Model‐based design of project systems, modes, and states
Author
Abstract
Suggested Citation
DOI: 10.1002/sys.21502
Download full text from publisher
References listed on IDEAS
- Frenken, Koen, 2006. "A fitness landscape approach to technological complexity, modularity, and vertical disintegration," Structural Change and Economic Dynamics, Elsevier, vol. 17(3), pages 288-305, September.
- D. G. Malcolm & J. H. Roseboom & C. E. Clark & W. Fazar, 1959. "Application of a Technique for Research and Development Program Evaluation," Operations Research, INFORMS, vol. 7(5), pages 646-669, October.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Kamburowski, J., 1997. "New validations of PERT times," Omega, Elsevier, vol. 25(3), pages 323-328, June.
- Xiong, Jian & Leus, Roel & Yang, Zhenyu & Abbass, Hussein A., 2016. "Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project," European Journal of Operational Research, Elsevier, vol. 251(2), pages 662-675.
- Shenglan Huang & Zhi Chen, 2017. "The Effects of Social Capital on Innovation Performance: From Complex Adaptive System Perspective," International Journal of Business and Management, Canadian Center of Science and Education, vol. 12(3), pages 191-191, February.
- Rostami, Salim & Creemers, Stefan & Leus, Roel, 2024. "Maximizing the net present value of a project under uncertainty: Activity delays and dynamic policies," European Journal of Operational Research, Elsevier, vol. 317(1), pages 16-24.
- Singh, Anuraag & Triulzi, Giorgio & Magee, Christopher L., 2021. "Technological improvement rate predictions for all technologies: Use of patent data and an extended domain description," Research Policy, Elsevier, vol. 50(9).
- Nima Zoraghi & Aria Shahsavar & Babak Abbasi & Vincent Peteghem, 2017. "Multi-mode resource-constrained project scheduling problem with material ordering under bonus–penalty policies," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 25(1), pages 49-79, April.
- Pérez, José García & Martín, María del Mar López & García, Catalina García & Sánchez Granero, Miguel Ángel, 2016. "Project management under uncertainty beyond beta: The generalized bicubic distribution," Operations Research Perspectives, Elsevier, vol. 3(C), pages 67-76.
- R A Bowman, 2007. "Efficient sensitivity analysis of PERT network performance measures to significant changes in activity time parameters," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(10), pages 1354-1360, October.
- Marengo, Luigi & Valente, Marco, 2010. "Industry dynamics in complex product spaces: An evolutionary model," Structural Change and Economic Dynamics, Elsevier, vol. 21(1), pages 5-16, March.
- Cristiano Antonelli, 2011. "The Economic Complexity of Technological Change: Knowledge Interaction and Path Dependence," Chapters, in: Cristiano Antonelli (ed.), Handbook on the Economic Complexity of Technological Change, chapter 1, Edward Elgar Publishing.
- Lau, Hon-Shiang & Hing-Ling Lau, Amy, 1996. "Estimating the demand distributions of single-period items having frequent stockouts," European Journal of Operational Research, Elsevier, vol. 92(2), pages 254-265, July.
- Patrick Llerena & Muge Ozman, 2013.
"Networks, irreversibility and knowledge creation,"
Journal of Evolutionary Economics, Springer, vol. 23(2), pages 431-453, April.
- Patrick Llerena & Muge Ozman, 2010. "Networks, Irreversibility and Knowledge Creation," Working Papers of BETA 2010-10, Bureau d'Economie Théorique et Appliquée, UDS, Strasbourg.
- Patrick Llerena & Müge Özman Gossart, 2011. "Networks, irreversibility and knowledge creation," Post-Print hal-02438004, HAL.
- Catalina García & José Pérez & Salvador Rambaud, 2010. "Proposal of a new distribution in PERT methodology," Annals of Operations Research, Springer, vol. 181(1), pages 515-538, December.
- Khraisha, Tamer, 2020. "Complex economic problems and fitness landscapes: Assessment and methodological perspectives," Structural Change and Economic Dynamics, Elsevier, vol. 52(C), pages 390-407.
- Triulzi, Giorgio & Alstott, Jeff & Magee, Christopher L., 2020. "Estimating technology performance improvement rates by mining patent data," Technological Forecasting and Social Change, Elsevier, vol. 158(C).
- Laslo, Zohar & Keren, Baruch & Ilani, Hagai, 2008. "Minimizing task completion time with the execution set method," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1513-1519, June.
- Geng, Sunyue & Liu, Sifeng & Fang, Zhigeng & Gao, Su, 2021. "A reliable framework for satellite networks achieving energy requirements," Reliability Engineering and System Safety, Elsevier, vol. 216(C).
- Sobel, Matthew J. & Szmerekovsky, Joseph G. & Tilson, Vera, 2009. "Scheduling projects with stochastic activity duration to maximize expected net present value," European Journal of Operational Research, Elsevier, vol. 198(3), pages 697-705, November.
- Elise D. Miller-Hooks & Hani S. Mahmassani, 2000. "Least Expected Time Paths in Stochastic, Time-Varying Transportation Networks," Transportation Science, INFORMS, vol. 34(2), pages 198-215, May.
- Zhen Song & Håkan Schunnesson & Mikael Rinne & John Sturgul, 2015. "An Approach to Realizing Process Control for Underground Mining Operations of Mobile Machines," PLOS ONE, Public Library of Science, vol. 10(6), pages 1-17, June.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:syseng:v:23:y:2020:i:2:p:165-176. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6858 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.