IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v115y1999i2p219-236.html
   My bibliography  Save this article

Integrated production/distribution planning in supply chains: An invited review

Author

Listed:
  • Erenguc, S. Selcuk
  • Simpson, N. C.
  • Vakharia, Asoo J.

Abstract

No abstract is available for this item.

Suggested Citation

  • Erenguc, S. Selcuk & Simpson, N. C. & Vakharia, Asoo J., 1999. "Integrated production/distribution planning in supply chains: An invited review," European Journal of Operational Research, Elsevier, vol. 115(2), pages 219-236, June.
  • Handle: RePEc:eee:ejores:v:115:y:1999:i:2:p:219-236
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(98)90299-5
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Tony J. Van Roy, 1986. "A Cross Decomposition Algorithm for Capacitated Facility Location," Operations Research, INFORMS, vol. 34(1), pages 145-163, February.
    2. William W. Trigeiro & L. Joseph Thomas & John O. McClain, 1989. "Capacitated Lot Sizing with Setup Times," Management Science, INFORMS, vol. 35(3), pages 353-366, March.
    3. Weber, Charles A. & Current, John R. & Benton, W. C., 1991. "Vendor selection criteria and methods," European Journal of Operational Research, Elsevier, vol. 50(1), pages 2-18, January.
    4. Peter J. Billington & John O. McClain & L. Joseph Thomas, 1983. "Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction," Management Science, INFORMS, vol. 29(10), pages 1126-1141, October.
    5. Lu Lu & Marc E. Posner, 1994. "Approximation Procedures for the One-Warehouse Multi-Retailer System," Management Science, INFORMS, vol. 40(10), pages 1305-1316, October.
    6. Leroy B. Schwarz & Linus Schrage, 1975. "Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems," Management Science, INFORMS, vol. 21(11), pages 1285-1294, July.
    7. Bourland, Karla E. & Powell, Stephen G. & Pyke, David F., 1996. "Exploiting timely demand information to reduce inventories," European Journal of Operational Research, Elsevier, vol. 92(2), pages 239-253, July.
    8. Leroy B. Schwarz, 1973. "A Simple Continuous Review Deterministic One-Warehouse N-Retailer Inventory Problem," Management Science, INFORMS, vol. 19(5), pages 555-566, January.
    9. Joseph D. Blackburn & Dean H. Kropp & Robert A. Millen, 1986. "A Comparison of Strategies to Dampen Nervousness in MRP Systems," Management Science, INFORMS, vol. 32(4), pages 413-429, April.
    10. Joseph D. Blackburn & Robert A. Millen, 1982. "Improved Heuristics for Multi-Stage Requirements Planning Systems," Management Science, INFORMS, vol. 28(1), pages 44-56, January.
    11. Robin O. Roundy, 1993. "Efficient, Effective Lot Sizing for Multistage Production Systems," Operations Research, INFORMS, vol. 41(2), pages 371-385, April.
    12. Stephen C. Graves, 1996. "A Multiechelon Inventory Model with Fixed Replenishment Intervals," Management Science, INFORMS, vol. 42(1), pages 1-18, January.
    13. Leroy B. Schwarz & Bryan L. Deuermeyer & Ralph D. Badinelli, 1985. "Fill-Rate Optimization in a One-Warehouse N-Identical Retailer Distribution System," Management Science, INFORMS, vol. 31(4), pages 488-498, April.
    14. Steven Nahmias & Stephen A. Smith, 1994. "Optimizing Inventory Levels in a Two-Echelon Retailer System with Partial Lost Sales," Management Science, INFORMS, vol. 40(5), pages 582-596, May.
    15. Hau L. Lee & V. Padmanabhan & Seungjin Whang, 1997. "Information Distortion in a Supply Chain: The Bullwhip Effect," Management Science, INFORMS, vol. 43(4), pages 546-558, April.
    16. Wallace B. Crowston & Michael Wagner & Jack F. Williams, 1973. "Economic Lot Size Determination in Multi-Stage Assembly Systems," Management Science, INFORMS, vol. 19(5), pages 517-527, January.
    17. Maes, Johan & McClain, John O. & Van Wassenhove, Luk N., 1991. "Multilevel capacitated lotsizing complexity and LP-based heuristics," European Journal of Operational Research, Elsevier, vol. 53(2), pages 131-148, July.
    18. Panayotis Afentakis & Bezalel Gavish, 1986. "Optimal Lot-Sizing Algorithms for Complex Product Structures," Operations Research, INFORMS, vol. 34(2), pages 237-249, April.
    19. Lawrence D. Burns & Randolph W. Hall & Dennis E. Blumenfeld & Carlos F. Daganzo, 1985. "Distribution Strategies that Minimize Transportation and Inventory Costs," Operations Research, INFORMS, vol. 33(3), pages 469-490, June.
    20. Horst Tempelmeier & Matthias Derstroff, 1996. "A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times," Management Science, INFORMS, vol. 42(5), pages 738-757, May.
    21. John A. Muckstadt & Robin O. Roundy, 1987. "Multi-Item, One-Warehouse, Multi-Retailer Distribution Systems," Management Science, INFORMS, vol. 33(12), pages 1613-1621, December.
    22. A. M. Geoffrion & G. W. Graves, 1974. "Multicommodity Distribution System Design by Benders Decomposition," Management Science, INFORMS, vol. 20(5), pages 822-844, January.
    23. Arthur F. Veinott, 1969. "Minimum Concave-Cost Solution of Leontief Substitution Models of Multi-Facility Inventory Systems," Operations Research, INFORMS, vol. 17(2), pages 262-291, April.
    24. Robin Roundy, 1985. "98%-Effective Integer-Ratio Lot-Sizing for One-Warehouse Multi-Retailer Systems," Management Science, INFORMS, vol. 31(11), pages 1416-1430, November.
    25. Umit Akinc & Basheer M. Khumawala, 1977. "An Efficient Branch and Bound Algorithm for the Capacitated Warehouse Location Problem," Management Science, INFORMS, vol. 23(6), pages 585-594, February.
    26. S. Anily & A. Federgruen, 1990. "One Warehouse Multiple Retailer Systems with Vehicle Routing Costs," Management Science, INFORMS, vol. 36(1), pages 92-114, January.
    27. William L. Maxwell & John A. Muckstadt, 1985. "Establishing Consistent and Realistic Reorder Intervals in Production-Distribution Systems," Operations Research, INFORMS, vol. 33(6), pages 1316-1341, December.
    28. Paul Iyogun & Derek Atkins, 1993. "A Lower Bound and an Efficient Heuristic for Multistage Multiproduct Distribution Systems," Management Science, INFORMS, vol. 39(2), pages 204-217, February.
    29. Hau L. Lee & Corey Billington, 1993. "Material Management in Decentralized Supply Chains," Operations Research, INFORMS, vol. 41(5), pages 835-847, October.
    30. Clarence H. Martin & Denver C. Dent & James C. Eckhart, 1993. "Integrated Production, Distribution, and Inventory Planning at Libbey-Owens-Ford," Interfaces, INFORMS, vol. 23(3), pages 68-78, June.
    31. Panayotis Afentakis & Bezalel Gavish & Uday Karmarkar, 1984. "Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems," Management Science, INFORMS, vol. 30(2), pages 222-239, February.
    32. Thomas, Douglas J. & Griffin, Paul M., 1996. "Coordinated supply chain management," European Journal of Operational Research, Elsevier, vol. 94(1), pages 1-15, October.
    33. Bruce Kogut & Nalin Kulatilaka, 1994. "Operating Flexibility, Global Manufacturing, and the Option Value of a Multinational Network," Management Science, INFORMS, vol. 40(1), pages 123-139, January.
    34. Basil A. Kalymon, 1972. "A Decomposition Algorithm for Arborescence Inventory Systems," Operations Research, INFORMS, vol. 20(4), pages 860-874, August.
    35. Guillermo Gallego & Maurice Queyranne & David Simchi-Levi, 1996. "Single Resource Multi-Item Inventory Systems," Operations Research, INFORMS, vol. 44(4), pages 580-595, August.
    36. Imre Barany & Tony J. Van Roy & Laurence A. Wolsey, 1984. "Strong Formulations for Multi-Item Capacitated Lot Sizing," Management Science, INFORMS, vol. 30(10), pages 1255-1261, October.
    37. Edward J. McGavin & Leroy B. Schwarz & James E. Ward, 1993. "Two-Interval Inventory-Allocation Policies in a One-Warehouse N-Identical-Retailer Distribution System," Management Science, INFORMS, vol. 39(9), pages 1092-1107, September.
    38. Hodder, James E. & Jucker, James V., 1985. "A simple plant-location model for quantity-setting firms subject to price uncertainty," European Journal of Operational Research, Elsevier, vol. 21(1), pages 39-41, July.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    2. Li, Xiuhui & Wang, Qinan, 2007. "Coordination mechanisms of supply chain systems," European Journal of Operational Research, Elsevier, vol. 179(1), pages 1-16, May.
    3. Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
    4. Lee, Dong Joo & Jeong, In-Jae, 2010. "A distributed coordination for a single warehouse-multiple retailer problem under private information," International Journal of Production Economics, Elsevier, vol. 125(1), pages 190-199, May.
    5. N.C. Simpson & S. Selcuk Erenguc, 2005. "Modeling multiple stage manufacturing systems with generalized costs and capacity issues," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(6), pages 560-570, September.
    6. Simpson, N. C., 1999. "Multiple level production planning in rolling horizon assembly environments," European Journal of Operational Research, Elsevier, vol. 114(1), pages 15-28, April.
    7. Gérard P. Cachon, 1999. "Managing Supply Chain Demand Variability with Scheduled Ordering Policies," Management Science, INFORMS, vol. 45(6), pages 843-856, June.
    8. Adeinat, Hamza & Pazhani, Subramanian & Mendoza, Abraham & Ventura, Jose A., 2022. "Coordination of pricing and inventory replenishment decisions in a supply chain with multiple geographically dispersed retailers," International Journal of Production Economics, Elsevier, vol. 248(C).
    9. A. Kimms, 1997. "Demand shuffle—A method for multilevel proportional lot sizing and scheduling," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(4), pages 319-340, June.
    10. Chu, Chi-Leung & Leon, V. Jorge, 2008. "Power-of-two single-warehouse multi-buyer inventory coordination with private information," International Journal of Production Economics, Elsevier, vol. 111(2), pages 562-574, February.
    11. dos Santos-Meza, Elisangela & Oliveira dos Santos, Maristela & Nereu Arenales, Marcos, 2002. "A lot-sizing problem in an automated foundry," European Journal of Operational Research, Elsevier, vol. 139(3), pages 490-500, June.
    12. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    13. Gérard P. Cachon, 2001. "Exact Evaluation of Batch-Ordering Inventory Policies in Two-Echelon Supply Chains with Periodic Review," Operations Research, INFORMS, vol. 49(1), pages 79-98, February.
    14. Kevin H. Shang & Zhijie Tao & Sean X. Zhou, 2015. "Optimizing Reorder Intervals for Two-Echelon Distribution Systems with Stochastic Demand," Operations Research, INFORMS, vol. 63(2), pages 458-475, April.
    15. Shiman Ding & Philip M. Kaminsky, 2020. "Centralized and Decentralized Warehouse Logistics Collaboration," Manufacturing & Service Operations Management, INFORMS, vol. 22(4), pages 812-831, July.
    16. Mazzola, Joseph B. & Neebe, Alan W., 1999. "Lagrangian-relaxation-based solution procedures for a multiproduct capacitated facility location problem with choice of facility type," European Journal of Operational Research, Elsevier, vol. 115(2), pages 285-299, June.
    17. Anton J. Kleywegt & Vijay S. Nori & Martin W. P. Savelsbergh, 2002. "The Stochastic Inventory Routing Problem with Direct Deliveries," Transportation Science, INFORMS, vol. 36(1), pages 94-118, February.
    18. Ian R. Webb & Bruce R. Buzby & Gerard M. Campbell, 1997. "Cyclical schedules for the joint replenishment problem with dynamic demands," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(6), pages 577-589, September.
    19. Sarker, Bhaba R. & Diponegoro, Ahmad, 2009. "Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers," European Journal of Operational Research, Elsevier, vol. 194(3), pages 753-773, May.
    20. K. Balaji Reddy & S. Narayanan & S.R. Raju, 2012. "A staggered ordering model for push demand case in a supply chain of the confectionery industry: a case study," International Journal of Business Performance Management, Inderscience Enterprises Ltd, vol. 13(1), pages 87-102.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:115:y:1999:i:2:p:219-236. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.