IDEAS home Printed from https://ideas.repec.org/a/eee/reensy/v91y2006i1p20-35.html
   My bibliography  Save this article

Risk-informed optimisation of railway tracks inspection and maintenance procedures

Author

Listed:
  • Podofillini, Luca
  • Zio, Enrico
  • Vatn, Jørn

Abstract

Nowadays, efforts are being made by the railway industry for the application of reliability-based and risk-informed approaches to maintenance optimisation of railway infrastructures, with the aim of reducing the operation and maintenance expenditures while still assuring high safety standards.

Suggested Citation

  • Podofillini, Luca & Zio, Enrico & Vatn, Jørn, 2006. "Risk-informed optimisation of railway tracks inspection and maintenance procedures," Reliability Engineering and System Safety, Elsevier, vol. 91(1), pages 20-35.
  • Handle: RePEc:eee:reensy:v:91:y:2006:i:1:p:20-35
    DOI: 10.1016/j.ress.2004.11.009
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0951832004002844
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ress.2004.11.009?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Baker, R. D. & Christer, A. H., 1994. "Review of delay-time OR modelling of engineering aspects of maintenance," European Journal of Operational Research, Elsevier, vol. 73(3), pages 407-422, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Nilsson, Jan-Eric & Odolinski, Kristofer, 2020. "When should infrastructure assets be renewed?: the economic impact of cumulative tonnes on railway infrastructure," Papers 2020:4, Research Programme in Transport Economics.
    2. Ye, Zhisheng & Li, Zhizhong & Xie, Min, 2010. "Some improvements on adaptive genetic algorithms for reliability-related applications," Reliability Engineering and System Safety, Elsevier, vol. 95(2), pages 120-126.
    3. Li Yang & Yu Zhao & Xiaobing Ma & Qingan Qiu, 2018. "An optimal inspection and replacement policy for a two-unit system," Journal of Risk and Reliability, , vol. 232(6), pages 766-776, December.
    4. Sinisterra, Wilfrido Quiñones & Lima, Victor Hugo Resende & Cavalcante, Cristiano Alexandre Virginio & Aribisala, Adetoye Ayokunle, 2023. "A delay-time model to integrate the sequence of resumable jobs, inspection policy, and quality for a single-component system," Reliability Engineering and System Safety, Elsevier, vol. 230(C).
    5. E Zio & M Librizzi & G Sansavini, 2008. "A combined Monte Carlo and cellular automata approach to the unreliability analysis of binary network systems," Journal of Risk and Reliability, , vol. 222(1), pages 31-38, March.
    6. Hu, Shenping & Fang, Quangen & Xia, Haibo & Xi, Yongtao, 2007. "Formal safety assessment based on relative risks model in ship navigation," Reliability Engineering and System Safety, Elsevier, vol. 92(3), pages 369-377.
    7. Hui Shang & Christophe Bérenguer & John Andrews, 2017. "Delayed maintenance modelling considering speed restriction for a railway section," Journal of Risk and Reliability, , vol. 231(4), pages 411-428, August.
    8. Macchi, Marco & Garetti, Marco & Centrone, Domenico & Fumagalli, Luca & Piero Pavirani, Gian, 2012. "Maintenance management of railway infrastructures based on reliability analysis," Reliability Engineering and System Safety, Elsevier, vol. 104(C), pages 71-83.
    9. Sedghi, Mahdieh & Kauppila, Osmo & Bergquist, Bjarne & Vanhatalo, Erik & Kulahci, Murat, 2021. "A taxonomy of railway track maintenance planning and scheduling: A review and research trends," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
    10. Odolinski, Kristofer, 2019. "The impact of cumulative tonnes on track failures: An empirical approach," Papers 2019:1, Research Programme in Transport Economics.
    11. Fecarotti, Claudia & Andrews, John & Pesenti, Raffaele, 2021. "A mathematical programming model to select maintenance strategies in railway networks," Reliability Engineering and System Safety, Elsevier, vol. 216(C).
    12. Wang, Wenbin, 2012. "An overview of the recent advances in delay-time-based maintenance modelling," Reliability Engineering and System Safety, Elsevier, vol. 106(C), pages 165-178.
    13. Andrews, John & Prescott, Darren & De Rozières, Florian, 2014. "A stochastic model for railway track asset management," Reliability Engineering and System Safety, Elsevier, vol. 130(C), pages 76-84.
    14. Jones, B. & Jenkinson, I. & Wang, J., 2009. "Methodology of using delay-time analysis for a manufacturing industry," Reliability Engineering and System Safety, Elsevier, vol. 94(1), pages 111-124.
    15. Yang, Li & Ma, Xiaobing & Peng, Rui & Zhai, Qingqing & Zhao, Yu, 2017. "A preventive maintenance policy based on dependent two-stage deterioration and external shocks," Reliability Engineering and System Safety, Elsevier, vol. 160(C), pages 201-211.
    16. Badía, F.G. & Berrade, M.D. & Lee, Hyunju, 2020. "An study of cost effective maintenance policies: Age replacement versus replacement after N minimal repairs," Reliability Engineering and System Safety, Elsevier, vol. 201(C).
    17. Darren Prescott & John Andrews, 2013. "A track ballast maintenance and inspection model for a rail network," Journal of Risk and Reliability, , vol. 227(3), pages 251-266, June.
    18. Jiang, R. & Chen, Zhigao, 2020. "A standard-based approach for multi-criteria performance evaluation of engineered systems," Reliability Engineering and System Safety, Elsevier, vol. 202(C).
    19. Saleh, Ali & Remenyte-Prescott, Rasa & Prescott, Darren & Chiachío, Manuel, 2024. "Intelligent and adaptive asset management model for railway sections using the iPN method," Reliability Engineering and System Safety, Elsevier, vol. 241(C).
    20. Adrian Gill & Piotr Smoczyński, 2021. "Optimization of Safety System Structures in Railway Transport," Sustainability, MDPI, vol. 13(19), pages 1-15, September.
    21. Gedik, Ridvan & Medal, Hugh & Rainwater, Chase & Pohl, Ed A. & Mason, Scott J., 2014. "Vulnerability assessment and re-routing of freight trains under disruptions: A coal supply chain network application," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 71(C), pages 45-57.
    22. Rhayma, N. & Bressolette, Ph. & Breul, P. & Fogli, M. & Saussine, G., 2013. "Reliability analysis of maintenance operations for railway tracks," Reliability Engineering and System Safety, Elsevier, vol. 114(C), pages 12-25.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Zhang, Fengxia & Shen, Jingyuan & Liao, Haitao & Ma, Yizhong, 2021. "Optimal preventive maintenance policy for a system subject to two-phase imperfect inspections," Reliability Engineering and System Safety, Elsevier, vol. 205(C).
    2. Flage, Roger, 2014. "A delay time model with imperfect and failure-inducing inspections," Reliability Engineering and System Safety, Elsevier, vol. 124(C), pages 1-12.
    3. Dekker, Rommert, 1995. "Integrating optimisation, priority setting, planning and combining of maintenance activities," European Journal of Operational Research, Elsevier, vol. 82(2), pages 225-240, April.
    4. Wang, Wenbin, 2012. "An overview of the recent advances in delay-time-based maintenance modelling," Reliability Engineering and System Safety, Elsevier, vol. 106(C), pages 165-178.
    5. Pedregal, Diego J. & Carmen Carnero, Ma., 2009. "Vibration analysis diagnostics by continuous-time models: A case study," Reliability Engineering and System Safety, Elsevier, vol. 94(2), pages 244-253.
    6. C. Drent & S. Kapodistria & J. A. C. Resing, 2019. "Condition-based maintenance policies under imperfect maintenance at scheduled and unscheduled opportunities," Queueing Systems: Theory and Applications, Springer, vol. 93(3), pages 269-308, December.
    7. Scarf, Philip A., 1997. "On the application of mathematical models in maintenance," European Journal of Operational Research, Elsevier, vol. 99(3), pages 493-506, June.
    8. Akcay, Alp, 2022. "An alert-assisted inspection policy for a production process with imperfect condition signals," European Journal of Operational Research, Elsevier, vol. 298(2), pages 510-525.
    9. Santos, Augusto César de Jesus & Cavalcante, Cristiano Alexandre Virginio & Ren, Junru & Wu, Shaomin, 2023. "A novel delay time modelling method for incorporating reuse actions in three-state single-component systems," Reliability Engineering and System Safety, Elsevier, vol. 234(C).
    10. Aven, Terje & Castro, I.T., 2009. "A delay-time model with safety constraint," Reliability Engineering and System Safety, Elsevier, vol. 94(2), pages 261-267.
    11. Wang, Wenbin, 2013. "Models of inspection, routine service, and replacement for a serviceable one-component system," Reliability Engineering and System Safety, Elsevier, vol. 116(C), pages 57-63.
    12. Si, Xiao-Sheng & Wang, Wenbin & Hu, Chang-Hua & Zhou, Dong-Hua, 2011. "Remaining useful life estimation - A review on the statistical data driven approaches," European Journal of Operational Research, Elsevier, vol. 213(1), pages 1-14, August.
    13. Crespo Marquez, Adolfo & Gupta, Jatinder N.D., 2006. "Contemporary maintenance management: process, framework and supporting pillars," Omega, Elsevier, vol. 34(3), pages 313-326, June.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:reensy:v:91:y:2006:i:1:p:20-35. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.journals.elsevier.com/reliability-engineering-and-system-safety .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.