IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v141y2002i1p113-132.html
   My bibliography  Save this article

Optimal and near-optimal inventory control policies for a make-to-order inventory-production system

Author

Listed:
  • He, Q. -M.
  • Jewkes, E. M.
  • Buzacott, J.

Abstract

No abstract is available for this item.

Suggested Citation

  • He, Q. -M. & Jewkes, E. M. & Buzacott, J., 2002. "Optimal and near-optimal inventory control policies for a make-to-order inventory-production system," European Journal of Operational Research, Elsevier, vol. 141(1), pages 113-132, August.
  • Handle: RePEc:eee:ejores:v:141:y:2002:i:1:p:113-132
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(01)00257-0
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Rema Hariharan & Paul Zipkin, 1995. "Customer-Order Information, Leadtimes, and Inventories," Management Science, INFORMS, vol. 41(10), pages 1599-1607, October.
    2. Fangruo Chen & Yu-Sheng Zheng, 1994. "Evaluating Echelon Stock (R, nQ) Policies in Serial Production/Inventory Systems with Stochastic Demand," Management Science, INFORMS, vol. 40(10), pages 1262-1275, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Manafzadeh Dizbin, Nima & Tan, Barış, 2020. "Optimal control of production-inventory systems with correlated demand inter-arrival and processing times," International Journal of Production Economics, Elsevier, vol. 228(C).
    2. Jodlbauer, H., 2008. "Customer driven production planning," International Journal of Production Economics, Elsevier, vol. 111(2), pages 793-801, February.
    3. Sha, Yue & Zhang, Junlong & Cao, Hui, 2021. "Multistage stochastic programming approach for joint optimization of job scheduling and material ordering under endogenous uncertainties," European Journal of Operational Research, Elsevier, vol. 290(3), pages 886-900.
    4. Song, Dong-Ping & Dong, Jing-Xin & Xu, Jingjing, 2014. "Integrated inventory management and supplier base reduction in a supply chain with multiple uncertainties," European Journal of Operational Research, Elsevier, vol. 232(3), pages 522-536.
    5. Baek, Jung Woo & Bae, Yun Han, 2022. "A queuing-inventory model for manufacturing systems with fluid-type inventory," Omega, Elsevier, vol. 111(C).
    6. Kim, Eungab, 2005. "Optimal inventory replenishment policy for a queueing system with finite waiting room capacity," European Journal of Operational Research, Elsevier, vol. 161(1), pages 256-274, February.
    7. Zhao, Ning & Lian, Zhaotong, 2011. "A queueing-inventory system with two classes of customers," International Journal of Production Economics, Elsevier, vol. 129(1), pages 225-231, January.
    8. Wei Xu & Dong-Ping Song, 2022. "Integrated optimisation for production capacity, raw material ordering and production planning under time and quantity uncertainties based on two case studies," Operational Research, Springer, vol. 22(3), pages 2343-2371, July.
    9. Jung Woo Baek, 2024. "On the Control Policy of a Queuing–Inventory System with Variable Inventory Replenishment Speed," Mathematics, MDPI, vol. 12(2), pages 1-19, January.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Li, Xiuhui & Wang, Qinan, 2007. "Coordination mechanisms of supply chain systems," European Journal of Operational Research, Elsevier, vol. 179(1), pages 1-16, May.
    2. Fangruo Chen, 1998. "Echelon Reorder Points, Installation Reorder Points, and the Value of Centralized Demand Information," Management Science, INFORMS, vol. 44(12-Part-2), pages 221-234, December.
    3. Liberopoulos, George, 2008. "On the tradeoff between optimal order-base-stock levels and demand lead-times," European Journal of Operational Research, Elsevier, vol. 190(1), pages 136-155, October.
    4. Hausman, Warren H. & Lee, Hau L. & Zhang, Alex X., 1998. "Joint demand fulfillment probability in a multi-item inventory system with independent order-up-to policies," European Journal of Operational Research, Elsevier, vol. 109(3), pages 646-659, September.
    5. Huang, Shuo & Axsäter, Sven & Dou, Yifan & Chen, Jian, 2011. "A real-time decision rule for an inventory system with committed service time and emergency orders," European Journal of Operational Research, Elsevier, vol. 215(1), pages 70-79, November.
    6. Kaijie Zhu & Ulrich W. Thonemann, 2004. "Modeling the Benefits of Sharing Future Demand Information," Operations Research, INFORMS, vol. 52(1), pages 136-147, February.
    7. Bendre, Abhijit Bhagwan & Nielsen, Lars Relund, 2013. "Inventory control in a lost-sales setting with information about supply lead times," International Journal of Production Economics, Elsevier, vol. 142(2), pages 324-331.
    8. Ke Fu & Vernon Ning Hsu & Chung-Yee Lee, 2006. "Inventory and Production Decisions for an Assemble-to-Order System with Uncertain Demand and Limited Assembly Capacity," Operations Research, INFORMS, vol. 54(6), pages 1137-1150, December.
    9. van Houtum, G. J. & Inderfurth, K. & Zijm, W. H. M., 1996. "Materials coordination in stochastic multi-echelon systems," European Journal of Operational Research, Elsevier, vol. 95(1), pages 1-23, November.
    10. Wei Xu & Dong-Ping Song, 2022. "Integrated optimisation for production capacity, raw material ordering and production planning under time and quantity uncertainties based on two case studies," Operational Research, Springer, vol. 22(3), pages 2343-2371, July.
    11. Yingdong Lu & Jing-Sheng Song & David D. Yao, 2003. "Order Fill Rate, Leadtime Variability, and Advance Demand Information in an Assemble-to-Order System," Operations Research, INFORMS, vol. 51(2), pages 292-308, April.
    12. Du, Bisheng & Larsen, Christian, 2008. "Base stock policies with degraded service to larger orders," CORAL Working Papers L-2008-07, University of Aarhus, Aarhus School of Business, Department of Business Studies.
    13. repec:dau:papers:123456789/522 is not listed on IDEAS
    14. Noel Watson & Yu-Sheng Zheng, 2005. "Decentralized Serial Supply Chains Subject to Order Delays and Information Distortion: Exploiting Real-Time Sales Data," Manufacturing & Service Operations Management, INFORMS, vol. 7(2), pages 152-168, May.
    15. Yanfeng Ouyang & Carlos Daganzo, 2006. "Characterization of the Bullwhip Effect in Linear, Time-Invariant Supply Chains: Some Formulae and Tests," Management Science, INFORMS, vol. 52(10), pages 1544-1556, October.
    16. Zhu, Sha & Jaarsveld, Willem van & Dekker, Rommert, 2020. "Spare parts inventory control based on maintenance planning," Reliability Engineering and System Safety, Elsevier, vol. 193(C).
    17. Sang M. Lee & David L. Olson & Sang-Heui Lee & Taewon Hwang & Matt S. Shin, 2007. "Entrepreneurial applications of the lean approach to service industries," The Service Industries Journal, Taylor & Francis Journals, vol. 28(7), pages 973-987, November.
    18. Kevin H. Shang & Jing-Sheng Song, 2007. "Serial Supply Chains with Economies of Scale: Bounds and Approximations," Operations Research, INFORMS, vol. 55(5), pages 843-853, October.
    19. Bian, Wenliang & Shang, Jennifer & Zhang, Juliang, 2016. "Two-way information sharing under supply chain competition," International Journal of Production Economics, Elsevier, vol. 178(C), pages 82-94.
    20. Lin, X. & Basten, R.J.I. & Kranenburg, A.A. & van Houtum, G.J., 2017. "Condition based spare parts supply," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 240-248.
    21. Taher Ahmadi & Zümbül Atan & Ton Kok & Ivo Adan, 2020. "Time-based service constraints for inventory systems with commitment lead time," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 42(2), pages 355-395, June.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:141:y:2002:i:1:p:113-132. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.