Analysis of pre-qualification criteria in contractor selection and their impacts on project success

Author

Listed:
  • Hemanta Doloi

Abstract

While construction industry practices are reasonably well developed, construction projects still witness widespread failures of many contractors due to varied reasons such as financial problems, poor management, over-commitment and or conflicts and disputes associated with construction activities. Pre-qualification of contractors is a common practice across projects, yet the investigation on the ability of the selected contractors in successful delivery of projects is not widespread. In an attempt to understand these pre-emptive qualification criteria and their links in contractors' performance in projects, a total of 43 influencing technical attributes were identified through a systematic research approach. The relative significance and impacts of the attributes have been determined based on a structured questionnaire survey in selected construction projects. By performing the factor analysis, a total of seven factors significant to contractors' performance were extracted, namely (1) soundness of business and workforce; (2) planning and control; (3) quality management; (4) past performance; (5) risk management; (6) organizational capability; and (7) commitment and dedication. Multiple linear regression models reveal that technical expertise, past success, time in business, work methods and working capital significantly impact on contractors' performance across time, cost and quality success. With a clear understanding of a contractor's performance, these findings could potentially contribute to development of a company's procedures or enhance existing knowledge in relation to the pre-qualification practices in contractor selection in projects.

Suggested Citation

  • Hemanta Doloi, 2009. "Analysis of pre-qualification criteria in contractor selection and their impacts on project success," Construction Management and Economics, Taylor & Francis Journals, vol. 27(12), pages 1245-1263.
  • Handle: RePEc:taf:conmgt:v:27:y:2009:i:12:p:1245-1263
    DOI: 10.1080/01446190903394541
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446190903394541
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446190903394541?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Goutom K. Pall & Adrian J. Bridge & Jason Gray & Martin Skitmore, 2019. "Causes of Delay in Power Transmission Projects: An Empirical Study," Energies, MDPI, vol. 13(1), pages 1-29, December.
    2. Hemanta Doloi & Anil Sawhney & K.C. Iyer, 2012. "Structural equation model for investigating factors affecting delay in Indian construction projects," Construction Management and Economics, Taylor & Francis Journals, vol. 30(10), pages 869-884, October.
    3. Amirhosein Jafari, 2013. "A contractor pre-qualification model based on the quality function deployment method," Construction Management and Economics, Taylor & Francis Journals, vol. 31(7), pages 746-760, July.
    4. Shobha Ramalingam, 2020. "Subcontractor Selection Process Through Vendor Bids: A Case of An Outsourcing Service in Construction," IIM Kozhikode Society & Management Review, , vol. 9(2), pages 129-142, July.
    5. Achintya Ghatak & Adarsh Garg, 2022. "Power transmission project: a framework to align project success with organization goal," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 13(4), pages 1817-1833, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:27:y:2009:i:12:p:1245-1263. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.