voß & David Woodruff, 2007. "Production planning with load dependent lead times: an update of research," Annals of Operations Research, Springer, vol. 153(1), pages 297-345, September.
    17. Hum, Sin-Hoon & Parlar, Mahmut & Zhou, Yun, 2018. "Measurement and optimization of responsiveness in supply chain networks with queueing structures," European Journal of Operational Research, Elsevier, vol. 264(1), pages 106-118.
    18. Mark L. Spearman & Rachel Q. Zhang, 1999. "Optimal Lead Time Policies," Management Science, INFORMS, vol. 45(2), pages 290-295, February.
    19. H.M. Raaymakers, Wenny & Will M. Bertrand, J. & C. Fransoo, Jan, 2001. "Makespan estimation in batch process industries using aggregate resource and job set characteristics," International Journal of Production Economics, Elsevier, vol. 70(2), pages 145-161, March.
    20. Missbauer, Hubert, 2011. "Order release planning with clearing functions: A queueing-theoretical analysis of the clearing function concept," International Journal of Production Economics, Elsevier, vol. 131(1), pages 399-406, May.
    21. Oosterman, Bas & Land, Martin, 1998. "The influence of shop characteristics on workload control," Research Report 98A28, University of Groningen, Research Institute SOM (Systems, Organisations and Management).

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:49:y:1997:i:1:p:29-44. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.