Power transmission project: a framework to align project success with organization goal

Author

Listed:
  • Achintya Ghatak

    (CG Power & Industrial Solutions Limited)

  • Adarsh Garg

    (GLBIMR)

Abstract

Power Transmission plays a vital role in Power Sector to transport power from the generation plant to the end-user. Achieving organizational goals through power transmission is a significant concern for any organization, especially in India. The study proposes a project management framework for power transmission projects based on project critical success factors. Power Transmission projects are often influenced by numerous critical success factors which support the organization to reach its intended goals with high efficiency. A total of 46 critical success factors are considered of strategy, risk, contract, information technology, and stakeholder. The survey questionnaire is used as a research tool with professionals of power transmission projects from 14 private and public companies in India, who actively engage in the projects at different levels. The outcome of statistical analysis by SPSS-25 reveals that Project success has a positive direct relation with strategy, risk, information technology, stakeholder and whereas, a contract has not directed relation. As mediator variable risk, contract, information technology, and stakeholder have a direct relation with strategy. So, the contract has a significant indirect relation with project success. The proposed framework will support the alignment of project success with organizational goals through identified Critical Success Factors.

Suggested Citation

  • Achintya Ghatak & Adarsh Garg, 2022. "Power transmission project: a framework to align project success with organization goal," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 13(4), pages 1817-1833, August.
  • Handle: RePEc:spr:ijsaem:v:13:y:2022:i:4:d:10.1007_s13198-021-01568-z
    DOI: 10.1007/s13198-021-01568-z
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s13198-021-01568-z
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s13198-021-01568-z?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Dvir, D. & Lipovetsky, S. & Shenhar, A. & Tishler, A., 1998. "In search of project classification: a non-universal approach to project success factors," Research Policy, Elsevier, vol. 27(9), pages 915-935, December.
    2. Jun Dong & Dongran Liu & Dongxue Wang & Qi Zhang, 2019. "Identification of Key Influencing Factors of Sustainable Development for Traditional Power Generation Groups in a Market by Applying an Extended MCDM Model," Sustainability, MDPI, vol. 11(6), pages 1-30, March.
    3. Arshi Shakeel Faridi & Sameh Monir El-Sayegh, 2006. "Significant factors causing delay in the UAE construction industry," Construction Management and Economics, Taylor & Francis Journals, vol. 24(11), pages 1167-1176.
    4. Huiru Zhao & Nana Li, 2015. "Risk Evaluation of a UHV Power Transmission Construction Project Based on a Cloud Model and FCE Method for Sustainability," Sustainability, MDPI, vol. 7(3), pages 1-30, March.
    5. Hemanta Doloi, 2009. "Analysis of pre-qualification criteria in contractor selection and their impacts on project success," Construction Management and Economics, Taylor & Francis Journals, vol. 27(12), pages 1245-1263.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Khansa Hayat & Maryam Hafeez & Kanwal Bilal & Malik Shahzad Shabbir, 2022. "Interactive Effects of Organizational Structure and Team Work Quality on Project Success in Project Based Non ProfitOrganizations," iRASD Journal of Management, International Research Alliance for Sustainable Development (iRASD), vol. 4(1), pages 84-103, March.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Goutom K. Pall & Adrian J. Bridge & Jason Gray & Martin Skitmore, 2019. "Causes of Delay in Power Transmission Projects: An Empirical Study," Energies, MDPI, vol. 13(1), pages 1-29, December.
    2. Hemanta Doloi & Anil Sawhney & K.C. Iyer, 2012. "Structural equation model for investigating factors affecting delay in Indian construction projects," Construction Management and Economics, Taylor & Francis Journals, vol. 30(10), pages 869-884, October.
    3. Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2018. "Delay Factors in Reconstruction Projects: A Case Study of Mataf Expansion Project," Sustainability, MDPI, vol. 10(12), pages 1-18, December.
    4. Maqbool, Rashid, 2018. "Efficiency and effectiveness of factors affecting renewable energy projects; an empirical perspective," Energy, Elsevier, vol. 158(C), pages 944-956.
    5. Cobo-Benita, José Ramón & Rodríguez-Segura, Enrique & Ortiz-Marcos, Isabel & Ballesteros-Sánchez, Luis, 2016. "Innovation projects performance: Analyzing the impact of organizational characteristics," Journal of Business Research, Elsevier, vol. 69(4), pages 1357-1360.
    6. Jun Dong & Dongxue Wang & Dongran Liu & Palidan Ainiwaer & Linpeng Nie, 2019. "Operation Health Assessment of Power Market Based on Improved Matter-Element Extension Cloud Model," Sustainability, MDPI, vol. 11(19), pages 1-25, October.
    7. R. Jayaraman, 2021. "An Empirical Study of Delays in Large Engineering Projects: An Indian Experience," Jindal Journal of Business Research, , vol. 10(1), pages 49-76, June.
    8. Mahdieh Sabaghpour & Md. Nasiruzzaman & Md. Najibul Huq & Jamaludin Ibrahim, 2013. "Knowledge Management Strategies as a Competitive Advantage for Delivering Professional E-Government Services," Journal of Education and Vocational Research, AMH International, vol. 4(5), pages 134-138.
    9. Yazan Issa Abu Aisheh, 2021. "Lessons Learned, Barriers, and Improvement Factors for Mega Building Construction Projects in Developing Countries: Review Study," Sustainability, MDPI, vol. 13(19), pages 1-17, September.
    10. Yunna Wu & Meng Yang & Haobo Zhang & Kaifeng Chen & Yang Wang, 2016. "Optimal Site Selection of Electric Vehicle Charging Stations Based on a Cloud Model and the PROMETHEE Method," Energies, MDPI, vol. 9(3), pages 1-20, March.
    11. Ahmed S. El Touny & Ahmed H. Ibrahim & Hossam H. Mohamed, 2021. "An Integrated Sustainable Construction Project’s Critical Success Factors (ISCSFs)," Sustainability, MDPI, vol. 13(15), pages 1-26, August.
    12. Engwall, Mats, 2003. "No project is an island: linking projects to history and context," Research Policy, Elsevier, vol. 32(5), pages 789-808, May.
    13. Mohammad Ebrahim Sadeghi & Hamed Nozari & Hadi Khajezadeh Dezfoli & Mehdi Khajezadeh, 2021. "Ranking of different of investment risk in high-tech projects using TOPSIS method in fuzzy environment based on linguistic variables," Papers 2111.14665, arXiv.org.
    14. Antonio Héctor Álvarez-Pozo & Miguel Ignacio Parma-García & Isabel Ortiz-Marcos & Luis Fernando Bautista & Evangelina Atanes-Sánchez, 2024. "Analysis of Causes of Delays and Cost Overruns as Well as Mitigation Measures to Improve Profitability and Sustainability in Turnkey Industrial Projects," Sustainability, MDPI, vol. 16(4), pages 1-16, February.
    15. Deena Badran & Radhi AlZubaidi & Senthilkumar Venkatachalam, 2023. "Identification of Key Design Phase-Related Risks in DBB Projects in the UAE—Towards Developing a BIM Solution," Sustainability, MDPI, vol. 15(8), pages 1-23, April.
    16. Puthearath Chan & Myeong-Hun Lee, 2019. "Developing Sustainable City Indicators for Cambodia through Delphi Processes of Panel Surveys," Sustainability, MDPI, vol. 11(11), pages 1-32, June.
    17. Dr. Mwenda, Mary Nyawira & Dr. Otieno- Omutoko Lillian & Prof. Christopher Gakuu, 2021. "The Nexus between Project Monitoring and Evaluation and Quality of Residential Buildings in Nairobi County, Kenya," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 5(1), pages 354-362, January.
    18. Rishang Long & Jianhua Zhang, 2016. "Risk Assessment Method of UHV AC/DC Power System under Serious Disasters," Energies, MDPI, vol. 10(1), pages 1-13, December.
    19. Ihsan Issa Ahmad Hosani & Fikri T. Dweiri & Udechukwu Ojiako, 0. "A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 0, pages 1-10.
    20. Magdalena Krysiak & Aldona Kluczek, 2021. "A Multifaceted Challenge to Enhance Multicriteria Decision Support for Energy Policy," Energies, MDPI, vol. 14(14), pages 1-20, July.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:ijsaem:v:13:y:2022:i:4:d:10.1007_s13198-021-01568-z. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.