IDEAS home Printed from https://ideas.repec.org/a/ids/ijisen/v10y2012i1p21-50.html
   My bibliography  Save this article

Integrated models in production planning and scheduling, maintenance and quality: a review

Author

Listed:
  • Laith A. Hadidi
  • Umar M. Al-Turki
  • Abdur Rahim

Abstract

The integration in production planning, scheduling, maintenance and quality has gained much attention from researchers in recent years. These areas are usually treated independently, which yielded independent models for each function. It is widely believed that these separate models will provide suboptimal solutions, due to the fact that they are interrelated. Proper understanding of this dependency will open a new avenue for more integrated models, and result in significant savings in operational cost and improved efficiency for any production system. This paper reviews the literature on models addressing different aspects of integration in these areas. This integration is treated in two different ways in the literature. The first way is to present models where a model is considered for one function taking into account the other. These models are referred to as interrelated models. The second way is to simultaneously model two or more elements of the production system. These models are referred to as integrated models. The objective of this paper is to review research in both interrelated and integrated modelling of production planning, scheduling, maintenance and quality to identify possible future directions.

Suggested Citation

  • Laith A. Hadidi & Umar M. Al-Turki & Abdur Rahim, 2012. "Integrated models in production planning and scheduling, maintenance and quality: a review," International Journal of Industrial and Systems Engineering, Inderscience Enterprises Ltd, vol. 10(1), pages 21-50.
  • Handle: RePEc:ids:ijisen:v:10:y:2012:i:1:p:21-50
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=44042
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Bouslah, B. & Gharbi, A. & Pellerin, R., 2016. "Joint economic design of production, continuous sampling inspection and preventive maintenance of a deteriorating production system," International Journal of Production Economics, Elsevier, vol. 173(C), pages 184-198.
    2. Tambe, Pravin P. & Kulkarni, Makarand S., 2022. "A reliability based integrated model of maintenance planning with quality control and production decision for improving operational performance," Reliability Engineering and System Safety, Elsevier, vol. 226(C).
    3. Jiawen Hu & Zuhua Jiang & Hong Wang, 2017. "Joint Optimization of Production Plan and Preventive Maintenance Schedule by Stackelberg Game," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(04), pages 1-28, August.
    4. Geurtsen, M. & Didden, Jeroen B.H.C. & Adan, J. & Atan, Z. & Adan, I., 2023. "Production, maintenance and resource scheduling: A review," European Journal of Operational Research, Elsevier, vol. 305(2), pages 501-529.
    5. Nabil Nahas, 2017. "Buffer allocation and preventive maintenance optimization in unreliable production lines," Journal of Intelligent Manufacturing, Springer, vol. 28(1), pages 85-93, January.
    6. Bouslah, B. & Gharbi, A. & Pellerin, R., 2016. "Integrated production, sampling quality control and maintenance of deteriorating production systems with AOQL constraint," Omega, Elsevier, vol. 61(C), pages 110-126.
    7. Abdelhamid Boudjelida, 2019. "On the robustness of joint production and maintenance scheduling in presence of uncertainties," Journal of Intelligent Manufacturing, Springer, vol. 30(4), pages 1515-1530, April.
    8. Ait-El-Cadi, Abdessamad & Gharbi, Ali & Dhouib, Karem & Artiba, Abdelhakim, 2021. "Integrated production, maintenance and quality control policy for unreliable manufacturing systems under dynamic inspection," International Journal of Production Economics, Elsevier, vol. 236(C).
    9. Shen, Yilan & Zhang, Xi & Shi, Leyuan, 2022. "Joint optimization of production and maintenance for a serial–parallel hybrid two-stage production system," Reliability Engineering and System Safety, Elsevier, vol. 226(C).
    10. Schouten, Thijs Nicolaas & Dekker, Rommert & Hekimoğlu, Mustafa & Eruguz, Ayse Sena, 2022. "Maintenance optimization for a single wind turbine component under time-varying costs," European Journal of Operational Research, Elsevier, vol. 300(3), pages 979-991.
    11. Ekin, Tahir, 2018. "Integrated maintenance and production planning with endogenous uncertain yield," Reliability Engineering and System Safety, Elsevier, vol. 179(C), pages 52-61.
    12. Hoyningen-Huene, Wiebke von, 2015. "Heuristics for an Integrated Maintenance and Production Scheduling Problem on Parallel Machines with Stochastic Failures and Non-Resumable Jobs," EconStor Preprints 112746, ZBW - Leibniz Information Centre for Economics.
    13. von Hoyningen-Huene, W. & Kiesmüller, G.P., 2015. "Evaluation of the expected makespan of a set of non-resumable jobs on parallel machines with stochastic failures," European Journal of Operational Research, Elsevier, vol. 240(2), pages 439-446.
    14. Kazaz, Burak & Sloan, Thomas W., 2013. "The impact of process deterioration on production and maintenance policies," European Journal of Operational Research, Elsevier, vol. 227(1), pages 88-100.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:ijisen:v:10:y:2012:i:1:p:21-50. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=188 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.