IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v127y2010i1p85-94.html
   My bibliography  Save this article

Evaluation of joint replenishment lot-sizing procedures in rolling horizon planning systems

Author

Listed:
  • Narayanan, Arunachalam
  • Robinson, Powell

Abstract

Joint replenishment problems are commonly encountered in purchasing, manufacturing, and transportation planning. Literature evaluates various algorithmic approaches for solving the joint replenishment problem in a static environment, but their relative performance in a dynamic rolling horizon system is unknown. This research experimentally evaluates nine joint replenishment lot-sizing heuristics and policy design variables when implemented in a dynamic rolling schedule environment. The findings indicate that a single algorithm does excel on both dimensions of schedule cost and stability. Hence, management must trade off these two performance metrics when choosing the best approach for their specific problem. Generally, metaheuristics provide the best cost replenishment schedule, but forward pass based heuristics yield the most stable schedules. The results also indicate that the choice of lot-sizing heuristic is the major cost performance driver in rolling planning systems, with policy design variables (frozen interval and planning horizon length) having little impact. While the simulated annealing heuristic of Robinson et al. (2007a) is the most effective solution procedure for the static joint replenishment problem, the perturbation metaheuristic of Boctor et al. (2004) produces lower schedule costs and greater stability in rolling schedule environments.

Suggested Citation

  • Narayanan, Arunachalam & Robinson, Powell, 2010. "Evaluation of joint replenishment lot-sizing procedures in rolling horizon planning systems," International Journal of Production Economics, Elsevier, vol. 127(1), pages 85-94, September.
  • Handle: RePEc:eee:proeco:v:127:y:2010:i:1:p:85-94
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(10)00171-4
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Robinson, Powell & Narayanan, Arunachalam & Sahin, Funda, 2009. "Coordinated deterministic dynamic demand lot-sizing problem: A review of models and algorithms," Omega, Elsevier, vol. 37(1), pages 3-15, February.
    2. Khouja, Moutaz & Goyal, Suresh, 2008. "A review of the joint replenishment problem literature: 1989-2005," European Journal of Operational Research, Elsevier, vol. 186(1), pages 1-16, April.
    3. Marshall Fisher & Kamalini Ramdas & Yu-Sheng Zheng, 2001. "Ending Inventory Valuation in Multiperiod Production Scheduling," Management Science, INFORMS, vol. 47(5), pages 679-692, May.
    4. Rolf A. Lundin & Thomas E. Morton, 1975. "Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results," Operations Research, INFORMS, vol. 23(4), pages 711-734, August.
    5. Sahin, Funda & Powell Robinson, E. & Gao, Li-Lian, 2008. "Master production scheduling policy and rolling schedules in a two-stage make-to-order supply chain," International Journal of Production Economics, Elsevier, vol. 115(2), pages 528-541, October.
    6. Joseph D. Blackburn & Dean H. Kropp & Robert A. Millen, 1986. "A Comparison of Strategies to Dampen Nervousness in MRP Systems," Management Science, INFORMS, vol. 32(4), pages 413-429, April.
    7. Awi Federgruen & Joern Meissner & Michal Tzur, 2007. "Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems," Operations Research, INFORMS, vol. 55(3), pages 490-502, June.
    8. Simpson, N. C., 1999. "Multiple level production planning in rolling horizon assembly environments," European Journal of Operational Research, Elsevier, vol. 114(1), pages 15-28, April.
    9. Xie, Jinxing & Zhao, Xiande & Lee, T. S., 2003. "Freezing the master production schedule under single resource constraint and demand uncertainty," International Journal of Production Economics, Elsevier, vol. 83(1), pages 65-84, January.
    10. E. Powell Robinson, Jr. & Li-Lian Gao, 1996. "A Dual Ascent Procedure for Multiproduct Dynamic Demand Coordinated Replenishment with Backlogging," Management Science, INFORMS, vol. 42(11), pages 1556-1564, November.
    11. Zhao, Xiande & Lam, Kokin, 1997. "Lot-sizing rules and freezing the master production schedule in material requirements planning systems," International Journal of Production Economics, Elsevier, vol. 53(3), pages 281-305, December.
    12. Stadtler, Hartmut, 2000. "Improved rolling schedules for the dynamic single level lot sizing problem," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 14079, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    13. Hartmut Stadtler, 2000. "Improved Rolling Schedules for the Dynamic Single-Level Lot-Sizing Problem," Management Science, INFORMS, vol. 46(2), pages 318-326, February.
    14. E P Robinson & A Narayanan & L-L Gao, 2007. "Effective heuristics for the dynamic demand joint replenishment problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(6), pages 808-815, June.
    15. Goyal, Suresh K. & Satir, Ahmet T., 1989. "Joint replenishment inventory control: Deterministic and stochastic models," European Journal of Operational Research, Elsevier, vol. 38(1), pages 2-13, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Guerrero, W.J. & Yeung, T.G. & Guéret, C., 2013. "Joint-optimization of inventory policies on a multi-product multi-echelon pharmaceutical system with batching and ordering constraints," European Journal of Operational Research, Elsevier, vol. 231(1), pages 98-108.
    2. Toy, Ayhan Özgür & Berk, Emre, 2013. "Dynamic lot sizing for a warm/cold process: Heuristics and insights," International Journal of Production Economics, Elsevier, vol. 145(1), pages 53-66.
    3. Sivadasan, Suja & Smart, Janet & Huaccho Huatuco, Luisa & Calinescu, Anisoara, 2013. "Reducing schedule instability by identifying and omitting complexity-adding information flows at the supplier–customer interface," International Journal of Production Economics, Elsevier, vol. 145(1), pages 253-262.
    4. Vanajakumari, Manoj & Sun, Haoying & Jones, Ashley & Sriskandarajah, Chelliah, 2022. "Supply chain planning: A case for Hybrid Cross-Docks," Omega, Elsevier, vol. 108(C).
    5. Wang, Lin & He, Jing & Wu, Desheng & Zeng, Yu-Rong, 2012. "A novel differential evolution algorithm for joint replenishment problem under interdependence and its application," International Journal of Production Economics, Elsevier, vol. 135(1), pages 190-198.
    6. G. Rius-Sorolla & J. Maheut & S. Estellés-Miguel & J. P. García-Sabater, 2021. "Operations planning test bed under rolling horizons, multiproduct, multiechelon, multiprocess for capacitated production planning modelling with strokes," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 29(4), pages 1289-1315, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Sahin, Funda & Powell Robinson, E. & Gao, Li-Lian, 2008. "Master production scheduling policy and rolling schedules in a two-stage make-to-order supply chain," International Journal of Production Economics, Elsevier, vol. 115(2), pages 528-541, October.
    2. Wang, Lin & He, Jing & Wu, Desheng & Zeng, Yu-Rong, 2012. "A novel differential evolution algorithm for joint replenishment problem under interdependence and its application," International Journal of Production Economics, Elsevier, vol. 135(1), pages 190-198.
    3. Meixell, Mary J., 2005. "The impact of setup costs, commonality, and capacity on schedule stability: An exploratory study," International Journal of Production Economics, Elsevier, vol. 95(1), pages 95-107, January.
    4. Nguyen, Christine & Dessouky, Maged & Toriello, Alejandro, 2014. "Consolidation strategies for the delivery of perishable products," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 69(C), pages 108-121.
    5. G. Rius-Sorolla & J. Maheut & S. Estellés-Miguel & J. P. García-Sabater, 2021. "Operations planning test bed under rolling horizons, multiproduct, multiechelon, multiprocess for capacitated production planning modelling with strokes," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 29(4), pages 1289-1315, December.
    6. repec:dau:papers:123456789/2078 is not listed on IDEAS
    7. Hartmut Stadtler & Malte Meistering, 2019. "Model formulations for the capacitated lot-sizing problem with service-level constraints," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 1025-1056, December.
    8. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
    9. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    10. Narayanan, Arunachalam & Robinson, Powell, 2010. "Efficient and effective heuristics for the coordinated capacitated lot-size problem," European Journal of Operational Research, Elsevier, vol. 203(3), pages 583-592, June.
    11. Mohammad Ebrahim Arbabian & Shi Chen & Kamran Moinzadeh, 2021. "Capacity Expansions with Bundled Supplies of Attributes: An Application to Server Procurement in Cloud Computing," Manufacturing & Service Operations Management, INFORMS, vol. 23(1), pages 191-209, 1-2.
    12. Jeunet, Jully, 2006. "Demand forecast accuracy and performance of inventory policies under multi-level rolling schedule environments," International Journal of Production Economics, Elsevier, vol. 103(1), pages 401-419, September.
    13. Saravanan Venkatachalam & Arunachalam Narayanan, 2016. "Efficient formulation and heuristics for multi-item single source ordering problem with transportation cost," International Journal of Production Research, Taylor & Francis Journals, vol. 54(14), pages 4087-4103, July.
    14. Baller, Annelieke C. & Dabia, Said & Dullaert, Wout E.H. & Vigo, Daniele, 2019. "The Dynamic-Demand Joint Replenishment Problem with Approximated Transportation Costs," European Journal of Operational Research, Elsevier, vol. 276(3), pages 1013-1033.
    15. Charles, Mehdi & Dauzère-Pérès, Stéphane & Kedad-Sidhoum, Safia & Mazhoud, Issam, 2022. "Motivations and analysis of the capacitated lot-sizing problem with setup times and minimum and maximum ending inventories," European Journal of Operational Research, Elsevier, vol. 302(1), pages 203-220.
    16. Toy, Ayhan Özgür & Berk, Emre, 2013. "Dynamic lot sizing for a warm/cold process: Heuristics and insights," International Journal of Production Economics, Elsevier, vol. 145(1), pages 53-66.
    17. Christopher Suerie & Hartmut Stadtler, 2003. "The Capacitated Lot-Sizing Problem with Linked Lot Sizes," Management Science, INFORMS, vol. 49(8), pages 1039-1054, August.
    18. de Sampaio, Raimundo J.B. & Wollmann, Rafael R.G. & Vieira, Paula F.G., 2017. "A flexible production planning for rolling-horizons," International Journal of Production Economics, Elsevier, vol. 190(C), pages 31-36.
    19. Carlos Herrera & Sana Belmokhtar-Berraf & André Thomas & Víctor Parada, 2016. "A reactive decision-making approach to reduce instability in a master production schedule," International Journal of Production Research, Taylor & Francis Journals, vol. 54(8), pages 2394-2404, April.
    20. Pundoor, Guruprasad & Chen, Zhi-Long, 2009. "Joint cyclic production and delivery scheduling in a two-stage supply chain," International Journal of Production Economics, Elsevier, vol. 119(1), pages 55-74, May.
    21. Robinson, Powell & Narayanan, Arunachalam & Sahin, Funda, 2009. "Coordinated deterministic dynamic demand lot-sizing problem: A review of models and algorithms," Omega, Elsevier, vol. 37(1), pages 3-15, February.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:127:y:2010:i:1:p:85-94. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.