IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v73y2001i2p165-173.html
   My bibliography  Save this article

Extended model for a hybrid production planning approach

Author

Listed:
  • Kim, Bokang
  • Kim, Sooyoung

Abstract

No abstract is available for this item.

Suggested Citation

  • Kim, Bokang & Kim, Sooyoung, 2001. "Extended model for a hybrid production planning approach," International Journal of Production Economics, Elsevier, vol. 73(2), pages 165-173, September.
  • Handle: RePEc:eee:proeco:v:73:y:2001:i:2:p:165-173
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(00)00172-9
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Peter J. Billington & John O. McClain & L. Joseph Thomas, 1983. "Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction," Management Science, INFORMS, vol. 29(10), pages 1126-1141, October.
    2. רבקה פריאור, 1984. "נפגעי תאונות עבודה, 1982," Working Papers 382, National Insurance Institute of Israel.
    3. Byrne, M. D. & Bakir, M. A., 1999. "Production planning using a hybrid simulation - analytical approach," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 305-311, March.
    4. Zijm, W. H. M. & Buitenhek, R., 1996. "Capacity planning and lead time management," International Journal of Production Economics, Elsevier, vol. 46(1), pages 165-179, December.
    5. Ozdamar, Linet & Yazgac, Tulin, 1997. "Capacity driven due date settings in make-to-order production systems," International Journal of Production Economics, Elsevier, vol. 49(1), pages 29-44, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Haeussler, S. & Stampfer, C. & Missbauer, H., 2020. "Comparison of two optimization based order release models with fixed and variable lead times," International Journal of Production Economics, Elsevier, vol. 227(C).
    2. Diaz, Juan Esteban & Handl, Julia & Xu, Dong-Ling, 2018. "Integrating meta-heuristics, simulation and exact techniques for production planning of a failure-prone manufacturing system," European Journal of Operational Research, Elsevier, vol. 266(3), pages 976-989.
    3. Yasser A. Davizón & César Martínez-Olvera & Rogelio Soto & Carlos Hinojosa & Piero Espino-Román, 2015. "Optimal Control Approaches to the Aggregate Production Planning Problem," Sustainability, MDPI, vol. 7(12), pages 1-16, December.
    4. Safaei, Nima & Tavakkoli-Moghaddam, Reza, 2009. "Integrated multi-period cell formation and subcontracting production planning in dynamic cellular manufacturing systems," International Journal of Production Economics, Elsevier, vol. 120(2), pages 301-314, August.
    5. Jakob Asmundsson & Ronald L. Rardin & Can Hulusi Turkseven & Reha Uzsoy, 2009. "Production planning with resources subject to congestion," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(2), pages 142-157, March.
    6. Bilge Bilgen & Yelda Çelebi, 2013. "Integrated production scheduling and distribution planning in dairy supply chain by hybrid modelling," Annals of Operations Research, Springer, vol. 211(1), pages 55-82, December.
    7. Gopalswamy, Karthick & Uzsoy, Reha, 2021. "Conic programming models for production planning with clearing functions: Formulations and duality," European Journal of Operational Research, Elsevier, vol. 292(3), pages 953-966.
    8. Matthias Thürer & Mark Stevenson, 2016. "Workload control in job shops with re-entrant flows: an assessment by simulation," International Journal of Production Research, Taylor & Francis Journals, vol. 54(17), pages 5136-5150, September.
    9. Pürgstaller, Peter & Missbauer, Hubert, 2012. "Rule-based vs. optimisation-based order release in workload control: A simulation study of a MTO manufacturer," International Journal of Production Economics, Elsevier, vol. 140(2), pages 670-680.
    10. Tian, Feng & Willems, Sean P. & Kempf, Karl G., 2011. "An iterative approach to item-level tactical production and inventory planning," International Journal of Production Economics, Elsevier, vol. 133(1), pages 439-450, September.
    11. Vasant, Pandian M. & Barsoum, Nader N. & Bhattacharya, Arijit, 2008. "Possibilistic optimization in planning decision of construction industry," International Journal of Production Economics, Elsevier, vol. 111(2), pages 664-675, February.
    12. Jaime Miranda & Pablo A. Rey & Antoine Sauré & Richard Weber, 2018. "Metro Uses a Simulation-Optimization Approach to Improve Fare-Collection Shift Scheduling," Interfaces, INFORMS, vol. 48(6), pages 529-542, November.
    13. Djennas, Meriem & Benbouziane, Mohamed & Djennas, Mustapha, 2012. "Agent-Based Modeling in Supply Chain Management:A Genetic Algorithm and Fuzzy Logic Approach," MPRA Paper 41782, University Library of Munich, Germany.
    14. K. Taghizadeh & M. Bagherpour & I. Mahdavi, 2011. "An interactive fuzzy goal programming approach for multi-period multi-product production planning problem," Fuzzy Information and Engineering, Springer, vol. 3(4), pages 393-410, December.
    15. Phillip O. Kriett & Sebastian Eirich & Martin Grunow, 2017. "Cycle time-oriented mid-term production planning for semiconductor wafer fabrication," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4662-4679, August.
    16. Umar Muhammad Modibbo & Srikant Gupta & Aquil Ahmed & Irfan Ali, 2024. "An integrated multi-objective multi-product inventory managed production planning problem under uncertain environment," Annals of Operations Research, Springer, vol. 339(3), pages 1679-1723, August.
    17. Byrne, M.D. & Hossain, M.M., 2005. "Production planning: An improved hybrid approach," International Journal of Production Economics, Elsevier, vol. 93(1), pages 225-229, January.
    18. Chen-Fu Chien & Chung-Jen Kuo & Chih-Min Yu, 2020. "Tool allocation to smooth work-in-process for cycle time reduction and an empirical study," Annals of Operations Research, Springer, vol. 290(1), pages 1009-1033, July.
    19. Amirteimoori, Alireza & Kordrostami, Sohrab, 2012. "Production planning in data envelopment analysis," International Journal of Production Economics, Elsevier, vol. 140(1), pages 212-218.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Selcuk, B. & Fransoo, J.C. & De Kok, A.G., 2006. "The effect of updating lead times on the performance of hierarchical planning systems," International Journal of Production Economics, Elsevier, vol. 104(2), pages 427-440, December.
    2. Julia Pahl & Stefan Voß & David Woodruff, 2007. "Production planning with load dependent lead times: an update of research," Annals of Operations Research, Springer, vol. 153(1), pages 297-345, September.
    3. Tian, Feng & Willems, Sean P. & Kempf, Karl G., 2011. "An iterative approach to item-level tactical production and inventory planning," International Journal of Production Economics, Elsevier, vol. 133(1), pages 439-450, September.
    4. Jalali, Hamed & Carmen, Raïsa & Van Nieuwenhuyse, Inneke & Boute, Robert, 2019. "Quality and pricing decisions in production/inventory systems," European Journal of Operational Research, Elsevier, vol. 272(1), pages 195-206.
    5. Tao Wu & Leyuan Shi & Joseph Geunes & Kerem Akartunalı, 2012. "On the equivalence of strong formulations for capacitated multi-level lot sizing problems with setup times," Journal of Global Optimization, Springer, vol. 53(4), pages 615-639, August.
    6. J. F. Chen & W. E. Wilhelm, 1994. "Optimizing the allocation of components to kits in small‐lot, multiechelon assembly systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(2), pages 229-256, March.
    7. J. Drechsel & A. Kimms, 2010. "The subcoalition-perfect core of cooperative games," Annals of Operations Research, Springer, vol. 181(1), pages 591-601, December.
    8. Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
    9. Elena Katok & Holly S. Lewis & Terry P. Harrison, 1998. "Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources," Management Science, INFORMS, vol. 44(6), pages 859-877, June.
    10. Rho, Boo-Ho & Park, Kwangtae & Yu, Yung-Mok, 2001. "An international comparison of the effect of manufacturing strategy-implementation gap on business performance," International Journal of Production Economics, Elsevier, vol. 70(1), pages 89-97, March.
    11. Molleman, Eric & Slomp, Jannes & Rolefes, Samantha, 2002. "The evolution of a cellular manufacturing system - a longitudinal case study," International Journal of Production Economics, Elsevier, vol. 75(3), pages 305-322, February.
    12. Kalu, Timothy Ch. U., 1999. "Capital budgeting under uncertainty: An extended goal programming approach," International Journal of Production Economics, Elsevier, vol. 58(3), pages 235-251, January.
    13. Albino, Vito & Pontrandolfo, Pierpaolo & Scozzi, Barbara, 2002. "Analysis of information flows to enhance the coordination of production processes," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 7-19, January.
    14. Huang, Hai-Jun & Xu, Gang, 1998. "Aggregate scheduling and network solving of multi-stage and multi-item manufacturing systems," European Journal of Operational Research, Elsevier, vol. 105(1), pages 52-65, February.
    15. Phillip O. Kriett & Sebastian Eirich & Martin Grunow, 2017. "Cycle time-oriented mid-term production planning for semiconductor wafer fabrication," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4662-4679, August.
    16. Stadtler, Hartmut, 1996. "Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing," European Journal of Operational Research, Elsevier, vol. 94(3), pages 561-581, November.
    17. Kolisch, R., 2000. "Integration of assembly and fabrication for make-to-order production," International Journal of Production Economics, Elsevier, vol. 68(3), pages 287-306, December.
    18. Helber, Stefan & Sahling, Florian, 2010. "A fix-and-optimize approach for the multi-level capacitated lot sizing problem," International Journal of Production Economics, Elsevier, vol. 123(2), pages 247-256, February.
    19. Gonzalez-Benito, Javier & Suarez-Gonzalez, Isabel & Spring, Martin, 2000. "Complementarities between JIT purchasing practices: An economic analysis based on transaction costs," International Journal of Production Economics, Elsevier, vol. 67(3), pages 279-293, October.
    20. Manda, A.B. & Uzsoy, Reha, 2021. "Managing product transitions with learning and congestion effects," International Journal of Production Economics, Elsevier, vol. 239(C).

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:73:y:2001:i:2:p:165-173. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.