IDEAS home Printed from https://ideas.repec.org/a/spr/joinma/v30y2019i4d10.1007_s10845-017-1303-9.html
   My bibliography  Save this article

On the robustness of joint production and maintenance scheduling in presence of uncertainties

Author

Listed:
  • Abdelhamid Boudjelida

    (Laval University)

Abstract

Production and preventive maintenance are very important functions in industry which act on the same resources. However, in most real workshops, the scheduling of their respective activities is independent and the constraint that they cannot be accomplished at the same time is rarely considered. Therefore, we are facing a joint scheduling problem of production and preventive maintenance tasks. In addition, this joint scheduling risks at any moment to deviate from the theoretical desired performances when facing disturbances due to various causes. Thus, we must still seek the most robust scheduling, i.e. the one that resists to uncertainties. This paper proposes a new approach to study robustness of joint production and maintenance scheduling in permutation flow shop workshops. The studied scheduling are generated according to two strategies: sequential and integrated. As methods of scheduling resolution, we will consider the well-known ants colony optimization, genetic algorithm, tabu search and some hybridizations of these methods. Our approach can be applied to other joint scheduling generating methods. In particular, we study how insertion of maintenance tasks can contribute to the robustness of production scheduling and how some scheduling strategies and methods are more robust than others. Several experimental results show the merits of our approach.

Suggested Citation

  • Abdelhamid Boudjelida, 2019. "On the robustness of joint production and maintenance scheduling in presence of uncertainties," Journal of Intelligent Manufacturing, Springer, vol. 30(4), pages 1515-1530, April.
  • Handle: RePEc:spr:joinma:v:30:y:2019:i:4:d:10.1007_s10845-017-1303-9
    DOI: 10.1007/s10845-017-1303-9
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10845-017-1303-9
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10845-017-1303-9?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Yenisey, Mehmet Mutlu & Yagmahan, Betul, 2014. "Multi-objective permutation flow shop scheduling problem: Literature review, classification and current trends," Omega, Elsevier, vol. 45(C), pages 119-135.
    2. Cardin, Olivier & Mebarki, Nasser & Pinot, Guillaume, 2013. "A study of the robustness of the group scheduling method using an emulation of a complex FMS," International Journal of Production Economics, Elsevier, vol. 146(1), pages 199-207.
    3. Dimitris Bertsimas & Melvyn Sim, 2004. "The Price of Robustness," Operations Research, INFORMS, vol. 52(1), pages 35-53, February.
    4. Fitouhi, Mohamed-Chahir & Nourelfath, Mustapha, 2014. "Integrating noncyclical preventive maintenance scheduling and production planning for multi-state systems," Reliability Engineering and System Safety, Elsevier, vol. 121(C), pages 175-186.
    5. Xiong, Jian & Xing, Li-ning & Chen, Ying-wu, 2013. "Robust scheduling for multi-objective flexible job-shop problems with random machine breakdowns," International Journal of Production Economics, Elsevier, vol. 141(1), pages 112-126.
    6. Cowling, Peter & Johansson, Marcus, 2002. "Using real time information for effective dynamic scheduling," European Journal of Operational Research, Elsevier, vol. 139(2), pages 230-244, June.
    7. T W Sloan, 2004. "A periodic review production and maintenance model with random demand, deteriorating equipment, and binomial yield," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(6), pages 647-656, June.
    8. M-L Espinouse & P Formanowicz & B Penz, 2001. "Complexity results and approximation algorithms for the two machine no-wait flow-shop with limited machine availability," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 52(1), pages 116-121, January.
    9. Nourelfath, Mustapha & Châtelet, Eric, 2012. "Integrating production, inventory and maintenance planning for a parallel system with dependent components," Reliability Engineering and System Safety, Elsevier, vol. 101(C), pages 59-66.
    10. Roux, O. & Duvivier, D. & Quesnel, G. & Ramat, E., 2013. "Optimization of preventive maintenance through a combined maintenance-production simulation model," International Journal of Production Economics, Elsevier, vol. 143(1), pages 3-12.
    11. Chung‐Yee Lee & Zhi‐Long Chen, 2000. "Scheduling jobs and maintenance activities on parallel machines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 47(2), pages 145-165, March.
    12. Taillard, E., 1993. "Benchmarks for basic scheduling problems," European Journal of Operational Research, Elsevier, vol. 64(2), pages 278-285, January.
    13. Laith A. Hadidi & Umar M. Al-Turki & Abdur Rahim, 2012. "Integrated models in production planning and scheduling, maintenance and quality: a review," International Journal of Industrial and Systems Engineering, Inderscience Enterprises Ltd, vol. 10(1), pages 21-50.
    14. Edis, Emrah B. & Oguz, Ceyda & Ozkarahan, Irem, 2013. "Parallel machine scheduling with additional resources: Notation, classification, models and solution methods," European Journal of Operational Research, Elsevier, vol. 230(3), pages 449-463.
    15. S. M. Johnson, 1954. "Optimal two‐ and three‐stage production schedules with setup times included," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 1(1), pages 61-68, March.
    16. Park, Moon-Won & Kim, Yeong-Dae, 2000. "A branch and bound algorithm for a production scheduling problem in an assembly system under due date constraints," European Journal of Operational Research, Elsevier, vol. 123(3), pages 504-518, June.
    17. Richard L. Daniels & Panagiotis Kouvelis, 1995. "Robust Scheduling to Hedge Against Processing Time Uncertainty in Single-Stage Production," Management Science, INFORMS, vol. 41(2), pages 363-376, February.
    18. Xia, Tangbin & Jin, Xiaoning & Xi, Lifeng & Ni, Jun, 2015. "Production-driven opportunistic maintenance for batch production based on MAM–APB scheduling," European Journal of Operational Research, Elsevier, vol. 240(3), pages 781-790.
    19. Mensendiek, Arne & Gupta, Jatinder N.D. & Herrmann, Jan, 2015. "Scheduling identical parallel machines with fixed delivery dates to minimize total tardiness," European Journal of Operational Research, Elsevier, vol. 243(2), pages 514-522.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Geurtsen, M. & Didden, Jeroen B.H.C. & Adan, J. & Atan, Z. & Adan, I., 2023. "Production, maintenance and resource scheduling: A review," European Journal of Operational Research, Elsevier, vol. 305(2), pages 501-529.
    2. Christopher Hagedorn & Johannes Huegle & Rainer Schlosser, 2022. "Understanding unforeseen production downtimes in manufacturing processes using log data-driven causal reasoning," Journal of Intelligent Manufacturing, Springer, vol. 33(7), pages 2027-2043, October.
    3. Seyed Ahmad Razavi Al-e-hashem & Ali Papi & Mir Saman Pishvaee & Mohammadreza Rasouli, 2022. "Robust maintenance planning and scheduling for multi-factory production networks considering disruption cost: a bi-objective optimization model and a metaheuristic solution method," Operational Research, Springer, vol. 22(5), pages 4999-5034, November.
    4. Giovanni Boschetti & Matteo Bottin & Maurizio Faccio & Riccardo Minto, 2021. "Multi-robot multi-operator collaborative assembly systems: a performance evaluation model," Journal of Intelligent Manufacturing, Springer, vol. 32(5), pages 1455-1470, June.
    5. Jafar-Zanjani, Hamed & Zandieh, Mostafa & Sharifi, Mani, 2022. "Robust and resilient joint periodic maintenance planning and scheduling in a multi-factory network under uncertainty: A case study," Reliability Engineering and System Safety, Elsevier, vol. 217(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Geurtsen, M. & Didden, Jeroen B.H.C. & Adan, J. & Atan, Z. & Adan, I., 2023. "Production, maintenance and resource scheduling: A review," European Journal of Operational Research, Elsevier, vol. 305(2), pages 501-529.
    2. Seyed Habib A. Rahmati & Abbas Ahmadi & Kannan Govindan, 2018. "A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach," Annals of Operations Research, Springer, vol. 269(1), pages 583-621, October.
    3. Brammer, Janis & Lutz, Bernhard & Neumann, Dirk, 2022. "Permutation flow shop scheduling with multiple lines and demand plans using reinforcement learning," European Journal of Operational Research, Elsevier, vol. 299(1), pages 75-86.
    4. Ekin, Tahir, 2018. "Integrated maintenance and production planning with endogenous uncertain yield," Reliability Engineering and System Safety, Elsevier, vol. 179(C), pages 52-61.
    5. Bouslah, B. & Gharbi, A. & Pellerin, R., 2016. "Integrated production, sampling quality control and maintenance of deteriorating production systems with AOQL constraint," Omega, Elsevier, vol. 61(C), pages 110-126.
    6. Ali Salmasnia & Ali Talesh-Kazemi, 2022. "Integrating inventory planning, pricing and maintenance for perishable products in a two-component parallel manufacturing system with common cause failures," Operational Research, Springer, vol. 22(2), pages 1235-1265, April.
    7. Kazaz, Burak & Sloan, Thomas W., 2013. "The impact of process deterioration on production and maintenance policies," European Journal of Operational Research, Elsevier, vol. 227(1), pages 88-100.
    8. Zeynep Adak & Mahmure Övül Arıoğlu Akan & Serol Bulkan, 0. "Multiprocessor open shop problem: literature review and future directions," Journal of Combinatorial Optimization, Springer, vol. 0, pages 1-23.
    9. Miri Gilenson & Dvir Shabtay & Liron Yedidsion & Rohit Malshe, 2021. "Scheduling in multi-scenario environment with an agreeable condition on job processing times," Annals of Operations Research, Springer, vol. 307(1), pages 153-173, December.
    10. Cohen, Izack & Postek, Krzysztof & Shtern, Shimrit, 2023. "An adaptive robust optimization model for parallel machine scheduling," European Journal of Operational Research, Elsevier, vol. 306(1), pages 83-104.
    11. Lei Liu & Marcello Urgo, 2024. "Robust scheduling in a two-machine re-entrant flow shop to minimise the value-at-risk of the makespan: branch-and-bound and heuristic algorithms based on Markovian activity networks and phase-type dis," Annals of Operations Research, Springer, vol. 338(1), pages 741-764, July.
    12. Lin, Shih-Wei & Ying, Kuo-Ching, 2016. "Optimization of makespan for no-wait flowshop scheduling problems using efficient matheuristics," Omega, Elsevier, vol. 64(C), pages 115-125.
    13. Matthias Bultmann & Sigrid Knust & Stefan Waldherr, 2018. "Flow shop scheduling with flexible processing times," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 40(3), pages 809-829, July.
    14. M Ozlen & M Azizoğlu, 2011. "Rescheduling unrelated parallel machines with total flow time and total disruption cost criteria," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(1), pages 152-164, January.
    15. Li, Wei & Nault, Barrie R. & Ye, Honghan, 2019. "Trade-off balancing in scheduling for flow shop production and perioperative processes," European Journal of Operational Research, Elsevier, vol. 273(3), pages 817-830.
    16. Ali Salmasnia & Ali Talesh-Kazemi & Mohammad Reza Maleki, 2022. "Joint optimization of inventory planning, maintenance policy and pricing for perishable complementary products by considering the product freshness and technology level," Economia e Politica Industriale: Journal of Industrial and Business Economics, Springer;Associazione Amici di Economia e Politica Industriale, vol. 49(4), pages 713-746, December.
    17. Silva, Marco & Poss, Michael & Maculan, Nelson, 2020. "Solution algorithms for minimizing the total tardiness with budgeted processing time uncertainty," European Journal of Operational Research, Elsevier, vol. 283(1), pages 70-82.
    18. Lin, Jun & Ng, Tsan Sheng, 2011. "Robust multi-market newsvendor models with interval demand data," European Journal of Operational Research, Elsevier, vol. 212(2), pages 361-373, July.
    19. Nabil Nahas, 2017. "Buffer allocation and preventive maintenance optimization in unreliable production lines," Journal of Intelligent Manufacturing, Springer, vol. 28(1), pages 85-93, January.
    20. Esmaeil MEHDIZADEH & Amir Aydin Atashi ABKENAR, 2014. "Harmony Search Algorithm For Solvingâ Two Aggregate Production Planning Models With Breakdowns And Maintenance," Proceedings of the INTERNATIONAL MANAGEMENT CONFERENCE, Faculty of Management, Academy of Economic Studies, Bucharest, Romania, vol. 8(1), pages 306-320, November.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:joinma:v:30:y:2019:i:4:d:10.1007_s10845-017-1303-9. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.