A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates
Author
Abstract
Suggested Citation
DOI: 10.1007/s13198-020-00979-8
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Skamris, Mette K. & Flyvbjerg, Bent, 1997. "Inaccuracy of traffic forecasts and cost estimates on large transport projects," Transport Policy, Elsevier, vol. 4(3), pages 141-146, July.
- Bent Flyvbjerg, 2013. "Quality Control and Due Diligence in Project Management: Getting Decisions Right by Taking the Outside View," Papers 1302.2544, arXiv.org.
- Bent Flyvbjerg, 2007.
"Policy and Planning for Large-Infrastructure Projects: Problems, Causes, Cures,"
Environment and Planning B, , vol. 34(4), pages 578-597, August.
- Flyvbjerg, Bent, 2005. "Policy and planning for large infrastructure projects : problems, causes, cures," Policy Research Working Paper Series 3781, The World Bank.
- Bent Flyvbjerg, 2013. "Policy and Planning for Large Infrastructure Projects: Problems, Causes, Cures," Papers 1303.7400, arXiv.org.
- Cantarelli, C.C. & Molin, E.J.E. & van Wee, B. & Flyvbjerg, B., 2012.
"Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases,"
Transport Policy, Elsevier, vol. 22(C), pages 49-56.
- Chantal C. Cantarelli & Eric J. E. Molin & Bert van Wee & Bent Flyvbjerg, 2013. "Characteristics of Cost Overruns for Dutch Transport Infrastructure Projects and the Importance of the Decision to Build and Project Phases," Papers 1307.2178, arXiv.org, revised Jan 2015.
- Arshi Shakeel Faridi & Sameh Monir El-Sayegh, 2006. "Significant factors causing delay in the UAE construction industry," Construction Management and Economics, Taylor & Francis Journals, vol. 24(11), pages 1167-1176.
- P. A. Koushki & K. Al-Rashid & N. Kartam, 2005. "Delays and cost increases in the construction of private residential projects in Kuwait," Construction Management and Economics, Taylor & Francis Journals, vol. 23(3), pages 285-294.
- Hugo Priemus & Bent Flyvbjerg & Bert van Wee (ed.), 2008. "Decision-Making on Mega-Projects," Books, Edward Elgar Publishing, number 4112.
- Ram Singh, 2009. "Delays and Cost Overruns in Infrastructure Projects -- An Enquiry into Extents, Causes and Remedies," Working papers 181, Centre for Development Economics, Delhi School of Economics.
- Dejan Makovšek & Polona Tominc & Klavdij Logožar, 2012. "A cost performance analysis of transport infrastructure construction in Slovenia," Transportation, Springer, vol. 39(1), pages 197-214, January.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Ihsan Issa Ahmad Hosani & Fikri T. Dweiri & Udechukwu Ojiako, 2020. "A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 11(6), pages 1250-1259, December.
- Odeck, James, 2014. "Do reforms reduce the magnitudes of cost overruns in road projects? Statistical evidence from Norway," Transportation Research Part A: Policy and Practice, Elsevier, vol. 65(C), pages 68-79.
- Edyta Plebankiewicz, 2018. "Model of Predicting Cost Overrun in Construction Projects," Sustainability, MDPI, vol. 10(12), pages 1-14, November.
- Verweij, Stefan & van Meerkerk, Ingmar & Korthagen, Iris A., 2015. "Reasons for contract changes in implementing Dutch transportation infrastructure projects: An empirical exploration," Transport Policy, Elsevier, vol. 37(C), pages 195-202.
- Love, Peter E.D. & Ahiaga-Dagbui, Dominic D., 2018. "Debunking fake news in a post-truth era: The plausible untruths of cost underestimation in transport infrastructure projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 113(C), pages 357-368.
- Molinari, Laura & Haezendonck, Elvira & Mabillard, Vincent, 2023. "Cost overruns of Belgian transport infrastructure projects: Analyzing variations over three land transport modes and two project phases," Transport Policy, Elsevier, vol. 134(C), pages 167-179.
- Miranda Sarmento, J.J., 2014. "Public private partnerships," Other publications TiSEM c7d4c978-234c-4f88-83ed-1, Tilburg University, School of Economics and Management.
- Martijn Leijten, 2013. "Real-world decision-making on mega-projects: politics, bias and strategic behaviour," Chapters, in: Hugo Priemus & Bert van Wee (ed.), International Handbook on Mega-Projects, chapter 4, pages 57-82, Edward Elgar Publishing.
- Awojobi, Omotola & Jenkins, Glenn P., 2016.
"Managing the cost overrun risks of hydroelectric dams: An application of reference class forecasting techniques,"
Renewable and Sustainable Energy Reviews, Elsevier, vol. 63(C), pages 19-32.
- Omotola Awojobi & Glenn P. Jenkins, 2015. "Managing the Cost Overrun Risks of Hydroelectric Dams: An Application of Reference Class Forecasting Techniques," Development Discussion Papers 2015-06, JDI Executive Programs.
- Willem K Korthals Altes, 2010. "The Financial Estimates and Results of Servicing Land in the Netherlands," Environment and Planning B, , vol. 37(5), pages 929-941, October.
- Zhou, You & Zhang, Lingzhu & Chiaradia, Alain J F, 2021. "An adaptation of reference class forecasting for the assessment of large-scale urban planning vision, a SEM-ANN approach to the case of Hong Kong Lantau tomorrow," Land Use Policy, Elsevier, vol. 109(C).
- Miller, Michael & Szimba, Eckhard, 2015. "How to avoid unrealistic appraisal results? A concept to reflect the occurrence of risk in the appraisal of transport infrastructure projects," Research in Transportation Economics, Elsevier, vol. 49(C), pages 65-75.
- James Odeck, 2019. "Variation in cost overruns of transportation projects: an econometric meta-regression analysis of studies reported in the literature," Transportation, Springer, vol. 46(4), pages 1345-1368, August.
- Goutom K. Pall & Adrian J. Bridge & Jason Gray & Martin Skitmore, 2019. "Causes of Delay in Power Transmission Projects: An Empirical Study," Energies, MDPI, vol. 13(1), pages 1-29, December.
- Dejan Makovšek & Marian Moszoro, 2018.
"Risk pricing inefficiency in public–private partnerships,"
Transport Reviews, Taylor & Francis Journals, vol. 38(3), pages 298-321, May.
- Makovsek, Dejan & Moszoro, Marian W., 2017. "Risk pricing inefficiency in public-private partnerships," MPRA Paper 101574, University Library of Munich, Germany.
- C. Guccio & G. Pignataro & I. Rizzo, 2012.
"Determinants of adaptation costs in procurement: an empirical estimation on Italian public works contracts,"
Applied Economics, Taylor & Francis Journals, vol. 44(15), pages 1891-1909, May.
- Calogero Guccio & Giacomo Pignataro & Ilde Rizzo, 2011. "Determinants of Adaptation Costs in Procurement: An Empirical Estimation on Italian Public Works Contracts," Post-Print hal-00687731, HAL.
- Bert van Wee, 2007. "Large Infrastructure Projects: A Review of the Quality of Demand Forecasts and Cost Estimations," Environment and Planning B, , vol. 34(4), pages 611-625, August.
- Bent Flyvbjerg, 2006.
"Cost Overruns and Demand Shortfalls in Urban Rail and Other Infrastructure,"
Transportation Planning and Technology, Taylor & Francis Journals, vol. 30(1), pages 9-30, February.
- Bent Flyvbjerg, 2013. "Cost Overruns and Demand Shortfalls in Urban Rail and Other Infrastructure," Papers 1303.7402, arXiv.org.
- Chiara Pancotti & Matteo Pedralli & Geert Smit & Silvia Vignetti, 2020. "Understanding transport project appraisal in its institutional dimension," Working Papers 201902, CSIL Centre for Industrial Studies.
- Cathy Macharis & Peter Nijkamp, 2013. "Multi-actor and multi-criteria analysis in evaluating mega-projects," Chapters, in: Hugo Priemus & Bert van Wee (ed.), International Handbook on Mega-Projects, chapter 11, pages 242-266, Edward Elgar Publishing.
More about this item
Keywords
Cost overruns; Factors; Road projects;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:ijsaem:v::y::i::d:10.1007_s13198-020-00979-8. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.