Multi-objective optimization of the closure law of guide vanes for pumped storage units
Author
Abstract
Suggested Citation
DOI: 10.1016/j.renene.2019.02.016
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Li, Chaoshun & Mao, Yifeng & Yang, Jiandong & Wang, Zanbin & Xu, Yanhe, 2017. "A nonlinear generalized predictive control for pumped storage unit," Renewable Energy, Elsevier, vol. 114(PB), pages 945-959.
- Rehman, Shafiqur & Al-Hadhrami, Luai M. & Alam, Md. Mahbub, 2015. "Pumped hydro energy storage system: A technological review," Renewable and Sustainable Energy Reviews, Elsevier, vol. 44(C), pages 586-598.
- Weijia Yang & Jiandong Yang & Wencheng Guo & Wei Zeng & Chao Wang & Linn Saarinen & Per Norrlund, 2015. "A Mathematical Model and Its Application for Hydro Power Units under Different Operating Conditions," Energies, MDPI, vol. 8(9), pages 1-16, September.
- Zanbin Wang & Chaoshun Li & Xinjie Lai & Nan Zhang & Yanhe Xu & Jinjiao Hou, 2018. "An Integrated Start-Up Method for Pumped Storage Units Based on a Novel Artificial Sheep Algorithm," Energies, MDPI, vol. 11(1), pages 1-29, January.
- Jinjiao Hou & Chaoshun Li & Ziqin Tian & Yanhe Xu & Xinjie Lai & Nan Zhang & Taoping Zheng & Wei Wu, 2018. "Multi-Objective Optimization of Start-up Strategy for Pumped Storage Units," Energies, MDPI, vol. 11(5), pages 1-19, May.
- Wang, Wenxiao & Li, Chaoshun & Liao, Xiang & Qin, Hui, 2017. "Study on unit commitment problem considering pumped storage and renewable energy via a novel binary artificial sheep algorithm," Applied Energy, Elsevier, vol. 187(C), pages 612-626.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Lei, Liuwei & Li, Feng & Kheav, Kimleng & Jiang, Wei & Luo, Xingqi & Patelli, Edoardo & Xu, Beibei & Chen, Diyi, 2021. "A start-up optimization strategy of a hydroelectric generating system: From a symmetrical structure to asymmetric structure on diversion pipes," Renewable Energy, Elsevier, vol. 180(C), pages 1148-1165.
- Lai, Xinjie & Li, Chaoshun & Zhou, Jianzhong & Zhang, Yongchuan & Li, Yonggang, 2020. "A multi-objective optimization strategy for the optimal control scheme of pumped hydropower systems under successive load rejections," Applied Energy, Elsevier, vol. 261(C).
- Jiawei Ye & Wei Zeng & Zhigao Zhao & Jiebin Yang & Jiandong Yang, 2020. "Optimization of Pump Turbine Closing Operation to Minimize Water Hammer and Pulsating Pressures During Load Rejection," Energies, MDPI, vol. 13(4), pages 1-18, February.
- Li, Chaoshun & Wang, Wenxiao & Wang, Jinwen & Chen, Deshu, 2019. "Network-constrained unit commitment with RE uncertainty and PHES by using a binary artificial sheep algorithm," Energy, Elsevier, vol. 189(C).
- Wang, Wenjie & Tai, Geyuan & Pei, Ji & Pavesi, Giorgio & Yuan, Shouqi, 2022. "Numerical investigation of the effect of the closure law of wicket gates on the transient characteristics of pump-turbine in pump mode," Renewable Energy, Elsevier, vol. 194(C), pages 719-733.
- Zhao, Zhigao & Yang, Jiandong & Huang, Yifan & Yang, Weijia & Ma, Weichao & Hou, Liangyu & Chen, Man, 2021. "Improvement of regulation quality for hydro-dominated power system: quantifying oscillation characteristic and multi-objective optimization," Renewable Energy, Elsevier, vol. 168(C), pages 606-631.
- Peng Chen & Yumin Deng & Xuegui Zhang & Li Ma & Yaoliang Yan & Yifan Wu & Chaoshun Li, 2022. "Degradation Trend Prediction of Pumped Storage Unit Based on MIC-LGBM and VMD-GRU Combined Model," Energies, MDPI, vol. 15(2), pages 1-21, January.
- Xin Xia & Jie Ji & Chao-shun Li & Xiaoming Xue & Xiaolu Wang & Chu Zhang, 2019. "Multiobjective Optimal Control for Hydraulic Turbine Governing System Based on an Improved MOGWO Algorithm," Complexity, Hindawi, vol. 2019, pages 1-14, May.
- Zhang, Yuquan & Sun, Jie & Zheng, Yuan & Ge, Xinfeng & Peng, Xuyi & Hong, Yunlai & Fernandez-Rodriguez, E., 2022. "Unsteady characteristics of lubricating oil in thrust bearing tank under different rotational speeds in pumped storage power station," Renewable Energy, Elsevier, vol. 201(P1), pages 904-915.
- Huang, Yifan & Yang, Weijia & Liao, Yiwen & Zhao, Zhigao & Ma, Weichao & Yang, Jiebin & Yang, Jiandong, 2022. "Improved transfer function method for flexible simulation of hydraulic-mechanical-electrical transient processes of hydro-power plants," Renewable Energy, Elsevier, vol. 196(C), pages 390-404.
- Xin Wu & Yanhe Xu & Jie Liu & Cong Lv & Jianzhong Zhou & Qing Zhang, 2019. "Characteristics Analysis and Fuzzy Fractional-Order PID Parameter Optimization for Primary Frequency Modulation of a Pumped Storage Unit Based on a Multi-Objective Gravitational Search Algorithm," Energies, MDPI, vol. 13(1), pages 1-20, December.
- Liu, Baonan & Zhou, Jianzhong & Xu, Yanhe & Lai, Xinjie & Shi, Yousong & Li, Mengyao, 2022. "An optimization decision-making framework for the optimal operation strategy of pumped storage hydropower system under extreme conditions," Renewable Energy, Elsevier, vol. 182(C), pages 254-273.
- Li, Chaoshun & Tang, Geng & Xue, Xiaoming & Chen, Xinbiao & Wang, Ruoheng & Zhang, Chu, 2020. "The short-term interval prediction of wind power using the deep learning model with gradient descend optimization," Renewable Energy, Elsevier, vol. 155(C), pages 197-211.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Lai, Xinjie & Li, Chaoshun & Zhou, Jianzhong & Zhang, Yongchuan & Li, Yonggang, 2020. "A multi-objective optimization strategy for the optimal control scheme of pumped hydropower systems under successive load rejections," Applied Energy, Elsevier, vol. 261(C).
- Jinjiao Hou & Chaoshun Li & Ziqin Tian & Yanhe Xu & Xinjie Lai & Nan Zhang & Taoping Zheng & Wei Wu, 2018. "Multi-Objective Optimization of Start-up Strategy for Pumped Storage Units," Energies, MDPI, vol. 11(5), pages 1-19, May.
- Hu, Jinhong & Yang, Jiebin & He, Xianghui & Zhao, Zhigao & Yang, Jiandong, 2023. "Transient analysis of a hydropower plant with a super-long headrace tunnel during load acceptance: Instability mechanism and measurement verification," Energy, Elsevier, vol. 263(PA).
- Toufani, Parinaz & Nadar, Emre & Kocaman, Ayse Selin, 2022. "Short-term assessment of pumped hydro energy storage configurations: Up, down, or closed?," Renewable Energy, Elsevier, vol. 201(P1), pages 1086-1095.
- Li, Chaoshun & Wang, Wenxiao & Chen, Deshu, 2019. "Multi-objective complementary scheduling of hydro-thermal-RE power system via a multi-objective hybrid grey wolf optimizer," Energy, Elsevier, vol. 171(C), pages 241-255.
- Lei, Liuwei & Li, Feng & Kheav, Kimleng & Jiang, Wei & Luo, Xingqi & Patelli, Edoardo & Xu, Beibei & Chen, Diyi, 2021. "A start-up optimization strategy of a hydroelectric generating system: From a symmetrical structure to asymmetric structure on diversion pipes," Renewable Energy, Elsevier, vol. 180(C), pages 1148-1165.
- Chu Zhang & Chaoshun Li & Tian Peng & Xin Xia & Xiaoming Xue & Wenlong Fu & Jianzhong Zhou, 2018. "Modeling and Synchronous Optimization of Pump Turbine Governing System Using Sparse Robust Least Squares Support Vector Machine and Hybrid Backtracking Search Algorithm," Energies, MDPI, vol. 11(11), pages 1-21, November.
- Tan Ding & Li Chang & Chaoshun Li & Chen Feng & Nan Zhang, 2018. "A Mixed-Strategy-Based Whale Optimization Algorithm for Parameter Identification of Hydraulic Turbine Governing Systems with a Delayed Water Hammer Effect," Energies, MDPI, vol. 11(9), pages 1-29, September.
- Jianzhong Zhou & Yang Zheng & Yanhe Xu & Han Liu & Diyi Chen, 2018. "A Heuristic T-S Fuzzy Model for the Pumped-Storage Generator-Motor Using Variable-Length Tree-Seed Algorithm-Based Competitive Agglomeration," Energies, MDPI, vol. 11(4), pages 1-25, April.
- Yang, Weijia & Norrlund, Per & Bladh, Johan & Yang, Jiandong & Lundin, Urban, 2018. "Hydraulic damping mechanism of low frequency oscillations in power systems: Quantitative analysis using a nonlinear model of hydropower plants," Applied Energy, Elsevier, vol. 212(C), pages 1138-1152.
- Guo, Wencheng & Yang, Jiandong, 2018. "Dynamic performance analysis of hydro-turbine governing system considering combined effect of downstream surge tank and sloping ceiling tailrace tunnel," Renewable Energy, Elsevier, vol. 129(PA), pages 638-651.
- Sheng Chen & Gaohui Li & Delou Wang & Xingtao Wang & Jian Zhang & Xiaodong Yu, 2019. "Impact of Tail Water Fluctuation on Turbine Start-Up and Optimized Regulation," Energies, MDPI, vol. 12(15), pages 1-17, July.
- Jianzhong Zhou & Zhigao Zhao & Chu Zhang & Chaoshun Li & Yanhe Xu, 2017. "A Real-Time Accurate Model and Its Predictive Fuzzy PID Controller for Pumped Storage Unit via Error Compensation," Energies, MDPI, vol. 11(1), pages 1-24, December.
- Ali, Shahid & Stewart, Rodney A. & Sahin, Oz & Vieira, Abel Silva, 2023. "Integrated GIS-AHP-based approach for off-river pumped hydro energy storage site selection," Applied Energy, Elsevier, vol. 337(C).
- Chu Zhang & Tian Peng & Chaoshun Li & Wenlong Fu & Xin Xia & Xiaoming Xue, 2019. "Multiobjective Optimization of a Fractional-Order PID Controller for Pumped Turbine Governing System Using an Improved NSGA-III Algorithm under Multiworking Conditions," Complexity, Hindawi, vol. 2019, pages 1-18, February.
- Yonggang Li & Jinjiao Hou & Juan Gu & Chaoshun Li & Yanhe Xu, 2022. "Dynamic Characteristics and Successive Start-Up Control Strategy Optimization of Pumped Storage Units under Low-Head Extreme Conditions," Energies, MDPI, vol. 15(15), pages 1-19, July.
- Bo Fu & Chenxi Ouyang & Chaoshun Li & Jinwen Wang & Eid Gul, 2019. "An Improved Mixed Integer Linear Programming Approach Based on Symmetry Diminishing for Unit Commitment of Hybrid Power System," Energies, MDPI, vol. 12(5), pages 1-14, March.
- Wencheng Guo & Daoyi Zhu, 2018. "A Review of the Transient Process and Control for a Hydropower Station with a Super Long Headrace Tunnel," Energies, MDPI, vol. 11(11), pages 1-27, November.
- Huang, Yifan & Yang, Weijia & Zhao, Zhigao & Han, Wenfu & Li, Yulan & Yang, Jiandong, 2023. "Dynamic modeling and favorable speed command of variable-speed pumped-storage unit during power regulation," Renewable Energy, Elsevier, vol. 206(C), pages 769-783.
- Yixuan Guo & Xiao Liang & Ziyu Niu & Zezhou Cao & Liuwei Lei & Hualin Xiong & Diyi Chen, 2021. "Vibration Characteristics of a Hydroelectric Generating System with Different Hydraulic-Mechanical-Electric Parameters in a Sudden Load Increasing Process," Energies, MDPI, vol. 14(21), pages 1-21, November.
More about this item
Keywords
Pumped storage power station; Closure law of guide vanes; Load rejection; Guaranteed calculation for regulation; Transient process; Multi-objective optimization;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:renene:v:139:y:2019:i:c:p:302-312. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.journals.elsevier.com/renewable-energy .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.