Integrated manufacturing/distribution planning decisions with multiple imprecise goals in an uncertain environment
Author
Abstract
Suggested Citation
DOI: 10.1007/s11135-010-9333-9
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- R. E. Bellman & L. A. Zadeh, 1970. "Decision-Making in a Fuzzy Environment," Management Science, INFORMS, vol. 17(4), pages 141-164, December.
- Sabri, Ehap H. & Beamon, Benita M., 2000. "A multi-objective approach to simultaneous strategic and operational planning in supply chain design," Omega, Elsevier, vol. 28(5), pages 581-598, October.
- Petrovic, Dobrila & Roy, Rajat & Petrovic, Radivoj, 1998. "Modelling and simulation of a supply chain in an uncertain environment," European Journal of Operational Research, Elsevier, vol. 109(2), pages 299-309, September.
- Bhattacharya, Arijit & Vasant, Pandian, 2007. "Soft-sensing of level of satisfaction in TOC product-mix decision heuristic using robust fuzzy-LP," European Journal of Operational Research, Elsevier, vol. 177(1), pages 55-70, February.
- Hintz, G. W. & Zimmermann, H. -J., 1989. "A method to control flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 41(3), pages 321-334, August.
- Byrne, M. D. & Bakir, M. A., 1999. "Production planning using a hybrid simulation - analytical approach," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 305-311, March.
- Beamon, Benita M., 1998. "Supply chain design and analysis:: Models and methods," International Journal of Production Economics, Elsevier, vol. 55(3), pages 281-294, August.
- Rommelfanger, Heinrich, 1996. "Fuzzy linear programming and applications," European Journal of Operational Research, Elsevier, vol. 92(3), pages 512-527, August.
- Xie, Ying & Petrovic, Dobrila & Burnham, Keith, 2006. "A heuristic procedure for the two-level control of serial supply chains under fuzzy customer demand," International Journal of Production Economics, Elsevier, vol. 102(1), pages 37-50, July.
- Byrne, M.D. & Hossain, M.M., 2005. "Production planning: An improved hybrid approach," International Journal of Production Economics, Elsevier, vol. 93(1), pages 225-229, January.
- Giannoccaro, Ilaria & Pontrandolfo, Pierpaolo & Scozzi, Barbara, 2003. "A fuzzy echelon approach for inventory management in supply chains," European Journal of Operational Research, Elsevier, vol. 149(1), pages 185-196, August.
- Abd El-Wahed, Waiel F. & Lee, Sang M., 2006. "Interactive fuzzy goal programming for multi-objective transportation problems," Omega, Elsevier, vol. 34(2), pages 158-166, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Che-Wei Chang, 2022. "Supply chain movement risk in the sneaker industry: an empirical study," Quality & Quantity: International Journal of Methodology, Springer, vol. 56(3), pages 1073-1092, June.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Shih-Pin Chen, 2017. "Effects of fuzzy data on decision making in a competitive supply chain," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(10), pages 1146-1160, October.
- Tang, Christopher S. & Davarzani, Hoda & Sarkis, Joseph, 2015. "Quantitative models for managing supply chain risks: A reviewAuthor-Name: Fahimnia, Behnam," European Journal of Operational Research, Elsevier, vol. 247(1), pages 1-15.
- Wong, Bo K. & Lai, Vincent S., 2011. "A survey of the application of fuzzy set theory in production and operations management: 1998-2009," International Journal of Production Economics, Elsevier, vol. 129(1), pages 157-168, January.
- Vasant, Pandian M. & Barsoum, Nader N. & Bhattacharya, Arijit, 2008. "Possibilistic optimization in planning decision of construction industry," International Journal of Production Economics, Elsevier, vol. 111(2), pages 664-675, February.
- Peidro, David & Mula, Josefa & Jiménez, Mariano & del Mar Botella, Ma, 2010. "A fuzzy linear programming based approach for tactical supply chain planning in an uncertainty environment," European Journal of Operational Research, Elsevier, vol. 205(1), pages 65-80, August.
- Emenike, Scholastica N. & Falcone, Gioia, 2020. "A review on energy supply chain resilience through optimization," Renewable and Sustainable Energy Reviews, Elsevier, vol. 134(C).
- Wang, Juite & Shu, Yun-Feng, 2007. "A possibilistic decision model for new product supply chain design," European Journal of Operational Research, Elsevier, vol. 177(2), pages 1044-1061, March.
- Zhao, Jing & Tang, Wansheng & Zhao, Ruiqing & Wei, Jie, 2012. "Pricing decisions for substitutable products with a common retailer in fuzzy environments," European Journal of Operational Research, Elsevier, vol. 216(2), pages 409-419.
- Jie Wei & Jing Zhao, 2016. "Pricing decisions for substitutable products with horizontal and vertical competition in fuzzy environments," Annals of Operations Research, Springer, vol. 242(2), pages 505-528, July.
- Gnoni, M. G. & Iavagnilio, R. & Mossa, G. & Mummolo, G. & Di Leva, A., 2003. "Production planning of a multi-site manufacturing system by hybrid modelling: A case study from the automotive industry," International Journal of Production Economics, Elsevier, vol. 85(2), pages 251-262, August.
- Berna Tektaş & Hasan Hüseyin Turan & Nihat Kasap & Ferhan Çebi & Dursun Delen, 2022. "A Fuzzy Prescriptive Analytics Approach to Power Generation Capacity Planning," Energies, MDPI, vol. 15(9), pages 1-26, April.
- Mikhailov, L., 2004. "A fuzzy approach to deriving priorities from interval pairwise comparison judgements," European Journal of Operational Research, Elsevier, vol. 159(3), pages 687-704, December.
- Chen, Chen-Tung & Huang, Sue-Fen, 2006. "Order-fulfillment ability analysis in the supply-chain system with fuzzy operation times," International Journal of Production Economics, Elsevier, vol. 101(1), pages 185-193, May.
- Tien-Fu Liang & Tien-Shou Huang & Ming-Feng Yang, 2012. "Application of fuzzy mathematical programming to imprecise project management decisions," Quality & Quantity: International Journal of Methodology, Springer, vol. 46(5), pages 1451-1470, August.
- Chen, Shih-Pin & Tsai, Ming-Jiun, 2011. "Time-cost trade-off analysis of project networks in fuzzy environments," European Journal of Operational Research, Elsevier, vol. 212(2), pages 386-397, July.
- Sakawa, Masatoshi & Kato, Kosuke & Nishizaki, Ichiro, 2003. "An interactive fuzzy satisficing method for multiobjective stochastic linear programming problems through an expectation model," European Journal of Operational Research, Elsevier, vol. 145(3), pages 665-672, March.
- Manda, A.B. & Uzsoy, Reha, 2021. "Managing product transitions with learning and congestion effects," International Journal of Production Economics, Elsevier, vol. 239(C).
- K. Taghizadeh & M. Bagherpour & I. Mahdavi, 2011. "An interactive fuzzy goal programming approach for multi-period multi-product production planning problem," Fuzzy Information and Engineering, Springer, vol. 3(4), pages 393-410, December.
- Lokesh Nagar & Pankaj Dutta & Karuna Jain, 2014. "An integrated supply chain model for new products with imprecise production and supply under scenario dependent fuzzy random demand," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(5), pages 873-887, May.
- Qin, Zhongfeng & Ji, Xiaoyu, 2010. "Logistics network design for product recovery in fuzzy environment," European Journal of Operational Research, Elsevier, vol. 202(2), pages 479-490, April.
More about this item
Keywords
Manufacturing/distribution planning decisions; Possibilistic linear programming; Supply chains; Fuzzy set; Multi-objective linear programming;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:qualqt:v:46:y:2012:i:1:p:137-153. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.