IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v74y2001i1-3p21-32.html
   My bibliography  Save this article

Multi-site planning: A transshipment problem

Author

Listed:
  • Guinet, Alain

Abstract

No abstract is available for this item.

Suggested Citation

  • Guinet, Alain, 2001. "Multi-site planning: A transshipment problem," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 21-32, December.
  • Handle: RePEc:eee:proeco:v:74:y:2001:i:1-3:p:21-32
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(01)00104-9
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. A. Federgruen & H. Groenevelt, 1986. "Preemptive Scheduling of Uniform Machines by Ordinary Network Flow Techniques," Management Science, INFORMS, vol. 32(3), pages 341-349, March.
    2. Kut C. So, 1990. "Some Heuristics for Scheduling Jobs on Parallel Machines with Setups," Management Science, INFORMS, vol. 36(4), pages 467-475, April.
    3. Michael Florian & Morton Klein, 1971. "Deterministic Production Planning with Concave Costs and Capacity Constraints," Management Science, INFORMS, vol. 18(1), pages 12-20, September.
    4. Segerstedt, Anders, 1996. "A capacity-constrained multi-level inventory and production control problem," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 449-461, August.
    5. Udatta S. Palekar & Mark H. Karwan & Stanley Zionts, 1990. "A Branch-and-Bound Method for the Fixed Charge Transportation Problem," Management Science, INFORMS, vol. 36(9), pages 1092-1105, September.
    6. Ali Dogramaci & Julius Surkis, 1979. "Evaluation of a Heuristic for Scheduling Independent Jobs on Parallel Identical Processors," Management Science, INFORMS, vol. 25(12), pages 1208-1216, December.
    7. Henry Gabbay, 1979. "Multi-Stage Production Planning," Management Science, INFORMS, vol. 25(11), pages 1138-1148, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Tsiakis, Panagiotis & Papageorgiou, Lazaros G., 2008. "Optimal production allocation and distribution supply chain networks," International Journal of Production Economics, Elsevier, vol. 111(2), pages 468-483, February.
    2. Caner TaskIn, Z. & Tamer Ünal, A., 2009. "Tactical level planning in float glass manufacturing with co-production, random yields and substitutable products," European Journal of Operational Research, Elsevier, vol. 199(1), pages 252-261, November.
    3. Hsu, Chaug-Ing & Li, Hui-Chieh, 2009. "An integrated plant capacity and production planning model for high-tech manufacturing firms with economies of scale," International Journal of Production Economics, Elsevier, vol. 118(2), pages 486-500, April.
    4. Ali Gharaei & Fariborz Jolai, 2021. "A Pareto approach for the multi-factory supply chain scheduling and distribution problem," Operational Research, Springer, vol. 21(4), pages 2333-2364, December.
    5. Tsai, Kune-muh & Wang, Shan-chi, 2009. "Multi-site available-to-promise modeling for assemble-to-order manufacturing: An illustration on TFT-LCD manufacturing," International Journal of Production Economics, Elsevier, vol. 117(1), pages 174-184, January.
    6. Leung, Stephen C.H. & Tsang, Sally O.S. & Ng, W.L. & Wu, Yue, 2007. "A robust optimization model for multi-site production planning problem in an uncertain environment," European Journal of Operational Research, Elsevier, vol. 181(1), pages 224-238, August.
    7. J. Behnamian & S. M. T. Fatemi Ghomi, 2016. "A survey of multi-factory scheduling," Journal of Intelligent Manufacturing, Springer, vol. 27(1), pages 231-249, February.
    8. Chung, S.H. & Lau, H.C.W. & Choy, K.L. & Ho, G.T.S. & Tse, Y.K., 2010. "Application of genetic approach for advanced planning in multi-factory environment," International Journal of Production Economics, Elsevier, vol. 127(2), pages 300-308, October.
    9. Moritz Julius Ziegler & Kilian Seifried & Philipp Kuske & Moritz Fleischmann, 2019. "TRUMPF Uses a Mixed Integer Model as Decision Support for Strategic Production Network Design," Interfaces, INFORMS, vol. 49(3), pages 213-226, May.
    10. Li-Chih Wang & Chen-Yang Cheng & Wen-Kuan Wang, 2016. "Flexible supply network planning for hybrid shipment: a case study of memory module industry," International Journal of Production Research, Taylor & Francis Journals, vol. 54(2), pages 444-458, January.
    11. (Yale) Gong, Yeming & Yücesan, Enver, 2012. "Stochastic optimization for transshipment problems with positive replenishment lead times," International Journal of Production Economics, Elsevier, vol. 135(1), pages 61-72.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ming Zhao & Minjiao Zhang, 2020. "Multiechelon Lot Sizing: New Complexities and Inequalities," Operations Research, INFORMS, vol. 68(2), pages 534-551, March.
    2. Li Chen & Hau L. Lee, 2012. "Bullwhip Effect Measurement and Its Implications," Operations Research, INFORMS, vol. 60(4), pages 771-784, August.
    3. Stan van Hoesel & H. Edwin Romeijn & Dolores Romero Morales & Albert P. M. Wagelmans, 2005. "Integrated Lot Sizing in Serial Supply Chains with Production Capacities," Management Science, INFORMS, vol. 51(11), pages 1706-1719, November.
    4. Ben Klemens, 2021. "Attributing Value to Patents and Trademarks in Complex Production Chains," Journal of the Knowledge Economy, Springer;Portland International Center for Management of Engineering and Technology (PICMET), vol. 12(2), pages 842-875, June.
    5. Awi Federgruen & Joern Meissner & Michal Tzur, 2007. "Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems," Operations Research, INFORMS, vol. 55(3), pages 490-502, June.
    6. C N Potts & V A Strusevich, 2009. "Fifty years of scheduling: a survey of milestones," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 41-68, May.
    7. Cortés, Pablo & Muñuzuri, Jesús & Guadix, José & Onieva, Luis, 2013. "Optimal algorithm for the demand routing problem in multicommodity flow distribution networks with diversification constraints and concave costs," International Journal of Production Economics, Elsevier, vol. 146(1), pages 313-324.
    8. Karla E. Bourland & Candace Arai Yano, 1996. "Lot sizing when yields increase during the production run," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(8), pages 1035-1047, December.
    9. Atamturk, Alper & Munoz, Juan Carlos, 2002. "A Study of the Lot-Sizing Polytope," University of California Transportation Center, Working Papers qt6zz2g0z4, University of California Transportation Center.
    10. Bogataj, Marija & Grubbström, Robert W., 2012. "On the representation of timing for different structures within MRP theory," International Journal of Production Economics, Elsevier, vol. 140(2), pages 749-755.
    11. Sedeno-Noda, A. & Alcaide, D. & Gonzalez-Martin, C., 2006. "Network flow approaches to pre-emptive open-shop scheduling problems with time-windows," European Journal of Operational Research, Elsevier, vol. 174(3), pages 1501-1518, November.
    12. Rademeyer, Maryke C. & Minnitt, Richard C.A. & Falcon, Rosemary M.S., 2018. "Revisiting operating cost in resource extraction industries," Resources Policy, Elsevier, vol. 58(C), pages 159-164.
    13. Dhaenens-Flipo, Clarisse, 2001. "A bicriterion approach to deal with a constrained single-objective problem," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 93-101, December.
    14. van Hoesel, C.P.M. & Wagelmans, A., 1997. "Fully polynomial approximation schemes for single-item capacitated economic lot-sizing problems," Research Memorandum 029, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
    15. Yongpei Guan, 2011. "Stochastic lot-sizing with backlogging: computational complexity analysis," Journal of Global Optimization, Springer, vol. 49(4), pages 651-678, April.
    16. Joseph B. Mazzola & William F. McCoy & Harvey M. Wagner, 1987. "Algorithms and heuristics for variable‐yield lot sizing," Naval Research Logistics (NRL), John Wiley & Sons, vol. 34(1), pages 67-86, February.
    17. Debels, D. & Vanhoucke, M., 2006. "A finite capacity production scheduling procedure for a belgian steel company," Vlerick Leuven Gent Management School Working Paper Series 2006-41, Vlerick Leuven Gent Management School.
    18. Pan, Zhendong & Tang, Jiafu & Liu, Ou, 2009. "Capacitated dynamic lot sizing problems in closed-loop supply chain," European Journal of Operational Research, Elsevier, vol. 198(3), pages 810-821, November.
    19. Ventura, José A. & Valdebenito, Victor A. & Golany, Boaz, 2013. "A dynamic inventory model with supplier selection in a serial supply chain structure," European Journal of Operational Research, Elsevier, vol. 230(2), pages 258-271.
    20. Christos Koulamas, 1997. "Decomposition and hybrid simulated annealing heuristics for the parallel‐machine total tardiness problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(1), pages 109-125, February.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:74:y:2001:i:1-3:p:21-32. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.