IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v104y1998i3p403-422.html
   My bibliography  Save this article

A hierarchical decision support system for production planning (with case study)

Author

Listed:
  • Ozdamar, Linet
  • Bozyel, M. Ali
  • Birbil, S. Ilker

Abstract

No abstract is available for this item.

Suggested Citation

  • Ozdamar, Linet & Bozyel, M. Ali & Birbil, S. Ilker, 1998. "A hierarchical decision support system for production planning (with case study)," European Journal of Operational Research, Elsevier, vol. 104(3), pages 403-422, February.
  • Handle: RePEc:eee:ejores:v:104:y:1998:i:3:p:403-422
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(97)00016-7
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Axsater, Sven & Jonsson, Henrik, 1984. "Aggregation and disaggregation in hierarchical production planning," European Journal of Operational Research, Elsevier, vol. 17(3), pages 338-350, September.
    2. J. Erschler & G. Fontan & C. Merce, 1986. "Consistency of the Disaggregation Process in Hierarchical Planning," Operations Research, INFORMS, vol. 34(3), pages 464-469, June.
    3. Schneewei[beta], Christoph, 1995. "Hierarchical structures in organisations: A conceptual framework," European Journal of Operational Research, Elsevier, vol. 86(1), pages 4-31, October.
    4. Te'eni, Dov & Ginzberg, Michael J., 1991. "Human-computer decision systems: The multiple roles of DSS," European Journal of Operational Research, Elsevier, vol. 50(2), pages 127-139, January.
    5. Matthew J. Liberatore & Tan Miller, 1985. "A Hierarchical Production Planning System," Interfaces, INFORMS, vol. 15(4), pages 1-11, August.
    6. Carravilla, Maria Antonia & de Sousa, Jorge Pinho, 1995. "Hierarchical production planning in a make-to-order company: A case study," European Journal of Operational Research, Elsevier, vol. 86(1), pages 43-56, October.
    7. Gabriel R. Bitran & Elizabeth A. Haas & Arnoldo C. Hax, 1981. "Hierarchical Production Planning: A Single Stage System," Operations Research, INFORMS, vol. 29(4), pages 717-743, August.
    8. Rutten, W. G. M. M., 1993. "Hierarchical mathematical programming for operational planning in a process industry," European Journal of Operational Research, Elsevier, vol. 64(3), pages 363-369, February.
    9. Tsubone, Hitoshi & Sugawara, Mitsumasa, 1987. "A hierarchical production planning system in the motor industry," Omega, Elsevier, vol. 15(2), pages 113-120.
    10. Gabriel R. Bitran & Arnoldo C. Hax, 1981. "Disaggregation and Resource Allocation Using Convex Knapsack Problems with Bounded Variables," Management Science, INFORMS, vol. 27(4), pages 431-441, April.
    11. Viviers, Francois, 1983. "A decision support system for job shop scheduling," European Journal of Operational Research, Elsevier, vol. 14(1), pages 95-103, September.
    12. Moreira, Nuno Alexandre & Oliveira, Rui Carvalho, 1991. "A decision support system for production planning in an industrial unit," European Journal of Operational Research, Elsevier, vol. 55(3), pages 319-328, December.
    13. Speranza, M. Grazia & Woerlee, Auke P., 1991. "A decision support system for operational production scheduling," European Journal of Operational Research, Elsevier, vol. 55(3), pages 329-343, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ozdamar, Linet & Birbil, Sevket Ilker, 1999. "A hierarchical planning system for energy intensive production environments," International Journal of Production Economics, Elsevier, vol. 58(2), pages 115-129, January.
    2. Vicens, E. & Alemany, M. E. & Andres, C. & Guarch, J. J., 2001. "A design and application methodology for hierarchical production planning decision support systems in an enterprise integration context," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 5-20, December.
    3. S C H Leung & Y Wu & K K Lai, 2006. "A stochastic programming approach for multi-site aggregate production planning," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(2), pages 123-132, February.
    4. Mitra, Sovan & Karathanasopoulos, Andreas & Sermpinis, Georgios & Dunis, Christian & Hood, John, 2015. "Operational risk: Emerging markets, sectors and measurement," European Journal of Operational Research, Elsevier, vol. 241(1), pages 122-132.
    5. Abdinnour-Helm, Sue & Lengnick-Hall, Mark L. & Lengnick-Hall, Cynthia A., 2003. "Pre-implementation attitudes and organizational readiness for implementing an Enterprise Resource Planning system," European Journal of Operational Research, Elsevier, vol. 146(2), pages 258-273, April.
    6. Xue, Guisen & Felix Offodile, O. & Zhou, Hong & Troutt, Marvin D., 2011. "Integrated production planning with sequence-dependent family setup times," International Journal of Production Economics, Elsevier, vol. 131(2), pages 674-681, June.
    7. repec:dgr:rugsom:02a12 is not listed on IDEAS
    8. Mirzapour Al-e-hashem, S.M.J. & Malekly, H. & Aryanezhad, M.B., 2011. "A multi-objective robust optimization model for multi-product multi-site aggregate production planning in a supply chain under uncertainty," International Journal of Production Economics, Elsevier, vol. 134(1), pages 28-42, November.
    9. Wernz, Christian & Deshmukh, Abhijit, 2010. "Multiscale decision-making: Bridging organizational scales in systems with distributed decision-makers," European Journal of Operational Research, Elsevier, vol. 202(3), pages 828-840, May.
    10. Tom Vogel & Bernardo Almada-Lobo & Christian Almeder, 2017. "Integrated versus hierarchical approach to aggregate production planning and master production scheduling," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 193-229, January.
    11. Sali, Mustapha & Ghrab, Yahya & Chatras, Clément, 2023. "Optimal product aggregation for sales and operations planning in mass customisation context," International Journal of Production Economics, Elsevier, vol. 263(C).
    12. Wernz, Christian & Deshmukh, Abhijit, 2012. "Unifying temporal and organizational scales in multiscale decision-making," European Journal of Operational Research, Elsevier, vol. 223(3), pages 739-751.
    13. D Petrovic & O Aköz, 2008. "A fuzzy goal programming approach to integrated loading and scheduling of a batch processing machine," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(9), pages 1211-1219, September.
    14. Chowdary, Boppana V. & Slomp, Jannes, 2002. "Production planning under dynamic product environment: a multi-objective goal programming approach," Research Report 02A12, University of Groningen, Research Institute SOM (Systems, Organisations and Management).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Vicens, E. & Alemany, M. E. & Andres, C. & Guarch, J. J., 2001. "A design and application methodology for hierarchical production planning decision support systems in an enterprise integration context," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 5-20, December.
    2. Huang, Hai-Jun & Xu, Gang, 1998. "Aggregate scheduling and network solving of multi-stage and multi-item manufacturing systems," European Journal of Operational Research, Elsevier, vol. 105(1), pages 52-65, February.
    3. Gfrerer, Helmut & Zapfel, Gunther, 1995. "Hierarchical model for production planning in the case of uncertain demand," European Journal of Operational Research, Elsevier, vol. 86(1), pages 142-161, October.
    4. Xue, Guisen & Felix Offodile, O. & Zhou, Hong & Troutt, Marvin D., 2011. "Integrated production planning with sequence-dependent family setup times," International Journal of Production Economics, Elsevier, vol. 131(2), pages 674-681, June.
    5. Bitran, Gabriel R. & Tirupati, Devanath., 1989. "Hierarchical production planning," Working papers 3017-89., Massachusetts Institute of Technology (MIT), Sloan School of Management.
    6. Ozdamar, Linet & Yazgac, Tulin, 1997. "Capacity driven due date settings in make-to-order production systems," International Journal of Production Economics, Elsevier, vol. 49(1), pages 29-44, March.
    7. Zapfel, Gunther, 1996. "Production planning in the case of uncertain individual demand Extension for an MRP II concept," International Journal of Production Economics, Elsevier, vol. 46(1), pages 153-164, December.
    8. Selcuk, B. & Fransoo, J.C. & De Kok, A.G., 2006. "The effect of updating lead times on the performance of hierarchical planning systems," International Journal of Production Economics, Elsevier, vol. 104(2), pages 427-440, December.
    9. Patriksson, Michael, 2008. "A survey on the continuous nonlinear resource allocation problem," European Journal of Operational Research, Elsevier, vol. 185(1), pages 1-46, February.
    10. Tom Vogel & Bernardo Almada-Lobo & Christian Almeder, 2017. "Integrated versus hierarchical approach to aggregate production planning and master production scheduling," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 193-229, January.
    11. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    12. Schneewei[beta], Christoph, 1995. "Hierarchical structures in organisations: A conceptual framework," European Journal of Operational Research, Elsevier, vol. 86(1), pages 4-31, October.
    13. Bretthauer, Kurt M. & Shetty, Bala, 2002. "The nonlinear knapsack problem - algorithms and applications," European Journal of Operational Research, Elsevier, vol. 138(3), pages 459-472, May.
    14. Gahm, Christian & Uzunoglu, Aykut & Wahl, Stefan & Ganschinietz, Chantal & Tuma, Axel, 2022. "Applying machine learning for the anticipation of complex nesting solutions in hierarchical production planning," European Journal of Operational Research, Elsevier, vol. 296(3), pages 819-836.
    15. Zhang, Jianzhong & Xu, Chengxian, 2010. "Inverse optimization for linearly constrained convex separable programming problems," European Journal of Operational Research, Elsevier, vol. 200(3), pages 671-679, February.
    16. Mohammadivojdan, Roshanak & Geunes, Joseph, 2018. "The newsvendor problem with capacitated suppliers and quantity discounts," European Journal of Operational Research, Elsevier, vol. 271(1), pages 109-119.
    17. Stan Van Hoesel & Albert Wagelmans, 2007. "Editorial introduction," Statistica Neerlandica, Netherlands Society for Statistics and Operations Research, vol. 61(1), pages 1-3, February.
    18. Samaddar, Subhashish & Rabinowitz, Gad & Zhang, Guoqiang Peter, 2005. "An experimental analysis of solution performance in a resource sharing and scheduling problem," European Journal of Operational Research, Elsevier, vol. 165(1), pages 139-156, August.
    19. Walter, Rico & Boysen, Nils & Scholl, Armin, 2013. "The discrete forward–reserve problem – Allocating space, selecting products, and area sizing in forward order picking," European Journal of Operational Research, Elsevier, vol. 229(3), pages 585-594.
    20. Golenko-Ginzburg, Dimitri & Sinuany-Stern, Zilla & Kats, Vladimir, 1996. "A multilevel decision-making system with multiple resources for controlling cotton harvesting," International Journal of Production Economics, Elsevier, vol. 46(1), pages 55-63, December.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:104:y:1998:i:3:p:403-422. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.