IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v230y2013i3p449-463.html
   My bibliography  Save this article

Parallel machine scheduling with additional resources: Notation, classification, models and solution methods

Author

Listed:
  • Edis, Emrah B.
  • Oguz, Ceyda
  • Ozkarahan, Irem

Abstract

Majority of parallel machine scheduling studies consider machine as the only resource. However, in most real-life manufacturing environments, jobs may require additional resources, such as automated guided vehicles, machine operators, tools, pallets, dies, and industrial robots, for their handling and processing. This paper presents a review and discussion of studies on the parallel machine scheduling problems with additional resources. Papers are surveyed in five main categories: machine environment, additional resource, objective functions, complexity results and solution methods, and other important issues. The strengths and weaknesses of the literature together with open areas for future studies are also emphasized. Finally, extensions of integer programming models for two main classes of related problems are given and conclusions are drawn based on computational studies.

Suggested Citation

  • Edis, Emrah B. & Oguz, Ceyda & Ozkarahan, Irem, 2013. "Parallel machine scheduling with additional resources: Notation, classification, models and solution methods," European Journal of Operational Research, Elsevier, vol. 230(3), pages 449-463.
  • Handle: RePEc:eee:ejores:v:230:y:2013:i:3:p:449-463
    DOI: 10.1016/j.ejor.2013.02.042
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221713001914
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2013.02.042?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Kellerer, H. & Strusevich, V. A., 2003. "Scheduling parallel dedicated machines under a single non-shared resource," European Journal of Operational Research, Elsevier, vol. 147(2), pages 345-364, June.
    2. Shabtay, Dvir & Kaspi, Moshe, 2006. "Parallel machine scheduling with a convex resource consumption function," European Journal of Operational Research, Elsevier, vol. 173(1), pages 92-107, August.
    3. Blazewicz, J. & Barcelo, J. & Kubiak, W. & Rock, H., 1986. "Scheduling tasks on two processors with deadlines and additional resources," European Journal of Operational Research, Elsevier, vol. 26(3), pages 364-370, September.
    4. J.M. van den Akker & C.A.J. Hurkens & M.W.P. Savelsbergh, 2000. "Time-Indexed Formulations for Machine Scheduling Problems: Column Generation," INFORMS Journal on Computing, INFORMS, vol. 12(2), pages 111-124, May.
    5. Maarten Vendrik & Christiane Schwieren, 2010. "Identification, screening and stereotyping in labour market discrimination," Journal of Economics, Springer, vol. 99(2), pages 141-171, March.
    6. Ruiz-Torres, Alex J. & Lopez, Francisco J. & Ho, Johnny C., 2007. "Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs," European Journal of Operational Research, Elsevier, vol. 179(2), pages 302-315, June.
    7. Richard L. Daniels & Barbara J. Hoopes & Joseph B. Mazzola, 1996. "Scheduling Parallel Manufacturing Cells with Resource Flexibility," Management Science, INFORMS, vol. 42(9), pages 1260-1276, September.
    8. Su, Ling-Huey & Lien, Chun-Yuan, 2009. "Scheduling parallel machines with resource-dependent processing times," International Journal of Production Economics, Elsevier, vol. 117(2), pages 256-266, February.
    9. Jacek Błażewicz & Klaus H. Ecker & Erwin Pesch & Günter Schmidt & Jan Węglarz, 2007. "Handbook on Scheduling," International Handbooks on Information Systems, Springer, number 978-3-540-32220-7, November.
    10. Ozdamar, Linet & Ulusoy, Gunduz, 1994. "A local constraint based analysis approach to project scheduling under general resource constraints," European Journal of Operational Research, Elsevier, vol. 79(2), pages 287-298, December.
    11. Richard Daniels & Barbara Hoopes & Joseph Mazzola, 1997. "An analysis of heuristics for the parallel-machine flexible-resource scheduling problem," Annals of Operations Research, Springer, vol. 70(0), pages 439-472, April.
    12. Brucker, Peter & Kramer, Andreas, 1996. "Polynomial algorithms for resource-constrained and multiprocessor task scheduling problems," European Journal of Operational Research, Elsevier, vol. 90(2), pages 214-226, April.
    13. Chen, Jeng-Fung & Wu, Tai-Hsi, 2006. "Total tardiness minimization on unrelated parallel machine scheduling with auxiliary equipment constraints," Omega, Elsevier, vol. 34(1), pages 81-89, January.
    14. Cheng, T. C. E. & Sin, C. C. S., 1990. "A state-of-the-art review of parallel-machine scheduling research," European Journal of Operational Research, Elsevier, vol. 47(3), pages 271-292, August.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Geurtsen, M. & Didden, Jeroen B.H.C. & Adan, J. & Atan, Z. & Adan, I., 2023. "Production, maintenance and resource scheduling: A review," European Journal of Operational Research, Elsevier, vol. 305(2), pages 501-529.
    2. Norelhouda Sekkal & Fayçal Belkaid, 0. "A multi-objective simulated annealing to solve an identical parallel machine scheduling problem with deterioration effect and resources consumption constraints," Journal of Combinatorial Optimization, Springer, vol. 0, pages 1-37.
    3. Shi, Yuhui & Reich, Daniel & Epelman, Marina & Klampfl, Erica & Cohn, Amy, 2017. "An analytical approach to prototype vehicle test scheduling," Omega, Elsevier, vol. 67(C), pages 168-176.
    4. Baptiste, Pierre & Rebaine, Djamal & Zouba, Mohammed, 2017. "FPTAS for the two identical parallel machine problem with a single operator under the free changing mode," European Journal of Operational Research, Elsevier, vol. 256(1), pages 55-61.
    5. Rachid Benmansour & Oliver Braun & Saïd Hanafi, 2019. "The single-processor scheduling problem with time restrictions: complexity and related problems," Journal of Scheduling, Springer, vol. 22(4), pages 465-471, August.
    6. Weglarz, Jan & Józefowska, Joanna & Mika, Marek & Waligóra, Grzegorz, 2011. "Project scheduling with finite or infinite number of activity processing modes - A survey," European Journal of Operational Research, Elsevier, vol. 208(3), pages 177-205, February.
    7. Jun-Ho Lee & Hoon Jang, 2019. "Uniform Parallel Machine Scheduling with Dedicated Machines, Job Splitting and Setup Resources," Sustainability, MDPI, vol. 11(24), pages 1-23, December.
    8. Mohamed Amine Abdeljaoued & Nour El Houda Saadani & Zied Bahroun, 2020. "Heuristic and metaheuristic approaches for parallel machine scheduling under resource constraints," Operational Research, Springer, vol. 20(4), pages 2109-2132, December.
    9. Lotte Berghman & Roel Leus & Frits Spieksma, 2014. "Optimal solutions for a dock assignment problem with trailer transportation," Annals of Operations Research, Springer, vol. 213(1), pages 3-25, February.
    10. F. Rodriguez & C. Blum & C. García-Martínez & M. Lozano, 2012. "GRASP with path-relinking for the non-identical parallel machine scheduling problem with minimising total weighted completion times," Annals of Operations Research, Springer, vol. 201(1), pages 383-401, December.
    11. Da Col, Giacomo & Teppan, Erich C., 2022. "Industrial-size job shop scheduling with constraint programming," Operations Research Perspectives, Elsevier, vol. 9(C).
    12. Norelhouda Sekkal & Fayçal Belkaid, 2020. "A multi-objective simulated annealing to solve an identical parallel machine scheduling problem with deterioration effect and resources consumption constraints," Journal of Combinatorial Optimization, Springer, vol. 40(3), pages 660-696, October.
    13. Kerem Bülbül & Halil Şen, 2017. "An exact extended formulation for the unrelated parallel machine total weighted completion time problem," Journal of Scheduling, Springer, vol. 20(4), pages 373-389, August.
    14. Hui-Chih Hung & Bertrand M. T. Lin & Marc E. Posner & Jun-Min Wei, 2019. "Preemptive parallel-machine scheduling problem of maximizing the number of on-time jobs," Journal of Scheduling, Springer, vol. 22(4), pages 413-431, August.
    15. Hans Kellerer & Vitaly A. Strusevich, 2008. "Scheduling parallel dedicated machines with the speeding‐up resource," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(5), pages 377-389, August.
    16. Richard L. Daniels & Joseph B. Mazzola & Dailun Shi, 2004. "Flow Shop Scheduling with Partial Resource Flexibility," Management Science, INFORMS, vol. 50(5), pages 658-669, May.
    17. Yalaoui, F. & Chu, C., 2006. "New exact method to solve the Pm/rj/[summation operator]Cj schedule problem," International Journal of Production Economics, Elsevier, vol. 100(1), pages 168-179, March.
    18. Liu Guiqing & Li Kai & Cheng Bayi, 2015. "Preemptive Scheduling with Controllable Processing Times on Parallel Machines," Journal of Systems Science and Information, De Gruyter, vol. 3(1), pages 68-76, February.
    19. Lin, Hung-Tso & Liao, Ching-Jong, 2003. "A case study in a two-stage hybrid flow shop with setup time and dedicated machines," International Journal of Production Economics, Elsevier, vol. 86(2), pages 133-143, November.
    20. Biber Nurit & Mor Baruch & Schlissel Yitzhak & Shapira Dana, 2023. "Lot scheduling involving completion time problems on identical parallel machines," Operational Research, Springer, vol. 23(1), pages 1-29, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:230:y:2013:i:3:p:449-463. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.