IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v93-94y2005i1p225-229.html
   My bibliography  Save this article

Production planning: An improved hybrid approach

Author

Listed:
  • Byrne, M.D.
  • Hossain, M.M.

Abstract

No abstract is available for this item.

Suggested Citation

  • Byrne, M.D. & Hossain, M.M., 2005. "Production planning: An improved hybrid approach," International Journal of Production Economics, Elsevier, vol. 93(1), pages 225-229, January.
  • Handle: RePEc:eee:proeco:v:93-94:y:2005:i:1:p:225-229
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(04)00243-9
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Segerstedt, Anders, 1996. "A capacity-constrained multi-level inventory and production control problem," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 449-461, August.
    2. Richard L. Nolan & Michael G. Sovereign, 1972. "A Recursive Optimization and Simulation Approach to Analysis with an Application to Transportation Systems," Management Science, INFORMS, vol. 18(12), pages 676-690, August.
    3. Byrne, M. D. & Bakir, M. A., 1999. "Production planning using a hybrid simulation - analytical approach," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 305-311, March.
    4. Kim, Bokang & Kim, Sooyoung, 2001. "Extended model for a hybrid production planning approach," International Journal of Production Economics, Elsevier, vol. 73(2), pages 165-173, September.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Diaz, Juan Esteban & Handl, Julia & Xu, Dong-Ling, 2018. "Integrating meta-heuristics, simulation and exact techniques for production planning of a failure-prone manufacturing system," European Journal of Operational Research, Elsevier, vol. 266(3), pages 976-989.
    2. Manda, A.B. & Uzsoy, Reha, 2021. "Managing product transitions with learning and congestion effects," International Journal of Production Economics, Elsevier, vol. 239(C).
    3. Juan, Angel A. & Faulin, Javier & Grasman, Scott E. & Rabe, Markus & Figueira, Gonçalo, 2015. "A review of simheuristics: Extending metaheuristics to deal with stochastic combinatorial optimization problems," Operations Research Perspectives, Elsevier, vol. 2(C), pages 62-72.
    4. Jakob Asmundsson & Ronald L. Rardin & Can Hulusi Turkseven & Reha Uzsoy, 2009. "Production planning with resources subject to congestion," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(2), pages 142-157, March.
    5. Vergidis, K. & Tiwari, A. & Majeed, B. & Roy, R., 2007. "Optimisation of business process designs: An algorithmic approach with multiple objectives," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 105-121, September.
    6. Dávid Gyulai & András Pfeiffer & László Monostori, 2017. "Robust production planning and control for multi-stage systems with flexible final assembly lines," International Journal of Production Research, Taylor & Francis Journals, vol. 55(13), pages 3657-3673, July.
    7. Bilge Bilgen & Yelda Çelebi, 2013. "Integrated production scheduling and distribution planning in dairy supply chain by hybrid modelling," Annals of Operations Research, Springer, vol. 211(1), pages 55-82, December.
    8. Gopalswamy, Karthick & Uzsoy, Reha, 2021. "Conic programming models for production planning with clearing functions: Formulations and duality," European Journal of Operational Research, Elsevier, vol. 292(3), pages 953-966.
    9. Vasant, Pandian M. & Barsoum, Nader N. & Bhattacharya, Arijit, 2008. "Possibilistic optimization in planning decision of construction industry," International Journal of Production Economics, Elsevier, vol. 111(2), pages 664-675, February.
    10. Tien-Fu Liang, 2012. "Integrated manufacturing/distribution planning decisions with multiple imprecise goals in an uncertain environment," Quality & Quantity: International Journal of Methodology, Springer, vol. 46(1), pages 137-153, January.
    11. K. Taghizadeh & M. Bagherpour & I. Mahdavi, 2011. "An interactive fuzzy goal programming approach for multi-period multi-product production planning problem," Fuzzy Information and Engineering, Springer, vol. 3(4), pages 393-410, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. K. Taghizadeh & M. Bagherpour & I. Mahdavi, 2011. "An interactive fuzzy goal programming approach for multi-period multi-product production planning problem," Fuzzy Information and Engineering, Springer, vol. 3(4), pages 393-410, December.
    2. Gopalswamy, Karthick & Uzsoy, Reha, 2021. "Conic programming models for production planning with clearing functions: Formulations and duality," European Journal of Operational Research, Elsevier, vol. 292(3), pages 953-966.
    3. Tian, Feng & Willems, Sean P. & Kempf, Karl G., 2011. "An iterative approach to item-level tactical production and inventory planning," International Journal of Production Economics, Elsevier, vol. 133(1), pages 439-450, September.
    4. Umar Muhammad Modibbo & Srikant Gupta & Aquil Ahmed & Irfan Ali, 2024. "An integrated multi-objective multi-product inventory managed production planning problem under uncertain environment," Annals of Operations Research, Springer, vol. 339(3), pages 1679-1723, August.
    5. Diaz, Juan Esteban & Handl, Julia & Xu, Dong-Ling, 2018. "Integrating meta-heuristics, simulation and exact techniques for production planning of a failure-prone manufacturing system," European Journal of Operational Research, Elsevier, vol. 266(3), pages 976-989.
    6. Bilge Bilgen & Yelda Çelebi, 2013. "Integrated production scheduling and distribution planning in dairy supply chain by hybrid modelling," Annals of Operations Research, Springer, vol. 211(1), pages 55-82, December.
    7. Vasant, Pandian M. & Barsoum, Nader N. & Bhattacharya, Arijit, 2008. "Possibilistic optimization in planning decision of construction industry," International Journal of Production Economics, Elsevier, vol. 111(2), pages 664-675, February.
    8. Jaime Miranda & Pablo A. Rey & Antoine Sauré & Richard Weber, 2018. "Metro Uses a Simulation-Optimization Approach to Improve Fare-Collection Shift Scheduling," Interfaces, INFORMS, vol. 48(6), pages 529-542, November.
    9. Jakob Asmundsson & Ronald L. Rardin & Can Hulusi Turkseven & Reha Uzsoy, 2009. "Production planning with resources subject to congestion," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(2), pages 142-157, March.
    10. Djennas, Meriem & Benbouziane, Mohamed & Djennas, Mustapha, 2012. "Agent-Based Modeling in Supply Chain Management:A Genetic Algorithm and Fuzzy Logic Approach," MPRA Paper 41782, University Library of Munich, Germany.
    11. Bogataj, Marija & Grubbström, Robert W., 2012. "On the representation of timing for different structures within MRP theory," International Journal of Production Economics, Elsevier, vol. 140(2), pages 749-755.
    12. Phillip O. Kriett & Sebastian Eirich & Martin Grunow, 2017. "Cycle time-oriented mid-term production planning for semiconductor wafer fabrication," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4662-4679, August.
    13. Amirteimoori, Alireza & Kordrostami, Sohrab, 2012. "Production planning in data envelopment analysis," International Journal of Production Economics, Elsevier, vol. 140(1), pages 212-218.
    14. Manda, A.B. & Uzsoy, Reha, 2021. "Managing product transitions with learning and congestion effects," International Journal of Production Economics, Elsevier, vol. 239(C).
    15. Debels, D. & Vanhoucke, M., 2006. "A finite capacity production scheduling procedure for a belgian steel company," Vlerick Leuven Gent Management School Working Paper Series 2006-41, Vlerick Leuven Gent Management School.
    16. Ozdamar, Linet & Barbarosoglu, Gulay, 2000. "An integrated Lagrangean relaxation-simulated annealing approach to the multi-level multi-item capacitated lot sizing problem," International Journal of Production Economics, Elsevier, vol. 68(3), pages 319-331, December.
    17. Emenike, Scholastica N. & Falcone, Gioia, 2020. "A review on energy supply chain resilience through optimization," Renewable and Sustainable Energy Reviews, Elsevier, vol. 134(C).
    18. Yasser A. Davizón & César Martínez-Olvera & Rogelio Soto & Carlos Hinojosa & Piero Espino-Román, 2015. "Optimal Control Approaches to the Aggregate Production Planning Problem," Sustainability, MDPI, vol. 7(12), pages 1-16, December.
    19. Matthias Thürer & Mark Stevenson, 2016. "Workload control in job shops with re-entrant flows: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 54(17), pages 5136-5150, September.
    20. Guinet, Alain, 2001. "Multi-site planning: A transshipment problem," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 21-32, December.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:93-94:y:2005:i:1:p:225-229. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.