IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v200y2010i1p85-98.html
   My bibliography  Save this article

A disjunctive graph model and framework for constructing new train schedules

Author

Listed:
  • Burdett, R.L.
  • Kozan, E.

Abstract

Train scheduling is a complex and time consuming task of vital importance in many countries. To create completely new train schedules that are more accurate and efficient than permitted by current techniques, a novel "hybrid" job shop approach is proposed and implemented in this paper. Unique characteristics of train scheduling are firstly incorporated into a disjunctive graph representation of the solution. Dedicated "stand-alone" constructive algorithms that utilise this representation are then developed. The modelling approach and the constructive algorithms are essential as they provide the basis for which meta-heuristics and other iterative refinement algorithms can be applied. A numerical investigation and case study is provided and demonstrates the viability of the modelling approach. Furthermore it is demonstrated that good quality solutions are provided with reasonable computational effort.

Suggested Citation

  • Burdett, R.L. & Kozan, E., 2010. "A disjunctive graph model and framework for constructing new train schedules," European Journal of Operational Research, Elsevier, vol. 200(1), pages 85-98, January.
  • Handle: RePEc:eee:ejores:v:200:y:2010:i:1:p:85-98
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(08)01046-1
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Bunte, F.H.J. & Maks, J.A.H., 1997. "Contestability and sunk costs: an analysis of product R+D competition," Research Memorandum 015, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
    2. Ghoseiri, Keivan & Szidarovszky, Ferenc & Asgharpour, Mohammad Jawad, 2004. "A multi-objective train scheduling model and solution," Transportation Research Part B: Methodological, Elsevier, vol. 38(10), pages 927-952, December.
    3. Leo G. Kroon & Leon W. P. Peeters, 2003. "A Variable Trip Time Model for Cyclic Railway Timetabling," Transportation Science, INFORMS, vol. 37(2), pages 198-212, May.
    4. Carey, Malachy, 1994. "A model and strategy for train pathing with choice of lines, platforms, and routes," Transportation Research Part B: Methodological, Elsevier, vol. 28(5), pages 333-353, October.
    5. Kis, Tamas, 2003. "Job-shop scheduling with processing alternatives," European Journal of Operational Research, Elsevier, vol. 151(2), pages 307-332, December.
    6. U. Brännlund & P. O. Lindberg & A. Nõu & J.-E. Nilsson, 1998. "Railway Timetabling Using Lagrangian Relaxation," Transportation Science, INFORMS, vol. 32(4), pages 358-369, November.
    7. Kroon, Leo G. & Edwin Romeijn, H. & Zwaneveld, Peter J., 1997. "Routing trains through railway stations: complexity issues," European Journal of Operational Research, Elsevier, vol. 98(3), pages 485-498, May.
    8. Zwaneveld, Peter J. & Kroon, Leo G. & van Hoesel, Stan P. M., 2001. "Routing trains through a railway station based on a node packing model," European Journal of Operational Research, Elsevier, vol. 128(1), pages 14-33, January.
    9. Nowicki, Eugeniusz, 1999. "The permutation flow shop with buffers: A tabu search approach," European Journal of Operational Research, Elsevier, vol. 116(1), pages 205-219, July.
    10. Carey, Malachy & Carville, Sinead, 2003. "Scheduling and platforming trains at busy complex stations," Transportation Research Part A: Policy and Practice, Elsevier, vol. 37(3), pages 195-224, March.
    11. Murovec, Bostjan & Suhel, Peter, 2004. "A repairing technique for the local search of the job-shop problem," European Journal of Operational Research, Elsevier, vol. 153(1), pages 220-238, February.
    12. Dorfman, M. J. & Medanic, J., 2004. "Scheduling trains on a railway network using a discrete event model of railway traffic," Transportation Research Part B: Methodological, Elsevier, vol. 38(1), pages 81-98, January.
    13. Zhou, Xuesong & Zhong, Ming, 2005. "Bicriteria train scheduling for high-speed passenger railroad planning applications," European Journal of Operational Research, Elsevier, vol. 167(3), pages 752-771, December.
    14. Peter J. Zwaneveld & Leo G. Kroon & H. Edwin Romeijn & Marc Salomon & Stéphane Dauzère-Pérès & Stan P. M. Van Hoesel & Harrie W. Ambergen, 1996. "Routing Trains Through Railway Stations: Model Formulation and Algorithms," Transportation Science, INFORMS, vol. 30(3), pages 181-194, August.
    15. Carey, Malachy, 1994. "Extending a train pathing model from one-way to two-way track," Transportation Research Part B: Methodological, Elsevier, vol. 28(5), pages 395-400, October.
    16. Sahin, Ismail, 1999. "Railway traffic control and train scheduling based oninter-train conflict management," Transportation Research Part B: Methodological, Elsevier, vol. 33(7), pages 511-534, September.
    17. Stéphane Dauzère-Pérès & Jan Paulli, 1997. "An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search," Annals of Operations Research, Springer, vol. 70(0), pages 281-306, April.
    18. Alain Billionnet, 2003. "Using Integer Programming to Solve the Train-Platforming Problem," Transportation Science, INFORMS, vol. 37(2), pages 213-222, May.
    19. Burdett, R.L. & Kozan, E., 2006. "Techniques for absolute capacity determination in railways," Transportation Research Part B: Methodological, Elsevier, vol. 40(8), pages 616-632, September.
    20. Odijk, Michiel A., 1996. "A constraint generation algorithm for the construction of periodic railway timetables," Transportation Research Part B: Methodological, Elsevier, vol. 30(6), pages 455-464, December.
    21. P Corry & E Kozan, 2004. "Job scheduling with technical constraints," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(2), pages 160-169, February.
    22. Higgins, A. & Kozan, E. & Ferreira, L., 1996. "Optimal scheduling of trains on a single line track," Transportation Research Part B: Methodological, Elsevier, vol. 30(2), pages 147-161, April.
    23. Mascis, Alessandro & Pacciarelli, Dario, 2002. "Job-shop scheduling with blocking and no-wait constraints," European Journal of Operational Research, Elsevier, vol. 143(3), pages 498-517, December.
    24. Zoghby, Jeriad & Wesley Barnes, J. & Hasenbein, John J., 2005. "Modeling the reentrant job shop scheduling problem with setups for metaheuristic searches," European Journal of Operational Research, Elsevier, vol. 167(2), pages 336-348, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Wenliang Zhou & Wenzhuang Fan & Xiaorong You & Lianbo Deng, 2019. "Demand-Oriented Train Timetabling Integrated with Passenger Train-Booking Decisions," Sustainability, MDPI, vol. 11(18), pages 1-34, September.
    2. Zhou, Wenliang & Tian, Junli & Xue, Lijuan & Jiang, Min & Deng, Lianbo & Qin, Jin, 2017. "Multi-periodic train timetabling using a period-type-based Lagrangian relaxation decomposition," Transportation Research Part B: Methodological, Elsevier, vol. 105(C), pages 144-173.
    3. Barrena, Eva & Canca, David & Coelho, Leandro C. & Laporte, Gilbert, 2014. "Single-line rail rapid transit timetabling under dynamic passenger demand," Transportation Research Part B: Methodological, Elsevier, vol. 70(C), pages 134-150.
    4. Julia Lange & Frank Werner, 2018. "Approaches to modeling train scheduling problems as job-shop problems with blocking constraints," Journal of Scheduling, Springer, vol. 21(2), pages 191-207, April.
    5. Zhang, Yongxiang & D'Ariano, Andrea & He, Bisheng & Peng, Qiyuan, 2019. "Microscopic optimization model and algorithm for integrating train timetabling and track maintenance task scheduling," Transportation Research Part B: Methodological, Elsevier, vol. 127(C), pages 237-278.
    6. Christophe Sauvey & Wajdi Trabelsi & Nathalie Sauer, 2020. "Mathematical Model and Evaluation Function for Conflict-Free Warranted Makespan Minimization of Mixed Blocking Constraint Job-Shop Problems," Mathematics, MDPI, vol. 8(1), pages 1-17, January.
    7. Burdett, RL, 2016. "Optimisation models for expanding a railway's theoretical capacity," European Journal of Operational Research, Elsevier, vol. 251(3), pages 783-797.
    8. Evgeny Gafarov & Frank Werner, 2019. "Two-Machine Job-Shop Scheduling with Equal Processing Times on Each Machine," Mathematics, MDPI, vol. 7(3), pages 1-11, March.
    9. Hare, Warren & Lucet, Yves & Rahman, Faisal, 2015. "A mixed-integer linear programming model to optimize the vertical alignment considering blocks and side-slopes in road construction," European Journal of Operational Research, Elsevier, vol. 241(3), pages 631-641.
    10. Burdett, Robert L. & Kozan, Erhan, 2018. "An integrated approach for scheduling health care activities in a hospital," European Journal of Operational Research, Elsevier, vol. 264(2), pages 756-773.
    11. Paul Corry & Christian Bierwirth, 2019. "The Berth Allocation Problem with Channel Restrictions," Transportation Science, INFORMS, vol. 53(3), pages 708-727, May.
    12. Twan Dollevoet & Dennis Huisman & Leo Kroon & Marie Schmidt & Anita Schöbel, 2015. "Delay Management Including Capacities of Stations," Transportation Science, INFORMS, vol. 49(2), pages 185-203, May.
    13. Sels, P. & Dewilde, T. & Cattrysse, D. & Vansteenwegen, P., 2016. "Reducing the passenger travel time in practice by the automated construction of a robust railway timetable," Transportation Research Part B: Methodological, Elsevier, vol. 84(C), pages 124-156.
    14. Ram Gopalan, 2015. "Computational complexity of convoy movement planning problems," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 82(1), pages 31-60, August.
    15. Dauzère-Pérès, Stéphane & Ding, Junwen & Shen, Liji & Tamssaouet, Karim, 2024. "The flexible job shop scheduling problem: A review," European Journal of Operational Research, Elsevier, vol. 314(2), pages 409-432.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Lee, Yusin & Chen, Chuen-Yih, 2009. "A heuristic for the train pathing and timetabling problem," Transportation Research Part B: Methodological, Elsevier, vol. 43(8-9), pages 837-851, September.
    2. Sels, P. & Vansteenwegen, P. & Dewilde, T. & Cattrysse, D. & Waquet, B. & Joubert, A., 2014. "The train platforming problem: The infrastructure management company perspective," Transportation Research Part B: Methodological, Elsevier, vol. 61(C), pages 55-72.
    3. Zhou, Xuesong & Zhong, Ming, 2007. "Single-track train timetabling with guaranteed optimality: Branch-and-bound algorithms with enhanced lower bounds," Transportation Research Part B: Methodological, Elsevier, vol. 41(3), pages 320-341, March.
    4. Matthew E. H. Petering & Mojtaba Heydar & Dietrich R. Bergmann, 2016. "Mixed-Integer Programming for Railway Capacity Analysis and Cyclic, Combined Train Timetabling and Platforming," Transportation Science, INFORMS, vol. 50(3), pages 892-909, August.
    5. Lu, Gongyuan & Nie, Yu(Marco) & Liu, Xiaobo & Li, Denghui, 2019. "Trajectory-based traffic management inside an autonomous vehicle zone," Transportation Research Part B: Methodological, Elsevier, vol. 120(C), pages 76-98.
    6. Min, Yun-Hong & Park, Myoung-Ju & Hong, Sung-Pil & Hong, Soon-Heum, 2011. "An appraisal of a column-generation-based algorithm for centralized train-conflict resolution on a metropolitan railway network," Transportation Research Part B: Methodological, Elsevier, vol. 45(2), pages 409-429, February.
    7. Zhang, Yongxiang & Peng, Qiyuan & Yao, Yu & Zhang, Xin & Zhou, Xuesong, 2019. "Solving cyclic train timetabling problem through model reformulation: Extended time-space network construct and Alternating Direction Method of Multipliers methods," Transportation Research Part B: Methodological, Elsevier, vol. 128(C), pages 344-379.
    8. Yu-Jun Zheng, 2018. "Emergency Train Scheduling on Chinese High-Speed Railways," Transportation Science, INFORMS, vol. 52(5), pages 1077-1091, October.
    9. Wenliang Zhou & Junli Tian & Jin Qin & Lianbo Deng & TangJian Wei, 2015. "Optimization of Multiperiod Mixed Train Schedule on High-Speed Railway," Discrete Dynamics in Nature and Society, Hindawi, vol. 2015, pages 1-14, April.
    10. Flamini, Marta & Pacciarelli, Dario, 2008. "Real time management of a metro rail terminus," European Journal of Operational Research, Elsevier, vol. 189(3), pages 746-761, September.
    11. Li, Feng & Sheu, Jiuh-Biing & Gao, Zi-You, 2014. "Deadlock analysis, prevention and train optimal travel mechanism in single-track railway system," Transportation Research Part B: Methodological, Elsevier, vol. 68(C), pages 385-414.
    12. Richard Lusby & Jesper Larsen & David Ryan & Matthias Ehrgott, 2011. "Routing Trains Through Railway Junctions: A New Set-Packing Approach," Transportation Science, INFORMS, vol. 45(2), pages 228-245, May.
    13. Alberto Caprara & Laura Galli & Paolo Toth, 2011. "Solution of the Train Platforming Problem," Transportation Science, INFORMS, vol. 45(2), pages 246-257, May.
    14. Carey, Malachy & Crawford, Ivan, 2007. "Scheduling trains on a network of busy complex stations," Transportation Research Part B: Methodological, Elsevier, vol. 41(2), pages 159-178, February.
    15. Zhou, Wenliang & Teng, Hualiang, 2016. "Simultaneous passenger train routing and timetabling using an efficient train-based Lagrangian relaxation decomposition," Transportation Research Part B: Methodological, Elsevier, vol. 94(C), pages 409-439.
    16. Dennis Huisman & Leo G. Kroon & Ramon M. Lentink & Michiel J. C. M. Vromans, 2005. "Operations Research in passenger railway transportation," Statistica Neerlandica, Netherlands Society for Statistics and Operations Research, vol. 59(4), pages 467-497, November.
    17. Andrea D'Ariano & Francesco Corman & Dario Pacciarelli & Marco Pranzo, 2008. "Reordering and Local Rerouting Strategies to Manage Train Traffic in Real Time," Transportation Science, INFORMS, vol. 42(4), pages 405-419, November.
    18. Carlo Mannino & Alessandro Mascis, 2009. "Optimal Real-Time Traffic Control in Metro Stations," Operations Research, INFORMS, vol. 57(4), pages 1026-1039, August.
    19. G. Caimi & F. Chudak & M. Fuchsberger & M. Laumanns & R. Zenklusen, 2011. "A New Resource-Constrained Multicommodity Flow Model for Conflict-Free Train Routing and Scheduling," Transportation Science, INFORMS, vol. 45(2), pages 212-227, May.
    20. Lu, Gongyuan & Ning, Jia & Liu, Xiaobo & Nie, Yu (Marco), 2022. "Train platforming and rescheduling with flexible interlocking mechanisms: An aggregate approach," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 159(C).

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:200:y:2010:i:1:p:85-98. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.