My bibliography
Save this item
Application of a Technique for Research and Development Program Evaluation
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Serpell Alfredo Federico & Ferrada Ximena & Rubio Larissa, 2019. "Measuring the performance of project risk management: a preliminary model," Organization, Technology and Management in Construction, Sciendo, vol. 11(1), pages 1984-1991, January.
- Kamburowski, J., 1997. "New validations of PERT times," Omega, Elsevier, vol. 25(3), pages 323-328, June.
- Xiong, Jian & Leus, Roel & Yang, Zhenyu & Abbass, Hussein A., 2016. "Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project," European Journal of Operational Research, Elsevier, vol. 251(2), pages 662-675.
- Rostami, Salim & Creemers, Stefan & Leus, Roel, 2024. "Maximizing the net present value of a project under uncertainty: Activity delays and dynamic policies," European Journal of Operational Research, Elsevier, vol. 317(1), pages 16-24.
- Illana Bendavid & Boaz Golany, 2009. "Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology," Annals of Operations Research, Springer, vol. 172(1), pages 259-276, November.
- CATTARUZZO Sebastiano, 2020. "On R&D sectoral intensities and convergence clubs," JRC Working Papers on Corporate R&D and Innovation 2020-01, Joint Research Centre.
- Wiesemann, Wolfram & Kuhn, Daniel & Rustem, Berç, 2010. "Maximizing the net present value of a project under uncertainty," European Journal of Operational Research, Elsevier, vol. 202(2), pages 356-367, April.
- Jorgensen, Trond & Wallace, Stein W., 2000. "Improving project cost estimation by taking into account managerial flexibility," European Journal of Operational Research, Elsevier, vol. 127(2), pages 239-251, December.
- Elena Almaraz Luengo & Carlos Gragera, 2023. "Critical Analysis of Beta Random Variable Generation Methods," Mathematics, MDPI, vol. 11(24), pages 1-31, December.
- van Dorp, J. Rene, 2005. "Statistical dependence through common risk factors: With applications in uncertainty analysis," European Journal of Operational Research, Elsevier, vol. 161(1), pages 240-255, February.
- Nima Zoraghi & Aria Shahsavar & Babak Abbasi & Vincent Peteghem, 2017. "Multi-mode resource-constrained project scheduling problem with material ordering under bonus–penalty policies," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 25(1), pages 49-79, April.
- Dubois, Didier & Fargier, Helene & Galvagnon, Vincent, 2003. "On latest starting times and floats in activity networks with ill-known durations," European Journal of Operational Research, Elsevier, vol. 147(2), pages 266-280, June.
- Sparing, Daniel & Goverde, Rob M.P., 2017. "A cycle time optimization model for generating stable periodic railway timetables," Transportation Research Part B: Methodological, Elsevier, vol. 98(C), pages 198-223.
- Bergantiños, Gustavo & Lorenzo, Leticia, 2019.
"How to apply penalties to avoid delays in projects,"
European Journal of Operational Research, Elsevier, vol. 275(2), pages 608-620.
- Bergantiños, Gustavo & Lorenzo, Leticia, 2019. "How to apply penalties to avoid delays in projects," MPRA Paper 91718, University Library of Munich, Germany.
- Bergantiños, Gustavo & Lorenzo, Leticia, 2019. "How to apply penalties to avoid delays in projects," MPRA Paper 97139, University Library of Munich, Germany.
- Schmidt, Craig W. & Grossmann, Ignacio E., 2000. "The exact overall time distribution of a project with uncertain task durations," European Journal of Operational Research, Elsevier, vol. 126(3), pages 614-636, November.
- Illana Bendavid & Boaz Golany, 2011. "Predetermined intervals for start times of activities in the stochastic project scheduling problem," Annals of Operations Research, Springer, vol. 186(1), pages 429-442, June.
- Colin, Jeroen & Vanhoucke, Mario, 2014. "Setting tolerance limits for statistical project control using earned value management," Omega, Elsevier, vol. 49(C), pages 107-122.
- Li, Xiaobo & Natarajan, Karthik & Teo, Chung-Piaw & Zheng, Zhichao, 2014. "Distributionally robust mixed integer linear programs: Persistency models with applications," European Journal of Operational Research, Elsevier, vol. 233(3), pages 459-473.
- Fernando Acebes & David Poza & Jose M Gonzalez-Varona & Javier Pajares & Adolfo Lopez-Paredes, 2024. "On the project risk baseline: integrating aleatory uncertainty into project scheduling," Papers 2406.00077, arXiv.org.
- Weglarz, Jan & Józefowska, Joanna & Mika, Marek & Waligóra, Grzegorz, 2011. "Project scheduling with finite or infinite number of activity processing modes - A survey," European Journal of Operational Research, Elsevier, vol. 208(3), pages 177-205, February.
- Osama Mohamed ElSahly & Salma Ahmed & Akmal Abdelfatah, 2023. "Systematic Review of the Time-Cost Optimization Models in Construction Management," Sustainability, MDPI, vol. 15(6), pages 1-20, March.
- Jeffrey M. Keisler & Robert F. Bordley, 2015. "Project Management Decisions with Uncertain Targets," Decision Analysis, INFORMS, vol. 12(1), pages 15-28, March.
- Pérez, José García & Martín, María del Mar López & García, Catalina García & Sánchez Granero, Miguel Ángel, 2016. "Project management under uncertainty beyond beta: The generalized bicubic distribution," Operations Research Perspectives, Elsevier, vol. 3(C), pages 67-76.
- Sylvain Lenfle & Pascal Le Masson & Benoit Weil, 2014. "Using design theory to characterize various forms of breakthrough R&D projects and their management: revisiting Manhattan & Polaris," Post-Print hal-01002713, HAL.
- Salim Rostami & Stefan Creemers & Roel Leus, 2018. "New strategies for stochastic resource-constrained project scheduling," Journal of Scheduling, Springer, vol. 21(3), pages 349-365, June.
- Carlo Orsi, 2022. "On the conditional noncentral beta distribution," Statistica Neerlandica, Netherlands Society for Statistics and Operations Research, vol. 76(2), pages 164-189, May.
- Kotz, Samuel & van Dorp, J. René, 2005. "A link between two-sided power and asymmetric Laplace distributions: with applications to mean and variance approximations," Statistics & Probability Letters, Elsevier, vol. 71(4), pages 383-394, March.
- Lee, Heejung & Suh, Hyo-Won, 2008. "Estimating the duration of stochastic workflow for product development process," International Journal of Production Economics, Elsevier, vol. 111(1), pages 105-117, January.
- Bregman, Robert L., 2009. "A heuristic procedure for solving the dynamic probabilistic project expediting problem," European Journal of Operational Research, Elsevier, vol. 192(1), pages 125-137, January.
- Button Scott D., 2003. "Project duration prediction using a Monte Carlo simulation of the periodic output of the project resources," Monte Carlo Methods and Applications, De Gruyter, vol. 9(3), pages 217-225, September.
- Niskanen, Olli, 2016. "Accounting for risk in farm investment calculations: application to dairy farm investment," 156th Seminar, October 4, 2016, Wageningen, The Netherlands 249988, European Association of Agricultural Economists.
- Igor KREJČÍ & Milan HOUŠKA, 2014. "Discussion with the paper 'Project costs planning in the conditions of uncertainty' by H. Štiková," Agricultural Economics, Czech Academy of Agricultural Sciences, vol. 60(11), pages 517-523.
- Edieal Pinker & Joseph Szmerekovsky & Vera Tilson, 2013. "Technical Note---Managing a Secret Project," Operations Research, INFORMS, vol. 61(1), pages 65-72, February.
- Laslo, Zohar & Keren, Baruch & Ilani, Hagai, 2008. "Minimizing task completion time with the execution set method," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1513-1519, June.
- Yakhchali, Siamak Haji & Ghodsypour, Seyed Hassan, 2010. "Computing latest starting times of activities in interval-valued networks with minimal time lags," European Journal of Operational Research, Elsevier, vol. 200(3), pages 874-880, February.
- Creemers, Stefan, 2018. "Moments and distribution of the net present value of a serial project," European Journal of Operational Research, Elsevier, vol. 267(3), pages 835-848.
- Geng, Sunyue & Liu, Sifeng & Fang, Zhigeng & Gao, Su, 2021. "A reliable framework for satellite networks achieving energy requirements," Reliability Engineering and System Safety, Elsevier, vol. 216(C).
- Hajdu M. & Isaac S., 2016. "Sixty years of project planning: history and future," Organization, Technology and Management in Construction, Sciendo, vol. 8(1), pages 1499-1510, December.
- Illana Bendavid & Boaz Golany, 2011. "Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology," Annals of Operations Research, Springer, vol. 189(1), pages 25-42, September.
- Finer, David Andrew, 2022. "No Shock Waves through Wall Street? Market Responses to the Risk of Nuclear War," Working Papers 318, The University of Chicago Booth School of Business, George J. Stigler Center for the Study of the Economy and the State.
- Sobel, Matthew J. & Szmerekovsky, Joseph G. & Tilson, Vera, 2009. "Scheduling projects with stochastic activity duration to maximize expected net present value," European Journal of Operational Research, Elsevier, vol. 198(3), pages 697-705, November.
- Elise D. Miller-Hooks & Hani S. Mahmassani, 2000. "Least Expected Time Paths in Stochastic, Time-Varying Transportation Networks," Transportation Science, INFORMS, vol. 34(2), pages 198-215, May.
- S. Yaser Samadi & L. Billard & Jiin-Huarng Guo & Wei Xu, 2024. "MLE for the parameters of bivariate interval-valued model," Advances in Data Analysis and Classification, Springer;German Classification Society - Gesellschaft für Klassifikation (GfKl);Japanese Classification Society (JCS);Classification and Data Analysis Group of the Italian Statistical Society (CLADAG);International Federation of Classification Societies (IFCS), vol. 18(4), pages 827-850, December.
- Stetter, Chris & Piel, Jan-Hendrik & Hamann, Julian F.H. & Breitner, Michael H., 2020. "Competitive and risk-adequate auction bids for onshore wind projects in Germany," Energy Economics, Elsevier, vol. 90(C).
- Hahn, Eugene David, 2008. "Mixture densities for project management activity times: A robust approach to PERT," European Journal of Operational Research, Elsevier, vol. 188(2), pages 450-459, July.
- Zhen Song & Håkan Schunnesson & Mikael Rinne & John Sturgul, 2015. "An Approach to Realizing Process Control for Underground Mining Operations of Mobile Machines," PLOS ONE, Public Library of Science, vol. 10(6), pages 1-17, June.
- Alessio Angius & András Horváth & Marcello Urgo, 2021. "A Kronecker Algebra Formulation for Markov Activity Networks with Phase-Type Distributions," Mathematics, MDPI, vol. 9(12), pages 1-22, June.
- V. Sireesha & N. Ravi Shankar, 2013. "A new approach to find project characteristics and multiple possible critical paths in a fuzzy project network," Fuzzy Information and Engineering, Springer, vol. 5(1), pages 69-85, March.
- Vaseghi, Forough & Martens, Annelies & Vanhoucke, Mario, 2024. "Analysis of the impact of corrective actions for stochastic project networks," European Journal of Operational Research, Elsevier, vol. 316(2), pages 503-518.
- Laslo, Zohar & Gurevich, Gregory, 2007. "Minimal budget for activities chain with chance constrained lead-time," International Journal of Production Economics, Elsevier, vol. 107(1), pages 164-172, May.
- Andrew M. Ross, 2010. "Computing Bounds on the Expected Maximum of Correlated Normal Variables," Methodology and Computing in Applied Probability, Springer, vol. 12(1), pages 111-138, March.
- Gómez Sánchez, Mariam & Lalla-Ruiz, Eduardo & Fernández Gil, Alejandro & Castro, Carlos & Voß, Stefan, 2023. "Resource-constrained multi-project scheduling problem: A survey," European Journal of Operational Research, Elsevier, vol. 309(3), pages 958-976.
- Samadi, S. Yaser & Billard, Lynne, 2021. "Analysis of dependent data aggregated into intervals," Journal of Multivariate Analysis, Elsevier, vol. 186(C).
- R A Bowman, 2007. "Efficient sensitivity analysis of PERT network performance measures to significant changes in activity time parameters," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(10), pages 1354-1360, October.
- Barbara Gładysz, 2017. "Fuzzy-probabilistic PERT," Annals of Operations Research, Springer, vol. 258(2), pages 437-452, November.
- López Martín, M.M. & García García, C.B. & García Pérez, J. & Sánchez Granero, M.A., 2012. "An alternative for robust estimation in Project Management," European Journal of Operational Research, Elsevier, vol. 220(2), pages 443-451.
- M Revie & T Bedford & L Walls, 2010. "Evaluation of elicitation methods to quantify Bayes linear models," Journal of Risk and Reliability, , vol. 224(4), pages 322-332, December.
- Agrawal, M. K. & Elmaghraby, S. E. & Herroelen, W. S., 1996. ": A generator of testsets for project activity nets," European Journal of Operational Research, Elsevier, vol. 90(2), pages 376-382, April.
- Lau, Hon-Shiang & Hing-Ling Lau, Amy, 1996. "Estimating the demand distributions of single-period items having frequent stockouts," European Journal of Operational Research, Elsevier, vol. 92(2), pages 254-265, July.
- Kim, Byung-Cheol, 2022. "Multi-factor dependence modelling with specified marginals and structured association in large-scale project risk assessment," European Journal of Operational Research, Elsevier, vol. 296(2), pages 679-695.
- Gerald G. Brown & W. Matthew Carlyle & Robert C. Harney & Eric M. Skroch & R. Kevin Wood, 2009. "Interdicting a Nuclear-Weapons Project," Operations Research, INFORMS, vol. 57(4), pages 866-877, August.
- Hermans, Ben & Leus, Roel & Looy, Bart Van, 2023. "Deciding on scheduling, secrecy, and patenting during the new product development process: The relevance of project planning models," Omega, Elsevier, vol. 116(C).
- Christos Ellinas & Christos Nicolaides & Naoki Masuda, 2022. "Mitigation strategies against cascading failures within a project activity network," Journal of Computational Social Science, Springer, vol. 5(1), pages 383-400, May.
- Elmaghraby, Salah E. & Soewandi, Hanijanto & Yao, Ming-Jong, 2001. "Chance-constrained programming in activity networks: A critical evaluation," European Journal of Operational Research, Elsevier, vol. 131(2), pages 440-458, June.
- R. Alan Bowman, 2003. "Sensitivity curves for effective project management," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(5), pages 481-497, August.
- Trietsch, Dan & Mazmanyan, Lilit & Gevorgyan, Lilit & Baker, Kenneth R., 2012. "Modeling activity times by the Parkinson distribution with a lognormal core: Theory and validation," European Journal of Operational Research, Elsevier, vol. 216(2), pages 386-396.
- Keevil, Matthew G. & Armstrong, Doug P. & Brooks, Ronald J. & Litzgus, Jacqueline D., 2021. "A model of seasonal variation in somatic growth rates applied to two temperate turtle species," Ecological Modelling, Elsevier, vol. 443(C).
- A. Hernández-Bastida & M. P. Fernández-Sánchez, 2019. "How adding new information modifies the estimation of the mean and the variance in PERT: a maximum entropy distribution approach," Annals of Operations Research, Springer, vol. 274(1), pages 291-308, March.
- Ali Shafaat & C. Robert Kenley, 2020. "Model‐based design of project systems, modes, and states," Systems Engineering, John Wiley & Sons, vol. 23(2), pages 165-176, March.
- HerrerI´as-Velasco, José Manuel & HerrerI´as-Pleguezuelo, Rafael & van Dorp, Johan René, 2011. "Revisiting the PERT mean and variance," European Journal of Operational Research, Elsevier, vol. 210(2), pages 448-451, April.
- Manuel A. Nunez & Lynn Kuo & I. Robert Chiang, 2022. "Managing risk-adjusted resource allocation for project time-cost tradeoffs," Annals of Operations Research, Springer, vol. 317(2), pages 717-735, October.
- Carmichael, David G. & Ballouz, Joseph J. & Balatbat, Maria C.A., 2015. "Improving the attractiveness of CDM projects through allowing and incorporating options," Energy Policy, Elsevier, vol. 86(C), pages 784-791.
- Lau, Hon-Shiang & Somarajan, C., 1995. "A proposal on improved procedures for estimating task-time distributions in PERT," European Journal of Operational Research, Elsevier, vol. 85(1), pages 39-52, August.
- Catalina García & José Pérez & Salvador Rambaud, 2010. "Proposal of a new distribution in PERT methodology," Annals of Operations Research, Springer, vol. 181(1), pages 515-538, December.
- Zhao, Mingxuan & Zhou, Jian & Wang, Ke & Pantelous, Athanasios A., 2023. "Project scheduling problem with fuzzy activity durations: A novel operational law based solution framework," European Journal of Operational Research, Elsevier, vol. 306(2), pages 519-534.